Post Job Free
Sign in

Quality Control Project

Location:
Saint Francisville, LA, 70775
Posted:
April 08, 2011

Contact this candidate

Resume:

EARL E. LEE, JR. ***** Jacock Road

St. Francisville, Louisiana 70775

Cell Phone: 225-***-****

Home Phone: 225-***-****

Experience L-Con Construction at Cleco Power, Baldwin, Louisiana

*/*0 to 1/15/2011 QA/QC Manager

Ground up build of Unit 4 Black Start Project (GE-F6 Turbine

Generator)

Responsible for over seeing quality for entire project.

. Responsible for all sub-contractors which included

dirt, civil, mechanical, structural and

electrical.

. Weld map and NDE of total job site.

. Final system package build and finalize with

client and contractors

9/02 to 3/30/10 Pala Interstate Contractors, Baton Rouge, Louisiana

Corporate Quality Control General Construction Manager

Responsible for ensuring implementation of Pala

Interstate's Quality Assurance Program on all field and

shop projects.

Duties include but are not limited to:

. Work scope review for code and specification

requirements

. Responsible for training and support for eight

site CWI's

. Development of Project Quality Plans

. Training of Supervisors and craftspersons

. Project Quality audits and Improvement Plans

. Root cause investigation of non-conformances

. Developing Weld procedures, testing welders,

generating certification documentation

. NDE, heat treatments, source inspections, final

acceptance and turnover coordinate, oversee and

/or execute field code repairs

7/97 to 9/02 Performance Contractors, Baton Rouge, Louisiana

Welding Inspector/Quality Control for various projects.

Projects working

on and successfully completed:

. Honeywell, St.Gabriel, Louisiana

Expansion Project. Responsible for weld tracking,

record keeping, monitoring of all welding on the

job site, assist X-Ray crews and building system

packages which includes boiler code work.

. Ciba Specialty Chemicals, West Memphis, Arkansas

Two years QA/QC. Responsible for weld tracking,

record keeping, monitoring of all welding on the

job site, assist X-Ray crews and building system

packages which included boiler code work.

. Rubicon Inc., Geismar, Louisiana

MDI3 Zipper Project - Responsible for welding

procedures, work is done to the clients

specifications, hydro testing, civil, structural,

equipment inspection and final sell of packages to

the client. Also responsible for sub-contractors

which includes electrical, paint and insulation.

. Dow, Freeport, Texas

QA/QC Manager for all of Perforamances projects in

Texas, which include plant A, B and Ostyer Creek

Division. Was responsible for welding procedures,

work is done to clients specifications, testing of

welders on site, hydro testing, civil, structural,

equipment inspection and final sell of packages to

the client. Also responsible for sub-contractors

which includes electrical, paint and insulation.

. BASF,Wyandotte, Louisiana

Cogen II Unit - Responsible for weld tracking,

record keeping, monitoring of all welding on job

site, assist X-Ray crew and building of all system

packages which included boiler code work.

. CF Industries, Donaldsonville, Louisiana

Granulation, Neo Acid Unit - Responsible for weld

tracking, record keeping, monitor all welding on

job site, assist X-Ray crew and NDE/PMI work on

various materials.

. Exxon, Baton Rouge, Louisiana

EPLA South, Compressor houses re-vamp-turnaround.

Responsible for weld tracking, record keeping,

monitoring of all welding on the job site, assist

X-Ray crew and NDE/PMI work on various materials.

7/96 to 7/97 CECOS International, Walker, Louisiana

Welding and Quality Control Inspector for Livingston

Facility New Expansion Project. Coordinator of pipelines,

and tank farm construction.

6/95 to 7/96 PSI, Baton Rouge, Louisiana

Mechanical Supervisor for ground water and Lechate

Projects.

7/94 to 6/95 J. E. Merit - Exxon, Baton Rouge, Louisiana

Welding Inspector for ByPass Piping and Oxo Turnaround

Projects. Inspected welds, made well maps, assisted x-ray

team in location of welds, made overlays for repairs, and

inspected reactor shell for clad work.

1/94 to 7/94 Veco Oil, Kenia, Alaska

Welding Inspector/Quality Control Coordinator at Steel Head

Production Platform Project. Wrote welding procedures,

verified work met drawings specs/codes, made weld maps,

tested welders and trouble shot problems.

1/92 to 1/94 Jim Best Construction - Grady Crawford Construction

Mechanical Superintendent for Rollins Environmental

Services Project ($1.2 million expansion) and Dow Chemical

- Poly C Project ($3.5 million expansion). Supervised

approximately 80 people for each project.

1/86 to 1/92 American Constructors, Inc., Baton Rouge, Louisiana

Project Superintendent. Responsible for all projects

including scheduling, specifications, cost, and supervising

up to 80 employees.

References upon request



Contact this candidate