R E S U M E

Robert J. Doublebower P.E. **** Paseo del

Vista, Carlsbad, CA 92009

760-***-**** ***********@*********.***

EDUCATION - Villanova University, Villanova, PA

B.S.C.E. 1968. Full academic scholarship.

REGISTRATION - California, Civil. Since 1986 #C41563

Nevada, Civil. Pending

Virginia. 1984 (inactive), Colorado. 1973

(inactive)

WORK HISTORY - GROUPED

(xx) - chronological sequence

Total Experience - 38.3 years Thru: June 2010

Thru June 2010 10.4 yrs. SHORING DESIGN

Oct.2003 to Present: Regional Shoring Design, Inc., 6730 Paseo del Vista,

Carlsbad, Ca (27)

President & Design Principal,

? Design and drawing production for temporary and

permanent shoring. Projects include: Cantilevered and Tied-

back Soldier Beam & Lagging for Lot-line and Building

excavations, internally braced Soldier Beam and Sheetpile

bulkheads for deep Pump Station excavations, temporary and

permanent soil nail walls, temporary building underpinning.

Feb.2001-Sep.2003: Wagner Construction, 12512 Hwy. 67, Lakeside, CA

(26)

Chief Engineer,,

? same as above

Feb.2000-Feb.2001: Design Engineer,

? same as above

13.2 yrs. STRUCTURAL

ENGINEERING

Oct.1998-Sep.1999: Accutech Engineering 5575 Magnatron Blvd. San

Diego, CA (25)

? Structural design of residential and commercial projects.

Investigate instances of foundation distress. Prepare

Reports.

Dec.1997-Oct.1998: Engineering Design Group, 2121 Montiel Rd.,

San Marcos, CA (24)

? Structural design (residential), Analyze and log

Geotechnical investigations.

Aug.1995-Apr.1996: R.J. Doublebower Engineering, 2466 Warren Lane,

Walnut Creek, CA (22)

? Structural design of construction facilities. Temporary

roof support for Burlingame (CA) Library renovation.

Jun.1993-Jun.1995: Koepf & Lange, Consulting Engineers, Lafayette, CA

(21)

? Project Engineer, responsible for engineering layout and

ACAD for various military projects in SF Bay Area.

Compiled project Operation & Maintenance manual.

Dec.1986-Dec.1987: R.J. Doublebower Engineering, 2466 Warren Lane,

Walnut Creek, CA (15)

? Preparation of Tilt-up panel casting drawings for Office

& Commercial buildings and Prison installations throughout

CA.

Dec.1982-Aug.1984: Bayshore Concrete Products, Inc., Cape Charles, VA

(12)

? Chief Engineer. Supervised layout and product drawing

production for Precast Concrete cylinder pile and AASHTO

girder supplier. Supervised Quality Control dept.

Feb.1982-Oct.1982: Tanner Precast and Architectural Concrete, Phoenix,

AZ (11)

? Structural design of precast concrete double tees,

girders, beams and columns.

Jan.1979-Apr.1980: Stanley Structures, Denver, CO (9)

? Structural design of precast concrete double tees,

girders, beams and columns. Promoted to Quality Control

Manager (see "Field").

Aug.1976-Feb.1977: Alternative Energy Research, Inc., Steamboat

Springs, CA (7)

? Feasibility designs for power generation from low-head

water turbines.

Jun.1975-Oct.1975: Alternative Energy Research, Inc., Steamboat

Springs, CA (4)

? Co-Founder. Investigate and promote solar installations

and methane generation.

Jan.1973-Apr.1973: Stearns-Roger, Inc., Denver, CO. (2)

? Structural design of foundation elements for 250MW power

plant in Hayden, CO. Requested on-site assignment (see

"Field")

Jun.1968-Aug.1971: Bechtel (Power) Corporation, Gaithersburg, MD (1)

? Structural design of building elements for 2 nuclear and

1 coal-fired power plants.

14.7 yrs. FIELD CONSTRUCTION

SUPPORT

Apr.1996-Oct.1997: R.P. Richards Construction Co., Goleta, CA (23)

? Quality Control Manager (CQC) for Gravity /Forced Main

Sewer and Pump Station installation, and Helicopter

Maintenance facility expansion at Camp Pendleton, CA

Jul.1992-Jun.1993: GSE Construction, Livermore, CA (20)

? Superintendent for large patio reconstruction and

waterproofing over lower level electrical switchgear at

Social Security Admin. in Richmond, CA, amid persistent

rain.

Jan.1991-Jul.1992: GSE Construction, Livermore, CA (19)

? Quality Control Manager (CQC) for Fire Station /

Communication Center at Mare Island Naval Station, CA

Jun.1990-Nov.1990: Dennis Simone Construction, Oakland, CA (18)

? Quality Control Manager (CQC) for barracks

rehabilitation at Alameda NAS, CA

Jun.1988-May.1990: Hensel Phelps Construction Co., Santa Clara, CA

(17)

? Quality Control Manager (CQC) for new $16M Plating

Facility at Alameda NAS, CA. Responsible for all project

compliance and submittal review. Supervised staff of 3.

Jan.1988-Jun.1988: J.E. McAmis Construction Co., Chico, CA (16)

? Quality Control Manager (CQC) for new Seawall

construction at Alameda NAS, CA

Feb.1986-Nov.1986: R.J. Doublebower Engineering, 2466 Warren Lane,

Walnut Creek, CA (14)

? Independent contractor managing field erection of precast

concrete elements for 3 projects: Santa Cruz CA parking

structure, Fresh Start Bakery in Modesto, CA, and Lockheed

Plating Facility in Mountain View, CA.

Oct.1984-Jan.1986: Kie-Con, Inc. (Peter Kiewit & Sons precast concrete

facility), Antioch, CA (13)

? Field monitoring placement of architectural precast

concrete panels on 6 story office building and parking

struct. in Concord, CA. Then, Foreman for yard production

crew.

Apr.1980-Feb.1982: Stanley Structures, Denver, CO (10)

? Quality Control Manager for precast concrete production

plant. Supervised 12 inspectors overseeing twin tee, beam,

AASHTO girder, 'Span-Deck', and precast panel production.

Supervised concrete laboratory technicians.

Feb.1977-Apr.1978: Burns & McDonnell Engineering Co., Kansas City, MO.

(8)

? Inspector for construction of 110 mile, 230 KV power

transmission line in Safford, AZ, Monitored wood pole

placement, conductor installation and sag adjustment.

Apr.1976-Aug.1976: Teng & Associates, Chicago, IL (6)

? Resident Engineer for 230 KV inter-tie power

transmission line near Pueblo, CO.

Oct.1975-Apr.1976: (same) (5)

? Structural Inspector for 345KV steel lattice tower

transmission line near Steamboat Springs, CO. Climbed

towers to verify assembly compliance.

Apr.1973-Jun.1975: Stearns-Roger, Inc., Denver, CO (3)

? Resident Structural Engineer for construction of 250 MW

power plant in Hayden, CO. Monitored drilled piers, grade

beam construction and structural steel erection.

MEMBERSHIPS: ADSC - The International Association of Foundation

Drilling

ASCE - Geotechnical Engineering Division (local chapter)

The SAN DIEGO WRITERS/EDITORS GUILD. Board member since

1998

Past President - 2000/2001.

PROFICIENCIES: AuotCADD (basic), MathCADD, Beam2D, MS Office

INTERESTS: Golf, Woodworking