Christopher Oliver
Conroe, TX *****
Cellular 936-***-****
*************@*****.***
OBJECTIVE
To be associated with a company where growth and professional expansion is available and to
give my personal best for the sucess of the company.
QUALIFICATION HIGHLIGHTS
* NCCER Certified in Rigging
* 100% of jobs have been completed on time or ahead of schedule
* Commended for dedicated work ethic and rewarded by steady promotions and training in all
aspects of work.
* Received numerous accolades from clients for superior workmanship.
EXPERIENCE
Journeyman/Rigger/Lead Man - 2010 - 2010
TEI, Bastrop, TX
* Change out of horizontal air heater baskets.
* Took out baskets in 6 hours when estimated time was 36 hours.
* Leadman of five man rigging crew
Journeyman/ Rigger - 2010 - 2010
PMSI, Huntington, Utah
* Change out of corner panels, install sofa panels, change out of super re-heats and change out of
economizer panels.
* Bull rigging, panel fitting and iron working.
* Working with other companies in close capacity.
Journeyman/ Rigger/ Lead Man - 2010 - 2010
Fluor Corporation, Franklin, TX
* Super heat exchange, tube lead maintenance, stop valve exchange, steam drip leg exchange,
feed water pump exchange, turbine bearing and shaft exchange, coal silo and conveyor
maintenance, install and manufacture platforms, exchange intake pumps, catalyst installation and
motors and general maintenance of 900 megawatt B&W boiler as well as 850 megawatt Alston
boiler.
* installed catalyst 3 days ahead of schedule and had B&W boiler online three weeks ahead
of schedule.
* Leadman of 8 man rigging boilermaking crew
Journeyman/ Rigger/ Boilermaker - 2009 - 2009
TEI inc, San Antonio, TX
* Change out of buckstays and all hardware of entire boiler and backpass.
* Installed tube attachments.
Journeyman/ Rigger/ Lead Man - 2009 - 2009
TEI inc, Fort Morgan, CO
* Change out of secondary re-heats, economizer division wall and condenser wall and support
backpass.
* Finished job two weeks ahead of schedule.
Journeyman/ Rigger - 2009 - 2009
CCSI, Newnan, GA
* Waterwall exchange and primary re-heat exchange.
* Erect and install skyclimber baskets, erect and install scaffold and install roller tracks to
remove and install panels
Journeyman Rigger/Boilermaker - 2008 - 2008
TEI, Inc., Denver, NC
* Waterwall Exchange, Tube leak maintenance, and main steam line repair.
* Finished 3 days ahead of scedule
Journeyman Rigger - 2008 - 2008
Fluor Corporation, Franklin, TX
* Erect 900 mw B&W boiler and 850 mw Alstom Boiler.
Journeyman Rigger/ Boiler - 2008 - 2008
TEi, Inc., Denver, NC
* Radiant re-heat exchange, complete re-build of steamdrum, general maintenace of steam
stattion, and tube leak maintenance.
* Finished one week ahead of schedule.
Journeyman Rigger - 2008 - 2008
Shaw Group, Alexandria, LA
* Erect bag house for new 350mg boiler.
Journeyman Rigger - 2007 - 2007
TEi, Inc., Tampa, FL
* waterwall exchange. v-bottom exchange, support entire backpass, and airheater exchange.
Journeyman Rigger/Boilermaker - 2007 - 2007
TEi, Inc., Mt. Pleasant, TX
* Primary and secondary super heat and primary reheat exchange.
* Finished one week ahead of schedule.
Journeyman Rigger - 2007 - 2007
LPR, Hobbs, NM
* Erection of HRSH combined cycle unit, turbin, and cooling tower system.
* Erected entire single unit in 3 months.
Rigger/Bolilermaker Top Helper - 2007 - 2007
TEi, Inc., Hugo, OK
* Primary and secondary superheat exchange, primary reheat exchange, and burner replacement.
Rigger/ Boliermaker Top Helper - 2007 - 2007
Tei, Inc., Free Port, Texas
* General Maintenance on HRSG gas unit
Rigger/Boilermaker Helper - 2006 - 2006
TEi, Inc., Salisbury, NC
* Installation of ammonia injection system.
Rigger/Boliermaker Helper - 2006 - 2006
TEi, Inc., Free Port, Texas
* Tube Bundle replacement and catalyst istallation on HRSG unit
EDUCATION
H.S., Diploma - 2004
Corrigan-Camden, Corrigan, TX
SKILLS
* Rigging: Flagging Cranes, Flagging tuggers, stran-jack systems, bull rigging, and heavy
transportation.
* Boliermaking: Tube and tube panel fitting, buckstay installation, skin casing fitting, and
airheater fitting
* Pipe Fitting: Fit Pipe and Valves
* Millwright: Removal and installation of turbine bearings, maintenance on airheater bearing,
removal and installation of stop valves, and removal and installation of rv valves
* Leadership: Leadman on two jobs and boilermaking and rigging crews