Post Job Free
Sign in

Project Management

Location:
Honolulu, HI, 96815
Posted:
August 11, 2011

Contact this candidate

Resume:

BIRGIT R. ROSS

*** *** **** *** #***

Honolulu, Hawaii 96815

480-***-**** (C)

e-mail: ******.****@***.***

CAREER SUMMARY

A seasoned professional responsible for project scheduling, project cost

control, finance, estimating and production inventory control positions

within the semiconductor, manufacturing and environmental industries. In-

depth knowledge of Primavera 6.0 Version 7.0 Project Management,

PrimeContract, Oracle, Access, Versapro, Microsoft XP ( Excel, Word,

PowerPoint). Highly dependable and well organized. Excellent communicator

with solid work ethic. Fluent in German (native) and French.

PROFESSIONAL EXPERIENCE

NAVFAC PACIFIC, Pearl Harbor, Hawaii; May 2010 - Present

MOCA Systems, Contractor to the US Navy for Joint Guam Program Office

Senior Project Scheduler

. Lead the program efforts for the Military Relocation for US Marines

from Okinawa, Japan to the Island of Guam and assume responsibilities

for controlling and reporting schedule and budget performance.

. Develop and implement integrated planning, cost, and schedule tools

(using Primavera P6 version 7.0), techniques, and methods for

monitoring, measuring, controlling, and reporting planning

programming, design, and construction progress and performance.

. Ensure the proper definition and integration of scope, schedule cost,

risk, and resources to enable the measurement of scope, schedule, and

budget performance at various levels during project implementation

phases.

. Provide schedules, reports, and dashboards to leadership (Admirals

for the US Navy and Marines), US Congress, as well as Capital Hill for

funding requests.

. Develop and implement baseline schedules ensuring the full

integration of scope, schedule, costs, risk, and resources.

TDC, IDC, TriMega, Currie & Brown, SDB @ Intel Corporation; September, 1993

- April 2010

Construction Contractor for Semiconductor Facilities in New Mexico (USA),

$1 Billion Plant Expansion (Phase 1 and II); Oregon and Arizona (USA)

[Phase I, II, Expansion and Conversion - Tool Installation); Fab24, Fab24-2

Leixlip Ireland, and Fab32 Arizona (PSSS System Installation); iM Flash

Technologies Lehi, Utah (Basebuild).

Senior Project Scheduler

. Responsible for development and maintenance of project master

schedules (utilizing Primavera P3e, 4.1 & 5.0 Project Management),

including uploading and integration of schedules prepared by

contractors and others. Activities include creation of Work Breakdown

Structures (WBS), and development of schedule and budget data

(including resource loading) for those WBS elements. Collect,

interpret and input schedule data into the project control database

and provide output to the project team.

. Preparation of status reports and other related project planning and

control documentation. Interface with the project technical staff to

define need for change to schedules and identification of variances

from the original plan.

. Prepared time impact analyses to assist project team in analyzing

contractor's schedules, change requests and claims. Recommended

actions to avoid delay and other undesirable schedule and cost

impacts. Produced technical documentation to assist in claims

avoidance, mitigation and resolution.

. Maintenance and updates of multiple (2-6) project schedules, to

produce monthly project status reports including earned value

analysis, to provide sound planning recommendations and guidance from

project inception to final delivery. As well as weekly schedule

progress site walk-through with the Customer.

EBASCO ENVIRONMENTAL, Inc., Santa Fe, NM, April - September, 1993

Cost Schedule Engineer

Responsible for project controls support to Los Alamos National

Laboratory. Responsibilities included project scheduling, cost tracking,

and monthly reporting of all activities.

. Prepared Five-Year-Plan (FY94 - FY99) baseline for Los Alamos

National Laboratory's Waste Management

Group to request funding from the Department of Energy (DOE)

for the next five years. Baseline included

Work Breakdown Structure (WBS), WBS Dictionary, Schedules and

Milestone Logs, Baseline Crosswalks,

and Estimates.

. Provided updated projections, monthly analyses and reports of

cost and schedule based upon project milestones,

Project completion dates and project budget accomplished

using the Cost/Schedule Control System Criteria

(C/SCSC) established by the Department of Energy (DOE).

CHEMICAL WASTE MANAGEMENT, INC., Columbia, SC, 1991 - 1993

Nuclear Waste Division of Waste Management, Inc., largest

international waste disposal company.

Project Controls Specialist

Responsible for control of costs and schedules associated with

conduct of projects for government and commercial

Customers. Implemented and maintained the Project Management

System for assigned projects.

. Effectively forecasted and managed budget for $1 million

Department of Defense (DOD) project that was\ completed on

schedule and under budget.

. Created and utilized computer spreadsheets to enable 98%

accuracy in projecting daily costs and allocating\` resources.

. Reduced bid processing time for award of $3.2 million project

from normal three months to two weeks through application of strong

technical skills and high level persistence.

. Monitored costs during temporary period of project

demobilization, which contributed to minimizing

unnecessary client expenses.

All above projects included the following:

- Roadmap Methodology Documentation (ERWM).

- Development of Work Breakdown Structure (WBS) & WBS

Dictionaries.

- Development and maintenance of baseline.

- Tracking budgets (costs) and schedules.

- Identifying problem areas (Variance Analyses).

- Perform change control to Performance Measurement Baseline

(PMB).

EDUCATIONAL/TECHNICAL TRAINING

University of South Carolina, Columbia, SC; Accounting, 1983 - 1987

FAS SAFEPASS (European Safety Standard Course - Construction Industry)

Materials Requirements Planning (MRPII), Just-In-Time (JIT) Management

Total Quality System (TQS) Seminar, DIALOG (on-lone Research) Seminars,

Expanded Management Systems (EMS), 40-Hour OSHA - Hazardous Waste Workers

Training

PROFESSIONAL AFFILIATIONS

American Association of Cost Engineers (AACE), 1991 - Present

American Production and Inventory Control Society (APICS), 1989 - Present

American Management Association (AMA), 1987 - Present

Project Management Institute (PMI), 1991 - Present



Contact this candidate