R E S U M E
Robert J. Doublebower P.E. **** Paseo del
Vista, Carlsbad, CA 92009
760-***-**** ***********@*********.***
EDUCATION - Villanova University, Villanova, PA
B.S.C.E. 1968. Full academic scholarship.
REGISTRATION - California, Civil. Since 1986 #C41563
Nevada, Civil. Pending
Virginia. 1984 (inactive), Colorado. 1973
(inactive)
WORK HISTORY - GROUPED
(xx) - chronological sequence
Total Experience - 38.3 years Thru: June 2010
Thru June 2010 10.4 yrs. SHORING DESIGN
Oct.2003 to Present: Regional Shoring Design, Inc., 6730 Paseo del Vista,
Carlsbad, Ca (27)
President & Design Principal,
? Design and drawing production for temporary and
permanent shoring. Projects include: Cantilevered and Tied-
back Soldier Beam & Lagging for Lot-line and Building
excavations, internally braced Soldier Beam and Sheetpile
bulkheads for deep Pump Station excavations, temporary and
permanent soil nail walls, temporary building underpinning.
Feb.2001-Sep.2003: Wagner Construction, 12512 Hwy. 67, Lakeside, CA
(26)
Chief Engineer,,
? same as above
Feb.2000-Feb.2001: Design Engineer,
? same as above
13.2 yrs. STRUCTURAL
ENGINEERING
Oct.1998-Sep.1999: Accutech Engineering 5575 Magnatron Blvd. San
Diego, CA (25)
? Structural design of residential and commercial projects.
Investigate instances of foundation distress. Prepare
Reports.
Dec.1997-Oct.1998: Engineering Design Group, 2121 Montiel Rd.,
San Marcos, CA (24)
? Structural design (residential), Analyze and log
Geotechnical investigations.
Aug.1995-Apr.1996: R.J. Doublebower Engineering, 2466 Warren Lane,
Walnut Creek, CA (22)
? Structural design of construction facilities. Temporary
roof support for Burlingame (CA) Library renovation.
Jun.1993-Jun.1995: Koepf & Lange, Consulting Engineers, Lafayette, CA
(21)
? Project Engineer, responsible for engineering layout and
ACAD for various military projects in SF Bay Area.
Compiled project Operation & Maintenance manual.
Dec.1986-Dec.1987: R.J. Doublebower Engineering, 2466 Warren Lane,
Walnut Creek, CA (15)
? Preparation of Tilt-up panel casting drawings for Office
& Commercial buildings and Prison installations throughout
CA.
Dec.1982-Aug.1984: Bayshore Concrete Products, Inc., Cape Charles, VA
(12)
? Chief Engineer. Supervised layout and product drawing
production for Precast Concrete cylinder pile and AASHTO
girder supplier. Supervised Quality Control dept.
Feb.1982-Oct.1982: Tanner Precast and Architectural Concrete, Phoenix,
AZ (11)
? Structural design of precast concrete double tees,
girders, beams and columns.
Jan.1979-Apr.1980: Stanley Structures, Denver, CO (9)
? Structural design of precast concrete double tees,
girders, beams and columns. Promoted to Quality Control
Manager (see "Field").
Aug.1976-Feb.1977: Alternative Energy Research, Inc., Steamboat
Springs, CA (7)
? Feasibility designs for power generation from low-head
water turbines.
Jun.1975-Oct.1975: Alternative Energy Research, Inc., Steamboat
Springs, CA (4)
? Co-Founder. Investigate and promote solar installations
and methane generation.
Jan.1973-Apr.1973: Stearns-Roger, Inc., Denver, CO. (2)
? Structural design of foundation elements for 250MW power
plant in Hayden, CO. Requested on-site assignment (see
"Field")
Jun.1968-Aug.1971: Bechtel (Power) Corporation, Gaithersburg, MD (1)
? Structural design of building elements for 2 nuclear and
1 coal-fired power plants.
14.7 yrs. FIELD CONSTRUCTION
SUPPORT
Apr.1996-Oct.1997: R.P. Richards Construction Co., Goleta, CA (23)
? Quality Control Manager (CQC) for Gravity /Forced Main
Sewer and Pump Station installation, and Helicopter
Maintenance facility expansion at Camp Pendleton, CA
Jul.1992-Jun.1993: GSE Construction, Livermore, CA (20)
? Superintendent for large patio reconstruction and
waterproofing over lower level electrical switchgear at
Social Security Admin. in Richmond, CA, amid persistent
rain.
Jan.1991-Jul.1992: GSE Construction, Livermore, CA (19)
? Quality Control Manager (CQC) for Fire Station /
Communication Center at Mare Island Naval Station, CA
Jun.1990-Nov.1990: Dennis Simone Construction, Oakland, CA (18)
? Quality Control Manager (CQC) for barracks
rehabilitation at Alameda NAS, CA
Jun.1988-May.1990: Hensel Phelps Construction Co., Santa Clara, CA
(17)
? Quality Control Manager (CQC) for new $16M Plating
Facility at Alameda NAS, CA. Responsible for all project
compliance and submittal review. Supervised staff of 3.
Jan.1988-Jun.1988: J.E. McAmis Construction Co., Chico, CA (16)
? Quality Control Manager (CQC) for new Seawall
construction at Alameda NAS, CA
Feb.1986-Nov.1986: R.J. Doublebower Engineering, 2466 Warren Lane,
Walnut Creek, CA (14)
? Independent contractor managing field erection of precast
concrete elements for 3 projects: Santa Cruz CA parking
structure, Fresh Start Bakery in Modesto, CA, and Lockheed
Plating Facility in Mountain View, CA.
Oct.1984-Jan.1986: Kie-Con, Inc. (Peter Kiewit & Sons precast concrete
facility), Antioch, CA (13)
? Field monitoring placement of architectural precast
concrete panels on 6 story office building and parking
struct. in Concord, CA. Then, Foreman for yard production
crew.
Apr.1980-Feb.1982: Stanley Structures, Denver, CO (10)
? Quality Control Manager for precast concrete production
plant. Supervised 12 inspectors overseeing twin tee, beam,
AASHTO girder, 'Span-Deck', and precast panel production.
Supervised concrete laboratory technicians.
Feb.1977-Apr.1978: Burns & McDonnell Engineering Co., Kansas City, MO.
(8)
? Inspector for construction of 110 mile, 230 KV power
transmission line in Safford, AZ, Monitored wood pole
placement, conductor installation and sag adjustment.
Apr.1976-Aug.1976: Teng & Associates, Chicago, IL (6)
? Resident Engineer for 230 KV inter-tie power
transmission line near Pueblo, CO.
Oct.1975-Apr.1976: (same) (5)
? Structural Inspector for 345KV steel lattice tower
transmission line near Steamboat Springs, CO. Climbed
towers to verify assembly compliance.
Apr.1973-Jun.1975: Stearns-Roger, Inc., Denver, CO (3)
? Resident Structural Engineer for construction of 250 MW
power plant in Hayden, CO. Monitored drilled piers, grade
beam construction and structural steel erection.
MEMBERSHIPS: ADSC - The International Association of Foundation
Drilling
ASCE - Geotechnical Engineering Division (local chapter)
The SAN DIEGO WRITERS/EDITORS GUILD. Board member since
1998
Past President - 2000/2001.
PROFICIENCIES: AuotCADD (basic), MathCADD, Beam2D, MS Office
INTERESTS: Golf, Woodworking