James T. Sanders
PO Box ***
Dayton,TN *****
Cell 352-***-****
*************@*****.***
SUMMARY OF EXPERIENCE
Twenty plus years in Machine Controls (PLC's & MMI's), Instrumentation,
Electronics, Electrical, Nuclear power plants, Nuclear facilities and
Computer experience involving Automotive, Commercial and DOE facilities
Start-up Operations and Maintenance. Specific responsibilities encompass:
PLC Design, Ladder Logic Programming, Instrument Design, Fabrication,
Startup and Walkdown, Procedure Development/Reviews, Supervision and
Management.
A sample of equipment encountered follows: Allen Bradley PLC-2, PLC-3, PLC-
5, SLC 5/03, SLC 5/04, SLC 5/05 and ControlLogix 5000, Man Machine
interfaces, Rockwell RSView32, RSView Studio, Panelview 550, 600, 1000,
1400 and Wonderware. GE Fanuc 90-70 Hardware.
Software packages used in conjunction with the control equipment and
Computers consist of RSLogix 5000, RSLogix 500, RSLogix 5, A.I Series,
Allen Bradley 6200. Other software includes Excel, Access, AutoCAD 14
through 2009, Cimplicity Machine and Plant edition, as well as many others.
Key words: Allen Bradley PLC 5000, SLC 500, RSView, DeviceNet, ControlNet,
HMI, AutoCad, DCS, Cimplicity and FactoryTalk
EMPLOYMENT HISTORY:
Jan 09 Alstom New Haven, WV
Present Under Contract at Mountaineer Power Plant in New Haven, WV
Controls Engineer / PLC Programmer: At AEP Mountaineer Power plant. I
worked mainly in CO2 Capture and Storage project. I coordinated ladder
logic programming and startup of equipment. Some of the hardware I used
were RSLogix 5000 PLC's With controlnet, Wonderware HMI, Ethernet and other
devices. Software include RSLogix 5000 and Wonderware Intouch.
Sept 08 American Electric Power Dresden, OH
Dec 08 Under Contract
Controls Engineer / PLC Programmer: Worked at AEP Power plant. I worked
mainly in water pretreatment area. I coordinated ladder logic programming
and startup of machines. Some of the hardware I used are GE Fanuc 90-70
PLC's, HMI, remote I/O, genius I/O, Ethernet and other devices. Software
include Cimplicity machine Edition for the PLC and Cimplicity Plant edition
for the HMI.
Sept 06 Jacobs Engineering Appleton, WI
July 08 Under Contract
Controls Engineer / PLC Programmer: Worked at various plants through the
USA.
Some of the plants are coal power plant at a paper mill, paper converting
ant diaper machines. I coordinated ladder logic programming and startup of
machines. Some of the hardware I used are Allen Bradley PLC's (ControlLogix
and PLC 5), HMI, remote I/O, DeviceNet, ControlNet and other devices.
Software includes RSLogix 5000, RSView32 and RSView Studio.
Page 2
James Sanders
July 05 Tennessee Rand Corp Chattanooga, TN
Sept 06 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and
startup of Weld machines. Allen Bradley ControlLogix, Ethernet to plc, HMI,
remote I/O and other devices. Used RSLogix 5000 software for ladder logic.
RSView32,RSView Studio software and Allen Bradley 550 and 1400 operator
interface are used in the performance of the control functions.
Feb 05 Berstroff Industries Florence, KY
July 05 Under Contract
Controls Engineer/ PLC Programmer: Coordinated and program ladder logic
and startup of single screw and twin screw extruding machines. The
processors used were Rockwell PLC ControlLogix and SLC 5/05. The software
was RSLogix 5000 and RSLogix 500. We use Ethernet, data highway, PID loops
temperature and pressure, several other analog points. Variable speed
drivers, 5 to 1000 hp AC & DC motors with PowerFlex 700 and PowerFlex 700S.
RSview32 software and Allen Bradley 550 and 1400 operator interface are
used in the performance of the control functions.
Dec 01 AEDC Air Force Base Tullahoma, TN
Sept 03 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming, MMI
programming and startup of a Wind tunnel process involving eight 27,500 hp
motors, four 44,000 hp motors and all the interconnecting points. Some PID
loops, several other discrete and analog points. Most PLC programming I
used GE 90/30 PLC. Simplicity MMI software was used.
July 98 Wright Industries Nashville, TN
Dec 01 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and
startup of a coating process production line. Allen Bradley PLC 5/40, data
highway, PID loops, several other analog points, and variable speed drivers
were utilized in controlling stations and dial stations. RSLogix 5 ladder
logic, WonderWare software and Allen Bradley 550 and 1400 operator
interface are used in the performance of the control functions.
Nov 97 Allied Signal Maryville, TN
July 98 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and
modification of production machines. Allen Bradley PLC 5, data highway, SLC
5/03 and SLC 5/04. A.I. series 8.01, Rockwell RSLogix 5, RSLogix 500 ladder
logic software, and Allen Bradley 600 and 1400 operator interface are used
in the performance of the control functions.
Jun 96 Wright Industries Nashville, TN
Nov 97 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and
startup of a battery production line. Allen Bradley PLC 5/40, data highway,
Control Net, Device Net, and variable speed drivers were utilized in
controlling stations and dial stations. ICOM version 8.01 ladder logic
software and Allen Bradley 550 and WonderWare for operator interface are
used in the performance of the control functions.