Anthony Mastriano Senior Project Supt. Project ExperiencE
Anthony P.
Mastriano Sr.
Strongsville, ohio,
44136
home 440-***-****
cell 216-***-****
SUMMARY:Thirty plus years of increasing responsibilities as a Project
Superintendent that started as a union Cement Finisher in self perform
concrete, tilt-panels and steel erection. My experience encompasses
building high-rise class "A" office towers, luxury high-rise resort hotels,
casinos, schools, hospitals, jails, courthouses and retail centers. I have
the management experience, technical expertise and analytical judgment,
necessary to complete all projects on time and within budget. I can
demonstrate superior leadership and communication skills in planning,
scheduling, and quality control at a consistently high level of performance
in a variety of projects. I can hit the ground running to make a positive,
immediate contribution toward enhancing the quality, effectiveness and
profitability of your operations. Also multiple renovation and retro fit
projects in N.Y.C. including all types of Asbestos removals, demolition
from partial interior to complete building demolition, multiple foundation
projects where I encountered and mitigated deleterious soils, dewatering
while performing foundations and also rock demo, drilling and doweling for
foundations, all types of caissons, pilings and drill piers, also storm
water and ground water storage, rerouting and mitigation and sedimentation
control, I am certified in Florida in storm water and ground water
management and control.
. Employment History
. Worked on multiple hospital projects including; N.Y.U. Medical Center,
Flower 5TH Avenue, Columbia - Presbyterian Medical Center, Lutheran
Medical Center, Bellevue Hospital Medical Center and Downstate Medical
Center
. Experience in multiple high rise apartment, condominium and office
buildings in NYC; from 25 to 70 floors including the original world
trade center utilizing the structural, poured / reinforced and post
tensioned concrete design
. Concrete pour, Place and Finish Superintendent on the original World
Trade Center
. Supervised Long Island Railroad grade elimination project thru 3 towns
in Long Island ( Amityville, Lindenhurst and West Babylon) total 10
miles of new raised railroad bed to allow continuous vehicle cross
traffic below
. Supervised construction of new Staten Island Expressway from Victory
Blvd. To Outer Bridge Crossing
TITLE: Sr. Project Superintendent
.
. CM&D construction, 3 office towers ( Oceania Business Plaza) punta
pacifica, republic of panama, total 1 million sq ft. with a total
volume of 130 million dollars.
. Senior Project Supt. Responsible for entire site and building
general construction physical activities,, conducted all sub
meetings, all RFI's, and coord., scheduling and Q.C. on project,
Responsible for all scheduling coordination, maintaining schedule,
coordination of all trades and quality control
. Specific emphasis on coordinated drawings, coordinating layout and
engineering of all trades and coordination and overlay and all railing
drawings and block outs with relationship to post tension cable,
maintain strict dimensional control of all centerlines of all columns,
walls, stairways and elevator shafts, maintain consistent outside edge
of slab measurements
TITlE: Sr. Project Superintendent
VALLI CONSTRUCTION CO. CAR DEALERSHIPS IN HOUSTON, TEXAS
. GENERAL SUPT. ON CONC. TILT -UP CONST. 80,000 sq. ft. car dealership
for auto nation in addition to 10 acres of site work
. Responsible for all scheduling coordination, maintaining schedule,
coordination of all trades and quality control
. Specific emphasis on coordinated drawings, coordinating layout and
engineering of all trades and coordination of all sub trades,
maintain strict dimensional control of all centerlines of all columns,
walls, stairways, maintain consistent outside edge of slab
measurements
. conducted all weekly progress meetings, interface with owner,
architect team and all subs,
. on this project I was both project manager and general supt.,
project director was only on site 2 days every month
YATES CONSTRUCTION, Destin, FL (hired out of the Montgomery, AL office)
TITLE: Senior Project Superintendent
- Yates Construction - Hard Rock Casino, Tampa, FL
. Senior Project Superintendent on the Tampa Hard Rock casino expansion
. 1288 space parking garage; total volume $100 Million
. Responsible for all scheduling coordination, maintaining schedule,
coordination of all trades and quality control
. Specific emphasis on coordinated drawings, coordinating layout and
engineering of all trades and coordination and overlay and all railing
drawings and block outs with relationship to post tension cable,
maintain strict dimensional control of all centerlines of all columns,
walls, stairways and elevator shafts, maintain consistent outside edge
of slab measurements
. Renovation of several areas of existing casino together with new
casino addition including 100, 000 sq. ft. of new casino gaming, 3
new restaurants and admin. Offices while maintaining ongoing casino
activities.
. Also prevent and mitigate all moisture penetration into existing
casino areas
-- Yates Construction - Grand Dunes II Destin, FL
Total volume was 80 Million
Title: Sr. Project Supt.
. 23 floors residential over 3 floors parking, 4 units per floor, total
floor area 18,000 + square feet per floor
. Responsible for all scheduling coordination, maintaining schedule,
coordination of all trades and quality control
. Specific emphasis on coordinated drawings, coordinating layout and
engineering of all trades and coordination and overlay and all railing
drawings and block outs with relationship to post tension cable,
maintain strict dimensional control of all centerlines of all columns,
walls, stairways and elevator shafts, maintain consistent outside edge
of slab measurements
. This project was brought to completion under my direction and
leadership 75 days ahead of schedule and netted several million
dollars of incentive bonus for Yates from the owner/developer
- Panzica Construction Company, Beta Business Mall, Mayfield Village, Ohio
Cleveland
Title: General Project Superintendent
37 Million Dollar Project, Funded by O.S.F.C. (Ohio School Facilities
Commission) Clearview Local School District, Lorain County, Ohio
. From site logistics to completion of project
. Three Buildings; High School, Middle School, Elementary School, Three
Separate Locations, Three Miles Apart
Primary Project Activities:
. Demolition of existing structures while maintaining ongoing school
activities
. Interior demolition of existing finishes, windows, and all electrical,
plumbing and all HVAC systems in portions of buildings to remain
. Renovation of existing buildings to remain and installation of new
casework, windows and complete finishes of existing buildings
including new plumbing, electrical and HVAC systems
. New additions including; Gymnasium, Auditoriums, Classroom Additions
and site work at all three buildings
. Complete renovation of kitchens, including new equipment at three
buildings
. Oversaw this entire project as the sole Project Superintendent on
these three buildings at three separate locations with ongoing
multiple activities at five different locations within the three
buildings.
. Work also included six complete new wings at the three schools
throughout project while maintaining school normal operations.
Independent Quality Control Consulting Work, Cleveland Clinic /
Intercontinental Hotel Cleveland, Ohio and isaster damage assessment at
Case western University
. Private quality control consulting work on building envelope
restoration, including overseeing the entire waterproofing and
moisture protection activity at the
. Cleveland Clinic / Intercontinental Hotel and Conference Center Also
attended Lakeland Community College part time during this project
. Damage assessment to interior and exterior of all buildings at the
case western university campus ( 90 to 100 individual buildings)
assess damage caused by fire, flood, water and deterioration, report
all findings to main office on spred sheet reports via e-mail.
. $200,000 total paid to me
J.F.L. Construction
311 13th Street, Hoboken, New Jersey 07030
- J.F.L. Construction
311 13th Street, Hoboken, New Jersey 07030
Title: Project Superintendent
. Assisted Living Care Facility in Tuckahoe, N.Y.
. 25 million project
. Complete core, shell, and interior from site clearing through
completion and turnover
- J.F.L. Construction
311 13th Street, Hoboken, New Jersey 07030
Title: Project Superintendent / Assistant to the owner
. 3 School additions
. $20 million in total volume
. Complete core, shell, and interior from start through completion
J.F.L. Construction
311 13th Street, Hoboken, New Jersey 07030
Title: Project Superintendent / Assistant to the owner -
. Intermediate School
. $22 million project
. From site clearing to completion and turnover
Owner/Partner Demolition/Excavation and Concrete business
. Demolition of exiting structures
. Excavating and all pouring, placing, and finishing of all types of
concrete foundations, slabs, poured arches, walls, beams and columns.
. Types of jobs included: fifty buildings. Three floors each low
income housing, fire houses, high schools demo of 275 by 1700 foot
aluminum and steel pier shed, construction of new administration
building, construct 6 floating slab weigh stations, install four 7500
gallon fuel tanks buried and encased in concrete all done for the Port
Authority of New York and New Jersey.
- O'Randco Construction Co. & Contractors Construction Co.
Title: Field Superintendent
. Coordinated all construction activities
. Assisted project manager with sub-contractor job scopes
. Interpretation of contract documents including: general and
supplementary conditions, addenda, change orders, plans and
specifications
. Responsible for R.F.I. and submittal logs
. Maintain all safety standards as outlined by O.S.H.A.
. Responsible for physical construction of projects, trade coordination
and supervision
. Field implementation of changes in drawings and specifications,
project safety and municipal inspections
. Completion of punch list
. Coordination of survey teams and trade contractors
. Implementation of site logistics and plans
. Development of job safety programs
. Types of projects included: steel and concrete high-rise office
buildings, apartments, condominiums, hotels, assisted care living
facilities, hospitals, schools, public agencies (Port Authority of New
York and New Jersey, Bridge and Tunnel Authority, Marine and Aviation,
Ports and Terminals, New York State Board of Education, New York City
Police, Fire, Sanitation, Hospital, and Transportation Departments
. Superintendant on the Staten Island Expwy. New construction super
highway from Victory Blvd to Outerbridge Crossing into New Jersey
. Responsible for coordinating all activities including but not limited
to directing the overall Layout and Engineering, schedule and procure
all heavy equipment and trucking, coordinate and supervise all
manpower and concrete pouring of roads, supervise the excavation and
prep. Of sub base road beds, coordinate and supervise the installation
of all underground utilities and also maintain all quality control,
schedule all inspections and testing .
- D.I.C. Concrete Corporation, W.J. Barney Construction Company
Title: Field Superintendent
. Responsible for pouring, placing, and finishing all types of concrete
footings, walls, columns, foundations, slab, and floor beams along
with all other concrete structures
. Vast knowledge of all types of masterplate, Anvil Top, overlay
concrete toppings, Emery Top, as well two and three component epoxy
(vertical and horizontal applications)
. During this period I coordinated for general contractors and all other
sub-contractors any related work while maintaining responsibility for
quality workmanship of any and all concrete applications
ALL REFERENCES AVAILABLE UPON REQUEST