Raj Sanne
**** **** ******* ***. ***, Little Rock AR 72205
Phone-501-***-****
abhno0@r.postjobfree.com
An Industrial Engineer with over 12 years of progressive experience in
manufacturing and service organizations. Proven track record of
accomplishments in cost and flow time improvements. Excellent ability to
assimilate and apply new concepts to support business solutions and growth.
Strong background in:
. Lean Manufacturing
. Six Sigma & Kaizen
. Process Improvements
. Plant Layout & Line Balancing
. Costing & Incentive Plans
. Quality, & Project Management
. Training
. Ergonomics
OBJECTIVE:
Looking for an
interesting position where I can utilize my education and experience in
lean manufacturing, six sigma, cost reduction and process improvements.
PROFESSIONAL EXPERIENCE:
WELSPUN PIPES INC. LITTLE ROCK AR Quality
Engineer (Contract) Feb-March 2010
QC reporting and documentation, Training
HAWKER BEECHCRAFT CORPORATION LITTLE ROCK AR
Manufacturing Engineer May 2008 -
Aug 2009
. Designed and implemented a point-of-use kitting system for
assembly processes
. Simulated and implemented a production flow system for aircraft
completions
. Designed and implemented a new layout for shipping operations.
. Designed and implemented new layout and storage system for
upholstery shop
. Lead time reduction through root cause analysis of turn around
time in vendor processed parts by 70%
. Outsourcing of sound proofing insulation material kits
. Cost reduction through estimation of honeycomb panel sizes and
quantities for CNC routing and kitting
. Determination of box dimensions for kitting honeycomb panels
IC Corporation.
Conway AR
Manufacturing Engineer
May 2006 to Feb 2008
Involved in process improvements, layouts, project management. Achieved
. 40% savings in flow time through layout improvements, ergonomics,
material handling
. Implemented a new layout without any cost or time overrun
. Identified $100k tooling, fixtures and torque tools for new product
manufacturing
. Designed, planned and implemented an assembly process for a new
product
. Documented and established standards for various products Involved
in process improvements, layouts, project management etc
BOEING Aerospace Systems Support Center San Antonio TX
Industrial Engineer (contract) June-Aug 2005
. Involved in lean package implementation through process flow
charting, precedence diagrams, employee involvement, time
studies, production scheduling and monitoring
Gulfstream Aerospace
Brunswick GA Industrial
Engineer (contract) Jan-March 2005
Achieved
o 50% reduction in cycle time
o 70% reduction in standard hours
o 30% reduced space
o 50% material savings
o $550K savings
through application of lean manufacturing principles, cellular layout,
value stream mapping, 5S, time standards, tooling, work instructions in
upholstery shop
Part time April -December 2004
Projects: Inventory reduction, reorganization and
data base design for storage and control maintenance tools
Mid South Engineering Hot
Springs AR
Industrial Engineer (contract)
Feb - March 2004
Achieved
. 40% reduction in operational cost
. 60% reduction in handling cost of molten metal between furnace and
pressure die casting machines
. 30% reduction in number of fork lifts used in moving molten metal from
furnace to pressure die casting machines t
through plant layout reconfiguration and other improvements in a pressure
die casting foundry
Dassault Falcon Jet Corp Little Rock
AR
Industrial Engineer Aug.
1999 to Sep. 2003
Achieved
. 40% savings in cost
. 60% cycle time reduction
. 30% material savings
through process changes, lean manufacturing principles, line balancing,
work station design, six sigma, kaizen, root cause analysis, cost
benefit analysis, work instructions, time studies, process
documentation, plant layout, JIT, 5S, 8D etc in various areas.
Deluxe Corporation,
Dallas, TX Process Specialist
Oct. 1998 to April 1999
. Achieved cost reduction through employee training in SPC, scrap
recycling and other techniques. development and implementation of
metrics for Activity Based Costing System
Kendall Sherwood Davis and Geck, Commerce, TX
Industrial Engineer
Feb. 1998 to Aug. 1998
. Successfully generated cost savings through layout, ergonomic and
operational improvements, quality monitoring, kaizen events, 5S, GMP,
etc
Taylor Machine Works,
Louisville, MS
Industrial Engineer
Nov. 1995 to Sept. 1997
. Successfully developed productivity monitoring and reporting system
for senior management, designed incentive plans, productivity and
capacity improvements
EDUCATION:
Bachelor of Science-Industrial Engineering IIIE, Bombay, India
(1982)
Bachelor of Science -Math, Physics
Osmania University, Hyderabad, India (1972)
CERTIFICATION
Lean Manufacturing
PROFESSIONAL TRAINING
. Lean manufacturing, Value stream mapping, 5S
. Statistical process control. Multivariate testing
. Activity based costing
. CATIA, Solid Works
. ACCESS, MS project management
. Lean manufacturing, 5S and
. Diversity training.
Knowledge of manufacturing concepts such as KAIZEN, JIT, Kanban, visual
control, SAP, Quality tools-SPC. root cause analysis, PDCA, Pareto analysis
Member-American Institute of Industrial Engineers