Paul Burke
Residence: *** Holbrook Ave, Lake Ronkonkoma, N.Y
Home #: 631-***-**** Cell #:631-***-****
*-****-*************@*********.***
Summary of Qualifications
• Strong maintenance background in troubleshooting Control circuits.
• Ability to read blue prints and electrical schematics.
• Well-developed communication skills, both oral and written.
• Proficient in using power tools and mechanical assembly.
• I have an extensive supervisory background which consist of delegating authority. I communicate
and work well with others.
• I have a multi faceted maintenance background in both commercial and residential, including
plumbing, carpentry, painting, and all areas of electrical installations.
• I have also done purchasing and have saved companies a substantial amount of money on
electrical supplies.
• I am knowledgeable of both commercial and residential electrical codes.
Education
• Centereach High school Graduated 1980
• I attended the Boces basic electronics course while in high school.
• I was the apprentice to head custodian at Dawnwood Jr. high school from 1978 to 1980
Professional Experience
-Luiptold Pharmaceutical -Shirley, N.Y
-9-27-2010 to 4-19-2011
• I was required to perform a sterile set-up for the liquid filling machines.
• Room 4 Cozzoli liquid filling machine can run vial size's 10 ML, 20 ML, 30 ML, 50 ML, 100 ML
• Room 1 Cozzoli liquid filling machine can run vial size's 3 ML, 5 ML, 10 ML.
• The machinery I worked on typically would develop either electrical or mechanical issues, which
I generally was able to resolve quickly so that production would not be compromised.
Reasons for Dismissal: The company had problems with the FDA, pending resolution. They shut down
production and laid off the second shift, then myself, and others.
-Time Cap Labs INC. Pharmaceutical company - Farmingdale, N.Y
-2-16-2009 to 9-26-2010
• Head maintenance technician. I oversaw the building.
• In the first week of my employment, the ID water system on the second floor flooded down to the
first floor. I resolved the problem by working with the existing water detection alarm system. I
ordered a 120 vac electrical ball valve inline with main water shut off. I created D/C circuit to
control A/C circuit installed into enclosure box. I used inch EMT pipe, to connect to the main
pump.
• I completely remodeled the entire packaging lines by making them self sufficient. I added
electrical eyes that controlled relays and contactors, which shut off sections automatically.
• All the production tablet press machines had major electrical issues, which I revamped to ensure
proper safety and operation of the equipment.
• Preventative maintenance on Hvac units changing air filters adjusting belts, also troubleshooting
control circuits.
• I installed an entirely new and separate service for the Shipping and Receiving department.
• My job was also to turn on the gas steam generator every day.
• As an electrician, I am knowledgeable on how to bend conduit pipe EMT 1/2 inch up to 3/4 and
rigid.
Reasons for Leaving: I had a more lucrative job opportunity presented to me.
-Fab-Con Machinery- Port Washington, N.Y
-12-04-2006 to 1-29-2008
• Mechanical assembly of textile machines completed in two weeks.
• All components mounted parts done by drilling and tapping holes into back panels.
• Wiring on ALLEN-Bradley PLC, slc 500 and drives and Baldor motors.
• Testing completed in one day by troubleshooting electronic circuits and programming.
• I also did all of building electrical maintenance.
Reasons for Dismissal: There was no work available, so I got laid off.
-Dejana Industries INC.- Port Washington, N.Y
-2-02-2004 to 12-01-2006
• Repaired all electrical maintenance problems on service trucks and vehicles.
• Researched and ordered replacement parts from parts catalogs.
• Built control panels with PLC's and installed them onto new and old snow melting machines.
• Testing, by troubleshooting electronic circuits of PLC and component parts.
• I assisted in purchasing electrical supplies.
Reasons for Leaving: Better pay and benefits.
-CVD Corp-Ronkonkoma,N.Y
-6-09-2002 to 7-21-2003
• Assembly of reflow ovens for PC boards.
• Worked with engineering to add new electronic circuits refurbishing the old designs.
• Testing of machines by troubleshooting electronic computer system.
Reasons for Dismissal: Contract ended.
-Spellman High Voltage Electronics-Hauppauge, N.Y
-2-26-2001 to 5-10-2002
• Manufacturer of power supplies for anything.
• Electrical maintenance for the test department.
• Built test racks for power supplies by following schematics print.
Reasons for Dismissal: There was no work available, so I was laid off.
-Link Control Systems-Ronkonkoma, N.Y
-5-10-1992 to 2-20-2001
• Manufactured industrial control panels and systems.
• Learned to read mechanical blue prints and schematics.
• Mounted all electronic components by drilling and tapping into back panels.
• Wired many types of PLC's, drives and electrical starters.
• Supervised production line for five years.
• Built 30 Bridge control systems throughout the United States.
• Also learned how to do purchasing.
Reasons for Leaving: I left for a better job opportunity and advancement to my career.
-Digital Communication Corp-Ronkonkoma, N.Y
-9-15-1988 to 4-27-1992
• Manufactured communication systems by networking phone and computer technology.
• Built network systems by installing all parts and components into rack units.
• Wired equipment by wire wrapping and harnessing the RS232 cables.
• Supervised production of communication systems.
Reasons for Dismissal: The company went out of business.
-Grumman Aero Space Corp.- Calverton, N.Y
-10-05-1980 to 6-10-1988
• Manufactured Navy aircrafts.
• Assembly of harness.
• Learned troubleshooting of aircraft electronic system and repaired electronic parts.
Reason for Dismissal: Government contract was up.