CHARLES R. KENDALL
**** ****** **. ( Visalia, CA 93291
Cell: 559-***-**** E-
MAIL: abh5u1@r.postjobfree.com
Summary
Plant/Operations Manager strategic thinker, planner, and coach with Fortune
500 experience
. Developed division budget and strategic operating plans
. Selected and mentored team members during a major plant
expansion
. Established goals and metrics to drive improved performance
Strong Leader responsible for safety, environmental compliance, product
quality
. Maintained record breaking safety performance while hiring 43% new work
force
Resolved a major quality issue and increased production 25%
Maintained strict environmental compliance with training, tools, records
Lean/Six Sigma Agent who implemented operational changes which lead to
record quality and profits.
Saved company $40 million in capital expansion using Six Sigma approach
. Used Lean tools to reduce weld shop labor by 30% in six months
Expanded plant wide IT system which increased on time delivery and customer
satisfaction
. Reduced labor costs by 29% while increasing line speed by 10% on
packaging line
PROFESSIONAL EXPERIENCE
BlueScope Buildings N.A. Visalia, CA
2008 - 2010
Plant Manager
. Reduced plant costs 35% using TPS during a $13 MM dollar integration
project
. Commissioned new equipment hired and trained 43% new work force in a non-
union metal fab. shop
. Reduced plant labor in weld shop by 30% using Lean Focus and key metrics
. Increased production and reduced maintenance expenses with Preventative
Maintenance
Boltaron Performance Products LLC Newcomerstown, OH
2007 - 2008
Operations Manager
. Directed safety, quality, and production for a non-union 24/7 PVC plastic
sheet manufacturer
. Implemented a rotating 24/7 unit schedule to reduce costs and improve
operations
. Set production records on all operating units with focused maintenance
and optimized schedules
AK Steel Zanesville Works Zanesville, OH
2005 - 2007
Manager of Operations and Maintenance
Directed production and maintenance personnel for a plant with 200+
employees, 8 direct reports, and $20 million dollar operating budget:
Responsible for employee safety, environmental compliance, product quality,
plant production, operating costs: Lead production scheduling, maintenance
planning, and unit outages to meet customer needs
. Restarted idled A&P line and reversing Z-mill. Ramped up plant from 150
to 200+ employees. Hired staff and hourly labor to support expanding
production.
. Developed and managed $25 MM annual plant operating and maintenance
budget.
. Set production records on 10 of 11 operating units helping lead to record
company profits
. Implemented preventative and predictive maintenance systems, which
reduced maintenance delays by 40% in just one year.
Charles R. Kendall C-559-***-****
Page 2
Schlabach Wood Design, Baltic, OH
2003 - 2005
General Manager
Developed strategic plan to improve plant output 75% and improve product
quality. Interfaced with all departments to meet company objectives and
ensure continuous improvement.
. Facilitated rearrangement of shop into work cells and
implemented CNC production
. Increased plant output 26% during the first year and doubled plant
output by the second year
. Expanded design and production capability by implementing 3D design
software and CNC production equipment leading to state of the art
custom one off designs
. Installed/Commissioned CNC router, CAD design system and cut
to length equipment / trained employees
. Utilized Six Sigma techniques to reduce scrap and rework in Face Frame
production
AK Steel Coshocton Operations, Coshocton, OH
1991- 2003
Electrical Maintenance & Automation Section Manager
Directed 30-50 professionals in major projects for a Fortune 500 specialty
steel company. Project successes resulted in promotions through four
corporate levels to Section Manager.
. Reduced system deployment cost by duplicating systems with in-house
employees
Created a Design and Improvement team which maintained and improved plant
process lines
Reduced plant electrical maintenance budget 21% in one year
Reduced major equipment outages for a one year cycle
AK Steel Coshocton Operations, Coshocton, OH
Senior Project Engineer
1995-1998
Managed installation and commissioning of major electrical upgrades and
capital improvement projects
Installed and commissioned $1 Million dollar electrical upgrade on
continuous A&P line
Installed (4) Automatic gage control systems on Reversing cold rolling
mills
Increased production on one process line 26% in first year of commissioning
Provided software and design specification to R&D department to be used in
other facilities
Utilized Lean Techniques to modify process banding line, eliminating two
full time operators in a seven man operation while improving production
speed by 10%
AK Steel Coshocton Operations, Coshocton, OH
Project Engineer
1993-1995
Worked with outside electrical suppliers and engineers to design and
purchase plant equipment to modernize and upgrade facility.
AK Steel Coshocton Operations, Coshocton, OH
Associate Engineer
1991-1993
Completed AutoCAD drawings and electrical project design
EDUCATION
MBA, Executive MBA Program, Ohio University
B.S., Electronics Engineering Technology, DeVry Institute of Technology
Awarded academic scholarship from Allied Signal
SKILLS
Experienced in Plant expansion and large startups
Team Builder with hands on approach
Skilled in Toyota Production Systems TPS
Trained large groups in technical areas and new production processes
Proficient user of Microsoft products (Word, Excel, Access, Powerpoint)