Daniel L. Smith
**** ******** *****, *****, ** **074
cell: 814-***-****
Qualifications
1. Manage Oracle EBS projects, implementations, and support
2. Manage internal business analysts and external contractors
3. Provide leadership in defining business requirements, process
improvement, and engineering
Employment
Director of Operations Systems September 2008 to date - DRS
Technologies, Johnstown, PA
Managed a team of internal business analysts, database administrators, and
external contractors
4. Managed technical team of external contractors in planning and
implementing software and hardware upgrades to improve system performance
and eliminated crashes and down time
5. Upgrade to 10.2.0.4 database, upgrade to EBS 12.0.6 Application
6. Switch OS from UNIX to Linux and move to SAN disc storage
7. Formalized instance cloning, backups and maintenance
8. Setup Oracle BI and Discoverer reporting
9. Managed internal business analysts in planning and testing upgrades, and
implementing enhancements
10. Identified and fixed data corruption from conversion
11. Coordinated with Oracle support to resolve significant coding errors in
Contracts, ASCP, Receiving, Check Printing and WMS
12. Automated Item, BOM and Routing load and maintenance for the build to
print operations, reducing lead time to five days. Extended Oracle ECO
and document control.
13. Reduced backlogs in AP, AR, and receiving, and identified $1.2M in
excess inventory
14. Coordinated internal and external resources in prioritizing business
requirements and working together to achieve results
15. Managed the development of training and training materials (UPK)
IT Project Manager September 2002 to July 2008 - Atrium
Companies Inc., Dallas, TX
Managed a team of Internal Business Analysts and external contractors
16. Oracle 11i implementation of GL, AR, AP, OM, PO, WMS nation wide.
17. Implemented 12 divisions in 12 months from four different ERP
platforms.
18. Created interface files for data loads, planning BOM's for forecasting,
costing, and inventory control.
19. Created FSG reports for sales, accounting, and finance in a multi-org
environment.
20. Facilitated inventory reductions in Dallas of $1M and over $200K in
Phoenix.
Oracle 11i Project Manager January 2001 to July 2002 - Alcatel USA,
Plano, Texas
21. Managed 15 operations team leads for ERP conversion from Oracle 10g to
Oracle 11i.
22. Multi-org accounting structure
23. BOM conversions
24. Interface Oracle with manufacturing equipment
25. Coordinated with external contractors and internal IT department to
insure business requirements were met
Industrial Engineering Supervisor March 1994 to January 2001 - Alcatel USA,
Plano, Texas
26. Facilitated the ERP conversion from various platforms (ARMs, Digitrac,
Copics) to Oracle 10g
27. Created multi-level metrics to manage operations and focus on direct
costing
28. Developed Capacity Plan reporting
29. Demonstrated an equipment imbalance in SMT production resulting in a
50% increase in productivity
30. Facilitated Inventory Control Team in process improvement and cost
reduction of over $2M.
31. Resolved $8M material variance in material issues
32. Managed Oracle labor cost revisions for quarterly and annual operating
plans.
Senior Industrial Engineer October 1988 to March 1994 - Vought
Aircraft, Grand Prarie, TX
1. Facilitated ERP implementation of MACPAC-D MRP II manufacturing program.
2. Facilitated the implementation of Integrated Manufacturing Process
Methodology Program.
3. Developed time standards (MOST) for machining, sheet metal fabrication,
composite construction and paint and processing.
Education
1988 University of Texas at Arlington, Arlington, Texas
Bachelor of Science - Industrial Engineering
33. Member Alpha Pi Mu, APICS and IIE