• 32+ years in commercial construction--hands-on to supervision
• Strong self-starter and respected team leader
• Exceptional planning and multi-tasking skills
• Strong project administrative experience
• Advanced computer literacy especially with AutoCAD
Recent Career Highlights
Superintendent for concrete contractor on Library Road Phase III, Washington State
University. Planned, scheduled and supervised construction of cast-in-place architectural
walls, stairs and paving for new pedestrian mall at center of the campus.
Field engineer for concrete contractor on the Northern Quest Casino Hotel, and
Riverstone multi-use development in Coeur d’Alene, Idaho. Prepared shop drawings
using AutoCAD, provided formwork design and technical field support on multi-story post-
tensioned concrete structures. Handled material procurement. Maintained RFI logs and
tracked change orders.
Assistant Superintendent for concrete construction of Business and Social Sciences
complex at Spokane Falls Community College. Planned, scheduled and supervised all
aspects of structural concrete work for 70,000 square foot multi-story building.
Project Manager/Estimator for Cobra Roofing Services. Responsible for finding,
estimating, negotiating and scheduling commercial and industrial roofing projects (with
emphasis on architectural sheet metal roofing and siding).
Education
BA, Business Administration, Washington State University, 1985. Concentrated in
accounting and management information systems.
References
Available on request.
Detailed work history:
Feb 2009-Present. Superintendent, Cameron-Reilly LLC, Airway Heights, WA.
1.
Planned, scheduled and supervised concrete construction of new Library Road
pedestrian mall/transit plaza at center of campus at Washington State University.
Work scope included cast-in-place architectural walls, stairs and traffic paving.
Produced shop drawings and submittals using AutoCAD 2010.
Jan 2007-Jan 2009. Field Engineer, Paras Concrete Construction, Spokane
2.
Valley, WA.
Provided technical field supervision for construction of multi-story cast-in-place,
post-tensioned concrete and tilt-up projects. Produced all lift drawings and
formwork designs using AutoCAD 2008 (in 2d and 3d), assisted in layout and
verification of project dimensional controls. Provided support for change orders,
requests for information and material scheduling and procurement.
May 2006-Jan 2007. Assistant Superintendent, Kearsley Construction,
3.
Spokane, WA.
Planned, scheduled and supervised execution of cast-in-place concrete
construction for 70,000 square foot community college Business and Social
Sciences complex. Project consisted of multi-story architectural concrete walls and
columns. Handled all form design, supervised reinforcing steel placement and
directed all hoisting and rigging. Operated boom truck and forklift when needed.
December 2005-May 2006. Gang-forming supervisor, Paras Concrete
4.
Construction, Spokane Valley, WA.
Directed gang-forming fabrication and erection. Project included 1,000 feet of
service tunnel including complex building turn around point on lakefront site and
multi-story shearwalls on $60 million lakefront condominium project. Supervised
hoisting and rigging.
November 2004 – December 2005. Concrete formwork lead. Kearsley
5.
Construction, Spokane, WA.
Lead man on concrete layout and formwork for Eastern Washington University,
Senior Hall. Highlights include curved multi-floor balconies, curved stairs, and
elliptical seat-walls connecting seamlessly to curved site retaining walls. Also
handled seismic upgrade of existing 80 year old brick building.
August 2003 – November 2004. Carpenter Foreman, Paras Concrete
6.
Construction, Spokane Valley, Washington.
Performed layout and directed formwork at the University of Idaho Teaching and
Leaning Center and Washington State University Vogel Plant Sciences Complex.
Highlights include layout of excavation, foundations, basement walls, and curved
retaining walls. Idaho project included 10,000 square feet of multi-story, single-
sided concrete formwork. Directed placing of reinforcing steel. Read blueprints and
specifications, used theodolites and lasers to locate placement of structures.
Jun 2003 – August 2003. Graphic artist, Flexcel, Post Falls, Idaho.
7.
Produced web-based electronic work instructions for steel office furniture
manufacturer. Developed computer graphics using AutoCAD 2002 and Adobe
Illustrator. Created library of 3D design images using CAD solid modeling of
different product lines and components.
May 2002 – Jun 2003. Carpenter/Cabinetmaker, S. G. Morin. & Son
8.
Construction, Spokane, Washington.
Produced and installed commercial fixtures and millwork. Hung commercial doors
and hardware for hospital addition.
May 1996 – May 2002. Estimator/Material Coordinator/Project Manager.
9.
Cobra Roofing Services, Spokane, Washington.
Five years progressively responsible management position for architectural sheet
metal roofing and siding projects. Performed blueprint takeoffs, prepared
estimates, negotiated contracts and change orders handled complex, multi-phase
procurement assignments. Projects consisted of industrial facilities, military aircraft
hangars, university buildings and hospitals. Provided cost accounting reports and
manpower utilization data, prepared schedules (MS Project), maintained
correspondence and RFI Logs. Handled all invoicing and project closeout.
Produced shop drawings using AutoCAD 2000. Developed application for
downloading takeoff data from shop drawings to Access database.
August 1995 – May 1996. Lead carpenter, Williams Brothers Construction,
10.
Spokane, Washington.
Layout and set forms for wastewater treatment structures. Construct buildings and
install standing seam metal roofing and flashing.
February 1993 – August 1995. Architectural Sheet Metal Craftsman Cobra
11.
Corporation, Spokane, Washington.
Installed architectural sheet metal roofing, siding, panels and flashing. Projects
consisted of schools, hospitals and military facilities.
July 1992 – February 1993. Estimator, Beck Cabinets, Coeur d’Alene, Idaho.
12.
Blueprint takeoffs, estimate preparation. Produced shop drawings using AutoCAD
release 10. Implemented computerized system (Keytrix) for
design/sales/manufacture of commercial cabinets.
1990 – 1992. Estimator/Draftsman/Inside Sales, Metal Sales Manufacturing,
13.
Spokane.
Responsible for estimating, selling and providing technical support and shop
drawings for architectural, commercial and industrial metal panel projects.
Performed manual drafting of details and shop drawings.
1985 – 1990. Estimator/Project Manager, Adams Building Corporation, Walla
14.
Walla.
Provided full estimating and management for commercial and industrial design/build
projects with emphasis on industrial steel building projects. Coordinated design and
engineering, prepared estimates negotiated contracts and subcontracts supervised
construction and invoicing.
1979 – 1985. Self employed Cabinetmaker (concurrently with university
15.
attendance 1982-1985). Sold, designed and installed commercial plastic laminate
cabinets, fixtures and millwork for medical offices and hospitals.
1977 - 1978 Cabinet Maker, Walla Walla College, College Place Washington.