Francisco Javier Salinas Gonz lez
Adress: Cerro el Nabo # 136, Privada de Juriquilla, Quer taro, M xico.
Place and date of birth: May 27~ 1971. Ciudad Jim nez, Chihuahua, M xico.
E-mail: ***********@*****.***.**
Skype: francisco.salinas49
Phone number: (014**-***-**** in Queretaro, City.
Mobil telephone: (045***-*******.
SUMMARY
Plant Manager with 18 years of experience in Mexico. World class
manufacturing environments dealing people from diverse cultures and
nationalities. Highly motivated professional with strong background in
Automotive Manufacturing Systems, business plans, plastics, reaction plans,
KPI S, production, Lean manufacturing, Quality, Costs, continuous
improvement, finances, projects, supply chain, cash flow, sales,
engineering, labor relations, worker union, and investment recovery.
EDUCATION
Industrial Production Engineer in degree (Morelia Technologic Institute);
1989-1993
Materials Sciences Mastery in degree "plastic, ink, welding, chemicals,
steel, resins " (Morelia Technologic Institute);1996-1999.
PROFESSIONAL EXPERIENCE
Silca from Mexico
01/1999 - Currently Working
International Manufacturer Plastic (injection machines, injection through
nitrogen, molds, set-up, paint, blowing machines, estrusion machines,
machining and assembly lines) with $220 million in annual sales. Key
customers include FORD, VW, GM, NISSAN, CHRYSLER, BMW, Lear Corporation,
TRW, Takata, Bosh, Benteler, etc.
Plant Manager
. Responsible of Production, maintenance, engineering, traffic, molds,
costs, projects, continuous improvement, lean manufacturing, P/L, KPI S,
Kaizen team, plan business, supply chain, finances, sales, safety, raw
material, profitability increase, human resources and economic
administration.
. Management of people 500 workers.
. Cost Reductions in plant 35% (peoples, raw materials, inventories, wips,
reengineering, over times, etc.).
. Application of finances Statement and fiscal auditing.
. Effective cultural change manager who strives to increase productivity
(98%), quality (99-100%), efficiency (94%-96%), internal cost (0.5%),
PPM`S(1 per year), cycle inventories (99.8- 100%), new projects(100%),
cost reduction ( 8% over sales), pass done(0%),, shipments(100%),
delivers in Just in time (98-100%), scrap(0.4-0.6%), reworking (0.3-
0.5%), WIP( 8%), stop no programming (0.7%), profitability of business(
6%), kaizen teams( 6 per month), complaints (1 per year), customer
service(100%), OEE (82%), problem solution(100%), increasing of sales
(4%), TPM maintenance(98%) and safety inventory- MPS(100%).
. Implementation of SIX-SIGMA (zero defects), Just in Time System (TOYOTA),
Cost Engineering, and Business Plan.
. Certification of the plant in QS-9000, TS16949, ISO-9000, Q1, VDA 6.3 and
ISO-14000.
. Development of Quality Function Deployment (QFD), and Total Quality
Management (TQM).
. Implementation and development of a software system to control and to
administrate the plant (SAP).
. Development of Supply Chain: EDI, MAPIC S, PITEX, MAX-MIN, FIFO S,
warehouse, cyclical inventories, ABC, logistic, traffic, transportation,
customs, packing list, custom agent, etc.
. Increase of continuous improvement and use solution problem systems (8 D,
5 P, 5 why, PDCA).
. In charge of finance plant balance and internal auditing with positive
balance.
. Use of Lean Manufacturing, SCP, TPM, Kaizen Team, cross functional team,
and certificate in Black- Belt.
Manufacturing: Plastic components as guards, plastic bases, bevels,
handles, guides, elbow guards, bottles, micas of board, plastic for doors
and control panel, part for fenders and fascias, air ducts for ventilations
system and motors. These made through injection machines (Kraus Mafei,
Battenfiel, Cincinnati, Engel and Van Boy equipment until 3100 tons of
press, heat and cool injection) and assemble lines. Adjusting of equipments
(press, ejector, cylinder, times, injection, pressures, mold, speeds,
screw, cool-time, charge size, mill, mixed, robots, etc.). Control of raw
material as polypropylene, polycarbonates, Nylon, polyester, ABS,
polyethylene, ground material, colorings, lubrications as thermoplastic
material as thermoset material. Management of external equipments as
Shillers, compressors, vacuum, dry equipment, mixers, mill to grind
plastic, temperature control heat-change, robots, etc. Likewise controlling
blowing machines, and estrusion machines and ink.
SIBASA
05/1993 - 01/1999
International Company Plastic (injection machines, blowing machines and
assembly lines) with $50 million in annual sales with worldwide operations.
Key Customers include VW, NISSAN, GM, FORD, TRW, Faurecia, Bocar, DK, etc.
Production Manager
Responsible of Production, maintenance, continuous improvement, Lean
Manufacturing, safety, and cost reduction.
Management of people 200 workers indirect.
. Reduced the operation costs until 10 % and getting economic operation
budget.
. The plant got the goals to increase the productivity (95-98%), quality
(97-100%), efficiency (93-98%), delivers Just in Time (95-100%),
maintenance TPM(90%), PPM S and complaint (6), OEE (76 %),
WIP(30%),costumer service(100%) and safety inventory- MPS(100%).
. Implementation of Just in Time, Total Productivity Maintenance (MPT),
Plant Engineering, Cost Systems and PDCA.
. Working under Process Control, Teamwork, 5 S, Losses Total Control (CTL)
and Goals.
. Certification of the plant in QS-9000, ISO-9000 and VDA 6.1.
. Start up the new projects and their standardization.
. Development Manufacturing Engineering, Industrial Engineering, and
Production Material Requirement (PMR).
. Implementation of Kaizen System, Theory of Restriction, Poka Yokas,
Quality System and Productivity System.
Manufacturing: plastic components as air ducts, spoiler parts, plastic
boots for hydraulic system and transmition system, plastic cover to
different systems, guides, bottles for cleaning windowcar, plastic systems
of ventilation, etc. All these going through an automatic and manual
process of assembly lines. Using also blowing machines (crush in cold,
control of sleeves, excessive scrap, slow speed, mold repairs, aluminum
mold) and injection machines( Cincinnati, Engel, Toshiba, 1500 tons of
press, cool and heat injection). Besides managing cooler shiller system,
and nitrogen accumulator. Also the control of raw material as thermoplastic
material as thermoset material. Control of silos, grind department, etc.
KEY SKILLS
7 years as Plant Manager
Strategic thinking
Problem solving and analysis ability
Effective negotiation
Leader auditing TS-16949, VDA, Q1, ISO-9000, QS-9000
Black-belt in Sig-sigma
Supply Chain process (traffic, logistic, customs, packing list, etc.)
Total Quality Management
Quality functional Deployment
Lean Manufacturing
Continuous improvement
Total Productive Maintenance
Just in Time system (Toyota)
Functional planning
APQP, PPAP, PDCA, 5 S, 8 D, AMEF S, PSW
New Project and reaction plans
SCP (Statically Control Process)
Business plan
Reduction of costs, use of MS office applications
Cyclical inventories and ABC
Auto-control (Manufacturing and Industrial Engineering)
Quality plan and control plans
EDI, PITEX, FIFOS, MAX-MIN, MAPIC S, MRP, SAP.
Poka-yokes systems.
Focus on results; focus on quality
Process Control, control plans
Profitability Increase
Total Lost Control (Safety)
Discipline, team in work, motivated.
Generator of Cash flow
Dynamic, working under pressure, push
Decision taker under metrics
Economic Investment recovery
Master Plans and bill materials
Feasibility of New project
Negotiation with worker union
Responsibility with governmental regulation and laws
Making more with less
Mechanics, progresses, transfers dies.
Plastic Certificate
Tool room control and design for molds
CNC machinery
Robotic processes for injection and CNC processes
Effective communication
CERTIFICATES
Black Belt in SIX-SIGMA, Quality Function Deployment (QFD), Quality Leader
Auditing in QS-9000, ISO-9000 TS16949, Q1, VDA 6.3 and ISO-14001, Total
Preventive Maintenance (TPM), Total Quality Management (TQM), SAP, PL, cash
flow, accounting systems, plastic and blowing process, Lean Manufacturing,
Auto-Cad, Kad-kid, Production Material Requirement ( MRP), Supply Chain,
Fiscal Auditing, Evaluation Plant System and Costumer Service Technicians.
Just in Time System, Statistical Process Control (PSC), Plant Indicators
(indicators of quality, productivity, efficiency, cost, sales,etc.), Poka-
Yokas Systems, Total Loses Control (TLC), Process Control, EDI, KPI S, MAX-
MIN, PITEX, MAPIC S. Supply Quality Assurance (SQA), Production Part
Approval Process "PPAP" (FMEA S, studies of R and R, dimensional result,
Control Plan, preliminary process capability study, etc.), Advance Product
Quality Process "APQP", Supply Quality Assurance (SQA), New Project
(factibility, cost, machinery, etc.), Reaction Plans, Business Plan,
logistic and Complaint Solution (8 D ).