Post Job Free
Sign in

Power Plant Mechanical

Location:
Prescott, AR, 71857
Posted:
May 13, 2011

Contact this candidate

Resume:

Justin E. Johnson *** Buddy Street • Lufkin Texas, 75904

936-***-**** cell 936-***-****

********@***.***

OBJECTIVE A position as Millwright where knowledge of machinery, a high mechanical aptitude, and

commitment to safety can effectively contribute to the successful and profitable operation of any

organization.

EXPERIENCE

November 2009 Fluor Port Arthur, Texas

to Present Precision Millwright

Used precision instruments to align and level Flowserve and Sulzer pump bases to specified

dimension,elevation and reference points.Connected,checked,and corrected pipe stress and

motor alignment with dial indicators then finalized with rotolign laser

June 2009 Fluor St Francisville, Louisiana

to November 2009 Millwright

Dismantled pumps and performed repairs, such as cleaning impellers, stuffing boxes, tightening

glands, replacing bearing and laser alignment as part of getting two paper machines on line after

three years of being non-operational.

September 2007 Shaw Boyce,Louisiana

to April 2009 Ironworker leadman

Supervised and managed the installation of platforms,ladders, and stairsfor alterations in a power

plant. Laid out reference points and dimensions on beams,plates,and columns for fabricating,

welding,assembling and detailing the structure for Cleco

March 2007 Amec Kamtech Carrolton,Georgia

to September 2007 Millwright Foreman

Assembled bottom housing and leveled soul plates for proper installation of bearings,rotor,cones

and dampers on ID fans for a major expansion.Installed equipment, such as duct work, conveyors

and motors for an upgrade at a operational power plant.Suggested changes in working conditions

and use of equipment to increase efficiency of department and work crew..

September 2006 GA West Loudon, Tennessee

to February 2007 Millwright, Ironworker

Constructed foundation and fabricated supports for machines and modified existing equipment, for

the installation of cyclone, conveyors, and platforms. Inspected, removed and replaced worn or

broken parts on existing equipment for safe and proper operation.Disassembled and overhauled,

pumps, pump power units, generators,and bearings, using hand tools and a crane.

August 2006 SW&B (Shutdown) Courtland,Alabama

to September 2006 Millwright

Dismantled machines, conveyors, and chains for installation of new and used equipment.Optically

aligned equipment using K&N levels,squares, and other precision tools to verified dimensions

and tolerance of machine parts. Inspected and repaired mechanical equipment and machinery

such as pumps, compressors, and other rotating equipment for proper pm

February 2006 Amec-Kamtech Calhoun,Tennessee

to July 2006 Millwright Foreman

Supervised and coordinated activities of workers engaged in dismantling, moving, assembling

and installing the dryer section of a Voith paper machine.Verified dimensions of machine parts,

using gauges, calipers and micrometers. Inspected the machinery, equipment and working

conditions for proper safety procedures and help to determine safety measures in preventing any

accident.

November 2005 Amec-Kamtech Oakdale,Louisiana

to February 2006 Millwright

Optically set truions for level,square and correct elevation as well as proper installation of dry cans

that included gaskets,bolting up and torque to manufactor specifications .Selected rigging to lift

and place cans in appropriate location for fast,safe, and proper erection.

May 2005 Amec-Kamtech Cancelment,Florida

to October 2005 Millwright

Constructed two water clarify`s and necessary component`s to purify and clarify industrial water

used during production.Assembled rigging to vertical install and align equipment according to

plans.

April 2004 Amec-Kamtech Lock Haven Pennsylvania

to April 2005 Millwright

Installed a Andritz paper machine from soul plates to a completed, operational. machine.

Assembled and installed a converting line from start to the finished product.

December 2003 Amec-Kamtech Windsor Locks,Connecticut

to April 2004 Millwright

Erected a Sandusky water purified paper machine.Assembled and installed all necessary parts

and componets such as high pressured showers,pumps,and motors.

June 2003 SWC corp.of Coca-Cola Nacogdoches,Texas

to December 2003 Millwright -Line mechanic

Repaired and maintained three running lines including fillers,palletizers,and labeling

machines.Diagnosed all electrical and hydraulic malfunctions.

May 2003 Rust Construction (shutdown) Tusculosa,Alabama

to June 2003 Millwright

Flushed vessels and tanks and arranged blinds in a gas line refinery for proper shut down

inspections and testing.Assisted Hunt refinery operators in planning and execution of replacing

pumps and motors.

October 2002 Duke Fluor Daniels Belews Creek,North Carolina

to May 2003 Millwright\Boilermaker

Assisted in the building of the worlds largest SCR project including removal and conversions of

old machinery Established original benchmark and optically verified elevations of all new

installations.

March 2002 Spirit Port Hudson,Louisiana

to September 2002 Millwright

Constructed a Metso tad paper machine with all mechanical componets needed to produce

quality tissue paper.

January 2002 Spirit (shutdown) Brunswick,Georgia

to February 2002 Millwright

Demo all parts of a Valmet forming section including soleplate,rolls,and structure.Installed and

upgraded machinery parts to help production and quality of Printer paper.

February 2001 Kamtech Mehoopany,Pennsylvania

to December 2001 Millwright

Constructed ground up foundation for two CPD twin dryer tissue machines with all optical and

mechanical work needed to assure fast and trouble free startup.

November 1998 Robinson Aviation Crossett, Arkansas

to January 2001 A&P mechanic apprentice,Ground support

Supported A&P mechanics in inspections and in the execution of electrical and mechanical

repairs as required by the FAA.. Purchased,maintained and distributed aviation fuels as well as all

accounts payable to meet Phillips 66`s guidelines.

EDUCATION General diploma Crossett, Arkansas

1993

ACCOMPLISHMENTS

Pilot

Achieved and obtained the license of a pilot with ratings of multi-engine,instrumentation,and ATP

with over 2400 hours of logged flight time.Im also a certified ironworker with Shaw construction

and a certified boilermaker with fluor after passing their written and hands on test.



Contact this candidate