Post Job Free

Resume

Sign in

Engineer Project

Location:
Dallas, NC, 28034
Posted:
November 18, 2010

Contact this candidate

Resume:

David S. McNeely

*** ********* ****, ******, ** 28034 H: 704-***-**** C: 704-***-**** E:

abh380@r.postjobfree.com

SUMMARY:

My ambition is to develop a successful, multifaceted career. I am a

hardworking, disciplined individual committed to delivering superior

results. I communicate and engage individuals at all levels. I believe in

being 100% accountable using my entrepreneurial skills to create innovative

solutions and putting these solutions into action. Teamwork is a very

important part of my work ethic to motivate individuals to work towards

achieving the project goal. I am a highly organized and project-driven

superintendent with 20 plus years experience in heavy industrial

construction. I can demonstrate proficiency in all phases of construction,

safety and engineering. I adhere to the ethic of "doing what is right" to

service clients, contractors and employees.

PROFESSIONAL EXPERIENCE:

SUPERINTENDENT, White Construction Inc., 2009 - PRESENT

Project: Blue Canyon Wind Farm Project

Scope of work involved installing 67 foundations for Horizon Energy. Type:

GE 1.5 wind turbines

Required skills:

. Established elevation for all rock socket foundations and spread

foundations.

. Structural Quality Control - Inspection of completed super structures

. Collaboration with updates to Assistant Project Engineer

. Prepare work day with drawings

. Responsible for professional appearance and relationships with

vendors, inspectors and management

. Supervised three different crews: foundations, mudmat, and grout.

. Preformed punch list closeout of project.

OPERATION MANAGER, McNeely Concrete and Construction Company, Inc. 2008 -

2009

Scope of work involved extensive remolding projects. Will provided

photograph of said projects upon request.

SUPERINTENDENT, D. S. Simmons, Inc. 2007 - 2008

Project: BMW Plant Paint Project 2.4 million sq ft Plant Expansion in

Greer, SC

Scope of work involved installing caisson installations and pouring footers

for $120M subcontract for Walbridge Aldinger Construction Company. Managed

a 12-man crew supervising all pours and equipment. Scope of work was 93%

complete within three months, which was ahead of the 12-month projected

timeline.

FIELD ENGINEER, Pizzagalli Construction Company 2006 - 2007

Project: Sugar Creek Wastewater Treatment Plant Expansion in Charlotte, NC

Performed necessary field engineering to complete the installation of the

new pump station, backup basin and ductile iron pipe. Specific

responsibilities included technical advising, calculation assistance, new

field engineer training, organizing computer files, establishing sound

field and office procedures, checking calculations and field work,

coordinating engineering & surveying activities. Required skills:

. Structural layout from offset and baseline points

. Structural Quality Control - Inspection of completed super structures

. Collaboration with updates to Assistant Project Engineer

. Prepare work day with drawings

. Responsible for professional appearance and relationships with

vendors, inspectors and management

. TopservGPS operation

FIELD ENGINEER, Tidewater Skanska USA 2005 - 2006

Project: Woodrow Wilson Bridge Project/US Route 1 Interchange VA67-VDOT in

Alexandria, VA.

Performed engineering and layout of the bridges for the US Route 1

Interchange Project. Numerous bridges for the various sections of the

interchange were completed on schedule within fifteen months. I supported

project management with the structural layout from offset to baseline

points. Requirements for this position were:

. Structural Quality Control - Inspection of completed super structures

. Pile layout

. Deck layout and grading (SIP)

. Test concrete

. Collaboration with updates to Assistant Project Engineer

. Prepare work day with drawings

. Responsible for knowledge for 83 different concrete mix designs

. Responsible for professional appearance and relationships with

vendors, inspectors and management

. Certification for ACI Concrete Technician Grade I and continued

certifications

. Concrete equipment operations (Bidwell screed), concrete trucks and

pumps

FIELD ENGINEER, Lee Construction Company of the Carolinas, Inc. 2003 - 2004

Projects: Various Bridge Maintenance Projects in North and South Carolina

Internship involved providing field-engineering support and oversees the

quality of work to meet Department of Transportation specifications for

both North Carolina and South Carolina bridge maintenance construction

projects. This position involved light survey work and beam analysis. In

addition, specific responsibilities included providing data to management

for the estimating process, bidding process and project materials

purchasing requirements to complete bidding on projects. Specific

responsibilities involved supervising crews in various phases of bridge

construction.

SUPERINTENDENT, Turner Murphy Company, Inc. 2000

Project: Kerr Lake Regional Water Treatment Plant Renovation in Henderson,

NC

Supervised crew operations in upgrading the processing facility from liquid

chlorine to sodium hypo-chloride. Specific responsibilities included

setting up the jobsite, permits, construction scheduling, materials

purchasing, rental equipment, budgeting, estimating of change orders, cost

management and surveying. One of my main responsibilities was for the

construction of the concrete containment aeration basins and holding tanks.

This job also involved installation of 48" ductile iron pipe with

mechanical joints and double tees.

VICE PRESIDENT-OPERATIONS, McNeely Concrete and Construction, Inc. 2000

Projects: Walgreen's Pharmacy Stores (Concord, Belmont, & Kannapolis) and

Fairfield Mountain Resort Estates Retaining Wall Project

Managed the operations for the business. Specific responsibilities

involved the estimating & bidding process for commercial subcontracts.

Supervised each project and crew involved in all concrete pours for design

build projects for small commercial (retail chains) and residential

construction requiring knowledge of proper procedures for design of

Polysteel retention system. Fairfield Mountain required knowledge of civil

engineering and hydrologic design requirements for the retention wall

system.

CONCRETE SUPERINTENDENT, Pizzagalli Construction Company 1999 - 2000

Project: Charlotte-Mecklenburg Utilities Erwin Creek Waste Water Treatment

Plant Expansion

Lead Carpenter overseeing concrete placement, finishing, and form

carpentry. Specific responsibilities included layout of line and grade for

clarifiers and mechanical work to set ductile iron pipe. Occasional

operation of backhoe and track hoe was required.

CONCRETE SUPERINTENDENT, Metric Constructors 1997 - 1999

Project: Charlotte-Mecklenburg Utilities McAlpine Waste Water Treatment

Plant Expansion

Lead supervisor of eleven form carpenters, thirteen concrete finishers and

six laborers for expansion of facility. Specific responsibilities required

the following skills: determining layout of line and grade for clarifiers

and facilities, welding (arc), budgeting, expense tracking, engineering

concrete forms, scheduling and placing concrete. Occasional operation

required of backhoe and track hoe.

CONCRETE SUPERINTENDENT, Balfour Beatty 1995 - 1997

Project: City of Gastonia Long Creek Waste Water Treatment Plant Expansion

Supervised a six-man carpentry crew, eight operators, and twelve concrete

finishers for completion of clarifiers and hypochlorite facility. Completed

largest concrete pour in the history of Balfour Beatty on site. Specific

responsibilities included line and grade work, design and engineering of

concrete form systems, welding (arc), budgeting and expense tracking, form

carpentry. Also, some backhoe and track hoe operations were required.

FOREMAN, Brasfield & Gorie 1994 - 1995

Project: Charlotte-Mecklenburg Utilities North Mecklenburg Water Treatment

Plant

I was responsible for concrete placement, finishing and carpentry. Gang

forms were stick built. The job required welding (arc), backhoe

operations, line and grade work, mechanical pipe setting, maintenance and

acquisition of concrete forms.

LEAD CARPENTER, Miller & Long Construction Company 1993 - 1994

Project: Charlotte Mecklenburg NFL Panther Stadium

Position involved a team effort of 20 Lead Carpenters placing various

assigned sections to build concrete forms, placement and finish on site.

Specific responsibilities entailed the building of forms, placing and

finishing of concrete for the rakers, ramps and stairwells in the stadium.

CARPENTER/MILL WRIGHT, Tidewater Construction Company 1991 - 1993

Project: Westvaco Plant Renovation in Covington, Virginia

This project was a major renovation of the plant involving concrete

placement for Tidewater which now Tidewater Skanska. Specific

responsibilities involved for building forms for 438-foot emissions stack

and installing scaffolding inside Honeywell TDC Boiler. Contributed to the

building and pouring of concrete for three designated digesters.

Additional responsibilities included elevation shots, welding, setting

machinery, millwright work, and demolition. Apprenticed as a Journeyman

Carpenter and Mill Wright on this job. Worked in a team driven

environment.

MILITARY SERVICE:

United States Army Reserves PFC1. 1981 - 1987 MOS: Combat Engineer 62F and

55B

SKILLS:

TRADE

Local Laborers Union 980 member (Journeyman Carpenter)

Welding

Masonry I

Concrete Placement

Technical Applications Mechanical Pipe Placement

Mill Wright.

EQUIPMENT OPERATION

Backhoe / track hoe / Grove 110-ton capacity, all-terrain crane / 35-ton

boom truck / Bidwell deck screed equipment / various concrete placement

equipment / concrete pump equipment operation

COMPUTER

Microsoft Office Products: (Excel and Word limited experience) PowerPoint

presentations

Course work in engineering software: AutoCAD, Flowmaster and AISC Steel

Construction

Lab collection, analysis, and testing of: water, material, and soil samples

Topcon survey equipment used for bridge construction.

Limited experience using TDS 48GX Survey Pro and 1MB GX

EDUCATION:

Gaston College - Associates Degree in Applied Science - Civil Engineering

Technology, 2004

CONTINUING EDUCATION COURSES

ACI Concrete Field Testing Technician - Grade I, Expires: June 30, 2010

Alexandria, VA

ACI Testing Center - Fredericksburg, VA Website:

www.concrete.org/Certification

Federal OSHA Training - Mercer Equipment Company, (now United Rentals)

Charlotte, NC

08/12/1997 Confined Space Entry Requirements (Part 1910.146) Course

included supervisor responsibilities

07/25/1997 Trenching and Excavation Worker Training

Local Union 980 - AGC Education & Training Center, Pomfret, CT

Website: www.vanclaborers.org/training/apprenticeships.htm

06/09/1994 Lead Paint Abatement Worker Certificate # 235115307LEDA0694

05/13/1994 Asbestos Abatement Worker Certificate of Completion

03/11/1994 80-Hour Hazardous Waste Certificate # L3606950394 OSHA Reg.

29 FR1910.120)

02/15/1994 Oxygen Acetylene Cutting and Demolition

MEMBERSHIPS:

Member of the Civil Engineering Club, Gaston College, Dallas, North

Carolina

REFERENCES:

Gaston College

Dr. Moayyad Al-Nasra, (P.E., CPESC) Chairman, Civil Engineering Technology

P: 704-***-****

Keith Lackey (R.L.S.). Instructor, Civil Engineering Technology AAS

P: 704-***-****

Blue Canyon Wind Farm Project

Charles Kennedy Project Manager C: 812-***-****

Dave Davis Civil Superintendent C: 815-***-****

Joe Marietta Foundation Superintendent C: 812-***-****

Josh Brackall Site Safety Manager C: 812-***-****

Mark Darling Civil Superintendent C: 812-***-****

Bruce Speth Vice President of H. R. C: 812-***-****

Ranlo, NC Storm water Project Phase 1

Supervisor: Craven Hudson P: 910-***-****

Woodrow Wilson Bridge Project

David Kavnaugh Sr. Engineer C: 269-***-****, E:

abh380@r.postjobfree.com

Emir K. J. Davis, WWB Sr. Structures Inspector P: 703-***-****, C:

571-***-****, F: 703-***-****

Louis A. Defenaini, (Dino) WWB Inspector P: 540-***-****, C: (540)

447-4184

Frank Gunkelman, Field Engineer P: 703-***-****

Paulo Chisari, Field Engineer P: 703-***-****

Kendry Contreras, Field Engineer P: 703-***-****

Greg Hunter, Craft Superintendent C: 202-***-****, W: 703 - 960 -

9494

BMW Manufacturing Plant

Walbridge Aldinger:

Rick Wahlstrom, Project Superintendent C: 313-***-****

Randy Ross, Project Manager C: 330-***-****

Jon M. Schwartz, Project Engineer C: 313-***-****, F: 313-***-****

D.S. Simmons, Inc.

Marvin Creech, Vice President - Charlotte Div. C: 704-***-****, F:

704-***-**** E:abh380@r.postjobfree.com

4-H Concrete, LLC:

Todd Bayne C: 864-***-****, F: 864-***-****

WWTP for Charlotte-Mecklenburg Utilities (CMUD)

Randy Gibson, Utilities Project Coordinator C: 704-***-****

Engineering & Surveying for CMUD

Meade Gunnel, P.E.19810-A West Catawba Avenue, Cornelius, NC 28031

Richard E Navy, P. L. S. C: 704-***-****

Individual References:

North State Polysteel

Jeffrey R Childress, Vice President P: 828-***-****, C: (828) 381-

2052 H: 828-***-****

McNeely Concrete & Construction

Marla McNeely, President C: 704-***-****

PROJECT LIST:

Blue Canyon Wind Farm Expansion, Lawton OK

$680.9 M

McNeely Concrete & Construction

Commercial/Residential Projects $348,000

BMW Plant Paint Project 2.4 million sq ft Plant Expansion, Greer, SC$400M

Walgreen's Pharmacy Stores (Concord, Belmont, & Kannapolis)

$744,000

Fairfield Mountain Resort Estates Retaining Wall Project,

$75,000

Westvaco Plant Renovation in Covington, Virginia

$1.15B

Utilities Projects

Charlotte-Mecklenburg Utilities Sugar Creek Wastewater Treatment Plant Exp.

Charlotte, NC $ 79M

Charlotte-Mecklenburg Utilities Sugar Creek Wastewater Treatment Plant Exp.

Charlotte, NC $ 87M

Charlotte-Mecklenburg Utilities Erwin Waste Water Treatment Plant

$ 67M

Charlotte-Mecklenburg Utilities McAlpine Waste Water Treatment Plant

$ 57M

Charlotte-Mecklenburg Utilities Lake Norman Water Treatment Plant

$110M

http://www.charmeck.org/Departments/Utilities/Construction+Projects/home.htm

Kerr Lake Henderson Regional Water Treatment Facility

$2.6M

City of Gastonia Long Creek Water Treatment Facility

$52M

Bridge Projects

Charlotte-Mecklenburg (City of Charlotte) 53 Bridge Maintenance Projects

$287,000

Greenville, SC West Washington Street CSX Railroad Bridge $16M

Columbia, SC I-26 Interchange Bridge

$22M

Columbia, SC Broad River Road Pedestrian Bridge

$11M

Rock Hill, SC I-77N & S bound lanes Bridges $18M

Woodrow Wilson Bridge Project/US Rte 1 Interchange VA67-VDOT Project in

Alexandria, VA $146.6M



Contact this candidate