SUNITHA
Email: abhmwy@r.postjobfree.com
Sr. DCS Engineer
Ph: 732-***-****
SUMMARY
Over Seven years of experience in Distributed Control Systems. Good
exposure to Energy and Utility business industry. Bachelor's degree in
Electronics and Instrumentation. Very good knowledge of real time embedded
systems used in factory automation and distributed control systems. Good
knowledge of SCADA systems. Experienced with software development using
VisualBasic.NET and C++.
TECHNICAL SKILLS:
SKILLS : SCADA Systems, CONTROLS & INSTRUMENTATION, DCS
(PROCONTROL, PC POSE)
MOD BUS, DNP3
Domains : Thermal Power Plants
Software Skills : JAVA, C, C++, SAP ABAP, MATLAB/Simulink, Visual
Basic.NET
Platforms : Intel PCs, AIX Unix, Embedded systems
EDUCATION
Bachelor of Engineering (Electronics and Instrumentation) from Jawaharlal
Nehru Technological University (JNTU) with Distinction.
PROFESSIONAL EXPERIENCE
ABB Inc. Oct 2007 - Dec
20010
DCS Engineer
ABB is a global leader in power and automation technologies that enable
utility and industry customers to improve their performance while lowering
environmental impact. Worked as a DCS Engineer.
Duties/responsibilities:
. Responsible for control systems applications and design for projects
in the oil/gas/power generation industry.
. Involved in project pursuit teams, maximize system design, product
content and ensure customer satisfaction.
. Worked as part of a team in functional design specifications, detailed
engineering documentation and implementation
. Designed & developed applications in the ProControl P13/42 DCS system
using P10 programming Language for power generation companies.
. Support installation, startup and commissioning of electrical power
and electrical control systems.
. Provide sales support such as business development in defining /
influencing customer's automation systems / integration requirement.
. Provide regular reports, briefings and reviews as required using the
agreed processes. Developed test plans for third party factory
acceptance test (FAT) and site acceptance test (SAT).
. Worked with Windows operating systems, communications with a variety
of other industry standard protocols and a basic understanding of
Ethernet networked devices.
. Strong people skills and ability to work with clients in project
execution teams, throughout the project development phase, to
installation and commissioning. Attend project technical design and
clarification meetings
. Designed the control loops like level, flow and temperature control or
modifications to existing control loops, Loop Tuning, Set point
change, Upper, Lower limits for alarm condition changes via diagnostic
station as per user requirements.
. Programming the requirements,loading the code and testing with
pseudo signals.
. Configured the PCPOSE HMI system.
. Determined DCS engineering problems and proposed solutions.
. Provided Technical support to the maintenance department and training
to junior engineers on DCS.
APGENCO/APTRANSCO April
2003 - Aug 2008
DCS/Instrumentation & Controls Engineer
Andhra Pradesh Power Generation Corporation Ltd (APGENCO) is the
electricity generation company of the Government of Andhra Pradesh state in
India. It has an installed capacity of 7048.4 MW which makes it the third
largest power generation company in India.
Andhra Pradesh Power Transmission Corporation Ltd (APTRANSCO), a subsidiary
of APGENCO is the Power Transmission company of the Government of Andhra
Pradesh state in India.
Worked as a DCS/Instrumentation & Controls Engineer in APGENCO.
Nature of duties:
. Maintenance of C & I System in 2 * 120 MW Thermal Power Stations.
Troubleshooting and fixing of malfunctioning instrumentation and
related software.
. Engineering and implementation of C & I System in Thermal power
station during Refurbishment of the project.
. Annual & Break down maintenance of Power station.
. Placing the indents and studying of quotations submitted by supplier
for technical suitability as part of spares maintenance.
. Analyzing the causes of tripping and preparation of tripping report
. Understanding the P & ID drawings, fundamentals of analog electrical
circuits and control theory.
. Designing of embedded software, electrical circuits and testing.
. Testing the various types like mechanical, electronic and electrical
equipment, devices to give suitability after procurement.
Installation, testing and commissioning works carried:
. Steam and water analysis systems
. PROCONTROL *P13/42 of ABB during the up rating of units from 110MW to
120MW
. 24V, 2000AH Battery chargers.
. 200AH ups system.
Details of hands on Experience:
. Calibration of Field equipments like (a) Transmitter (b) Control
Valves etc.
. Commissioning and maintenance of electrical and pneumatic operated
control valves & power cylinders.
. Maintenance of C&I Lab
. Analysis of the causes of trips
. Hands on experience on Flue gas, Steam and Water Analysis system.
. During engineering stage, involved in preparing and finalization of
closed loops, open loops, I/O list, Alarm list, BTG desk, Field
devices, drive list etc.
. Preparation of cable schedules etc.
. Tuning and Maintenance of closed loop controls in Auto mode.
. Experience in planning, executing and leading software engineering
projects using the latest software development best practices.
SYSTEMS Handled
. PROCONTROL P 13/42 of ABB
. PC POSE (MMI system from M/s. BHEL)
Works handled in PROCONTROL DCS SYSTEM:
. Implemented alarm system for annunciation of supply problem in CRA
panel through supply Monitoring module.
. Implemented on-line logic modifications in various control loops.
. When the failure of pneumatic based Secondary Air Damper Control
System has led to 10 nos of 120MW unit trips after refurbishment work,
Worked out a scheme for SADC system in the "PROCONTROL DDC",
implemented the scheme part by part when the unit is in service and
finally taken in to DCS System. These effort-avoided units tripping
which not only saved loss of generation costs but also saved new
equipment procurement costs and also lead time for the same. This
effort saved around several crores.
. Worked out and implemented three element controls for hotwell level
control to handle a different type of control valve.
After refurbishment works of 120MW unit, noticed that the reason
for the problem is the characteristic of the valve and
proposed to use a 3 element Control comprising Howell level,
condensate flow and steam flow. With the Implementation of the above
the loop settled and it could accept a wide band of gain and time
constants as it is having a feed forward element.
Project: Power Plant Simulator Software for APGENCO
Environment: C, C++, Visual Basic.NET
Developed Power Plant Simulator Software for APGENCO using Visual Basic.NET
and C++. Demonstration of the Simulator was given at Multiple Power
Stations of APGENCO to more than 150 engineers and received wide
appreciation. After successful feedback from all engineers, APGENCO stopped
the processes of purchasing a Simulator from external agency which costs
several crores ($400,000) which was intended for the training of newly
recruited engineers. The Simulator was mainly built to train the new
engineers in Power Plant Operations & Maintenance.
Features:
. Plant can be simulated to run right from charging of station bus
including flashing, rolling and synchronizing operations.
. It runs on a Server and several Client systems and in second phase, it
was implemented on multiple client systems.
. In the first phase, File system was used to establish communication
between server and clients and in second phase Winsock is made use of.
. Many ActiveX controls were developed as a part of Simulator
development.
. Mathematical models of various Boiler parts (Thermodynamics), Feed
Water Heaters, Condenser, Turbine governing system. Cooling Towers
(Simple models) were developed.
. XY trends in real time were developed without using any readily
available tool.
. The facility to store any particular plant condition with user defined
names and to reload them was provided.
. Auto control loop tuning parameters were made available to the
operator to demonstrate the effect of gain and time constant.
. Effect of humidity and ambient temperature on the operation of the
power plant can be demonstrated. The above are only a few of the
available features.
Achievements:
. Selected as a member by APGENCO Directors for the project of POWER
PLANT SIMULATOR for 210 MW, being developed in Visual Basic.
. Demonstration of the simulator was given at multiple power stations of
APGENCO to more than 150 engineers and received wide appreciation.
Training
. 6 Month Induction training program on Power plant operation and
maintenance at VTPS/TI, Vijayawada Thermal Power Station India.
. Trained on SCADA system at VTPS/TI, Vijayawada Thermal Power Station
India.
. Trained on optimization of power plant operations at Hyderabad, India.