Post Job Free
Sign in

Manager Plant

Location:
Chicago Heights, IL, 60411
Posted:
December 01, 2010

Contact this candidate

Resume:

Ricardo (Rick) Villarreal

*** **** ******* ***** ******* Heights Il. 60411

Home: 708-***-**** Cell: 708-***-****

*************@*******.***

Objective: Operations Supervisor

Qualifications:

26 years in Steel Processing Industry (Operations/Shipping/Maintenance)

15 years in Management teams (Operations Plant Supervisor)

15 years Tool and equipment calibrations (Maintenance/Quality Departments)

BOSaNOVA AS400 system, Lotus Notes, Microsoft Office Professional 2007:

Outlook, Word, Excel, Power Point, Picture Manager, CMS (Customer

Management System), ASKO Edge Master, Plant P.O. System, WODS (Work Order

Delay System), Controlink Systems.

Education: Bloom Trail High School

New Process Steel LLC 5761 West 118th Street Alsip, Illinois

60803 708-***-****

May 2005 to Nov 2009 (2nd shift sonority lay off) No union

Position: Operation Production/Shipping

Plant Supervisor

(swing shift/shipping/production/maintenance)

Achievements: Improved slitter changeovers from 47

minutes down to 7 minute average changeover times. Many great ideas that

helped operators, helpers and setup men do their jobs easier which

succeeded change over times. Designed and helped maintenance team build all

new work stations throughout plant (with all tools needed) for fewer worker

foot prints resulting in less stressed employees and more safe productive

employees. Ordered shop supplies from several different vendors and

suppliers for all departments. Continuous improvement programs every month

with meeting with all crews. Safety meetings held daily with entire shift

crew. 23 full time employees, 2-precision slitters with packaging line, 1-

Cut to Length, 2-CNC Turret presses, 3-bays with 25-ton cranes, 3-drive

through shipping and receiving bays, 12-Computors with printers, on call 24

hours a day 7 days a week, Lean Manufacturing/5S used daily.

Dockside Steel LLC 11828 S Stony Island Chicago Illinois

60617 773-***-****) Union

Winter 2000 to June 2005 (Hired at New Process Steel)

Position: 2nd shift

Shipping/Production/Maintenance Supervisor

Achievements: Improved operator errors in shipping

and production. Inbound and outbound shipments were improved that later led

to most trucking companies preferring to be loaded and/or unloaded during

2nd shift hours. I purchased my own walkie talkies and rechargeable

batteries to improve communications throughout plant. I spread radios to

all crane operators, fork truck drivers, slitting operators and leveling

operators. This great idea led to improved loading and unloading of trucks,

material spotting and staging, material transfers to machines, skid and

lumber transfers. No more lost times in all departments which led to

increased production on all 4 machines and their packaging lines.

Nacme Steel Processing LLC 429 West 127th Street, Chicago Illinois 60628

773-***-****) Union

June 1996 to winter 2000 all employees laid off due to Acme

Steel closing its doors

Position: Operator and Setup Man on

brand new Pro/Eco three slitter head, double recoiler 80,000 pound max,

slitter. Gauge range .040" to .500". I left a Supervisor position at

Loeffel Steel Products to join a new start up company in hope of a

Supervisor Position.

Achievements: Broke all productions records in Acme

Steel and all of National Material (Cyrus Tang Industries). Ran 1,800,000

pounds in 8 hours, 43 coils in 8 hours, 75 passes in 8 hours with no lost

time from crane operators loading and/or unloading machine. First operator

to successfully run hot 280 degree 1080 grade hot roll agricultural steel

without it breaking apart at recoiler gripper. I worked very hard

continuously proving my experience and capabilities in production and

organization skills to have the opportunity at a supervisor position but

new supervisors were replaced by National Material Supervisors from other

plants and then entire plant laid off from Acme Steel closing its doors.

Loeffel Steel Products 14100 South Halsted, Riverdale Illinois

60827 708-***-****) No union

April 1987 to June 1996 (Hired at Nacme Steel)

Position: First laid off employee

called back to work on all machines in plant while being capable to handle

maintenance and shipping duties. Helped trained new employees on all

positions and was later promoted to Plant Supervisor overlooking all

departments.

Achievements: Trained new employees in Shipping

Department, Coil/Supply Receiving, Crane Operators, Fork lift operator,

Reach Truck Operators, Slitting Operations, Slitter Setup. The only

Supervisor experienced and paid overtime rate to run slitters when

requested by Plant Manager and work with maintenance team.

Also responsible for all calibration testing of all micrometers, calipers,

olson tester and fluting tester. Double checked OD/ID mic readings,

coating, rockwell, olson test before material was loaded on all slitters.

Special Note:

Metal-Matic Inc, Carbon Steel Tubing

7200 S. Narragansette Ave. Bedford Park, Il 60638 1-800-***-****

Slitter Setup/Operations Consultant 2008 to most of 2009

I was offered a contract by Operations Plant Manager at Metal-Matic as a

Slitter Consultant but could not dedicate time requested due to working

full time at New Process Steel. I made a deal to go help on a "walk in

basis". I gave presentations to all crews on improvement ideas. Recognized

some issues and helped Plant Coordinator schedule equipment to be rebuilt.

Trained employees on mathematical formula procedures that would result in

error free setups and helped Plant Coordinator build micros excel spread

sheet that would help build proper accurate setups for crews. I was

complimented by crews and Operations Plant Manager on slit edge quality of

stock coils waiting for further processing in tube mills. I was unable to

go back due to a serious decline in sales orders at my current job (New

Process Steel) and was scheduled 2pm to 2am.



Contact this candidate