ALEXANDER V. ALLAIN, CPC
*** ******** **** ********, ** 70005 251-***-**** abh4nk@r.postjobfree.com
____________________________________________________________________________
______
Construction Management, Project Management, Project Engineer
Talented and accomplished project manager with professional experience and
academic training in construction. Proven ability to plan and lead
projects. Background in commercial general contracting and project
management and development. Knowledgeable in the hospitality, government
and industrial sectors. Hold TWIC certification and Certified Professional
Constructor (CPC).
Areas of Expertise
Project management Construction Management Team Building
and Leadership
Scheduling Cost and Budget Control Timberline Estimating
Timberline
Project Management Problem Solving Presentations Contract
Negotiations
Documentations and drawings Change Order Management Bid
Preparation
Safety Permitting Project Closeout documentation
____________________________________________________________________________
__
Experience
Regal Construction: LaPlace, LA
May 2010 to November
2010
Consultant Project Manager
Projects: Was hired in order to negotiate a $6,000,000 job in Franklin, LA
for Gulfcraft Inc... While trying to negotiate the Gulfcraft job, assisted
with the project management of Entergy Waterford Nuclear Plant OSGSF
Building. This building is a poured in place concrete structure with 3'
thick slab, 2' thick walls and 18" thick roof, with concrete pre-cast wall
panels to close up the front of the building. Also the project manager for,
Louisiana Federal Credit Union meetings and storage building, wrote all
subcontracts and purchase orders, reviewed shop drawing for compliance. Was
unable to negotiate the Gulfcraft job, but did get the plans to bid and
Regal decided not to bid the project.
Ollinger Construction, Inc. Mobile, AL
2001 to 2010
President/CEO Project Manager
Projects: Gulfstream Natural Gas, 4 Pre-Engineered Metal buildings one with
overhead crane and office. Masonic Building Fire Restoration, installed
temporary shoring, gutted the interior, tuck pointed structural connection
points, drove pilings and installed 4 floors of structural steel. Saenger
Theater Concession Addition tore out existing mezzanine walls and built
new, poured concrete floor, and completed the finish bars and concession.
Interior renovation to the Mobile and Pensacola airports necessary to
install new bagged screening post 911. New Office Building for Radcliff
Economy Marine, Interior build out for a Law Office, Phase One Saenger
Theater Renovations, consisted of new state of the art HVAC, stage rigging,
new sound system, acoustical wall systems, new concession and bathrooms,
plaster repair, painting and decorative painting, new opera boxes. E-911
Emergency Building Upgrades, new blast proof glass, bullet proof walls and
interior finishes, UCI Communications Office, took and old ware-house and
converted it to upscale office, Springhill College, Moore Hall structural
masonry, Mobile Regional Senior Community Center a 20,000 sf multi purpose
building with plunge pool, athletic floor, kitchen, offices, exercise
rooms, computer room, pool table room and meeting rooms, the structure was
a slab on grade with vertical structure of masonry and structural steel
with a brick facade. Fastening Solution Office Building and spec building,
two pre-engineered metal building with overhead doors, interior office
build out., McGill Toolen Stadium Facility consisted moving existing metal
stands to south side, building metal home a visitor side, 5,000 seat
capacity, new home field house with bathrooms and referee office, new
visitor locker room with concession and masonry bath rooms under the entire
length of the home stands.. Bids for concrete super structure for the new
engineering and computer science building at the University of South
Alabama for Elkins Construction, Jacksonville Florida.
RCCI, Inc. Mobile, AL
2000 to 2001
Project Manager
Projects: Rave Motion Picture Theaters in Pensacola started from ground up,
a masonry with stucco exterior finish and structural steel frames for seats
and second floor projector rooms, with complete architectural build out, in
Hickory Creek, Texas, took over the construction of the facility with the
slab poured and concrete walls going up, finished the cmu and exterior
stucco, and completed the entire structural and architectural build out and
a concrete parking lot
Resort Communities
1987 to 1996
Project Manager/ Construction manager for seven major resorts in Vero
Beach, Florida, Lake Ozark, Missouri, Lafayette Louisiana, Fairhope Alabama
and Gulf Shores, Alabama. Built clubhouses, maintenance buildings, tennis
centers, natatorium, sales offices, pump stations and rest stations.
Education:
Louisiana State University, Bachelor of Science in Construction
Management
Awards:
Build Alabama AGC Award
AGC Safety Award, 2007
AGC Safety Award, 2008