Sunitha B Bentur
Union City CA 94587
(Cell) 510-***-****, email: *********.**@*****.***
Summary
More than 4 years of experience in Manual testing of various applications
across different domains in Software Industry.
Skill Sets
Operating Systems: Vxworks AE653 and Windows 95/98/NT/XP
Languages: C, SQL
Protocols and other Components: RS 232, AFDX, GPM (PowerPC 7448) and SBC
(750gx) of Smiths Aerospace.
Major Applications: Boeing 787 HYDIF, CCH
Defect Tracking Configuration Tools: MKS, PVCS, DOORS and TFS
Professional Summary
Testing for 'V' and Agile/scrum methodologies, Black Box Testing, Grey Box
Testing, Verification and Validation, Integration Testing, Configuration
Management, Leading a Team, Debugging issues
Educational Details
Completed BE in Telecommunication Engineering from Vishveswaraiah
Technological University, Karnataka, India, in the year 2005 with an
aggregate of 67%.
Professional Experience
Project: CCH-AUT DevTest
Client : Commerce Clearing House (A Wolter Kluwer
Business), USA.
Platform : ASP.NET, C#, SQL Server 2005 & 2008.
Operating System : Windows XP
SDLC : Agile/Scrum Model
Duration : April 2010 - December 2010
Description:
Commerce Clearing House [CCH] is a Wolter Kluwer Business which deals
with US taxation. It provides technology based solutions/services and
support to tax and accounting professionals in North America. It handles
Individual, Corporation, Small Corporation, Partnership tax returns. Next
Generation Pfx.Net is .NET 3.5 based products to replace the foundation
product. It has major sub products like FAM, TAX, Practice, Workstream and
Document.
CCH-MAN-Data Migration project deals with data migration from legacy
to Next Gen application. We are testing 2 main products i.e. Tax &
Practice. Main goal is to test all the new enhancements i.e. user stories,
write & execute test cases and perform regression testing.
CCH-AUT-BillingPlugin is DevTest project. In this project major focus
is on finding out all P1 & P2 bugs before code gets checked in to TFS. The
ultimate aim is to reduce the bug life cycle time and hence the software
development time.
Role:
. Understanding and preparing test scenarios for the user stories and
sprint backlog defined for each sprint iteration.
. Testing new features developed in agile and scrum methodology.
. Updates to scrum master in scrum meeting on daily basis.
. Ensuring that the defects logged are re-tested and closed for every
user story in the sprint iteration.
. Reviewing test scenarios prepared by team.
. Review of project artifacts, Status reporting, RADAR monitoring.
. Test Environment setup & resolving technical queries.
. Communicating with developer regarding the enhancement and issues
faced by team in day to day activities.
. Responsible for configuration management.
. Bug reporting & tracking through TFS. Tracking testing tasks through
Rally.
. Defect retesting and regression testing for modules: Other Practice
Processes, Workstream & Reports
Project: Testing (Verification & Validation) Boeing 787 HYDIF
Client : Parker Hannifin Corporation, MI, USA
Platform : Embedded C/Tornado
Hardware : GPM 300, SBC750GX
SDLC : V-Model
Duration : March 2006 - August 2009
Description:
HYDIF-Hydraulic Interface Function Software is a hosted software
application on the Boeing 787 Common Core Systems (CCS).
HYDIF provides hydraulics control and indication interfaces as well as
maintenance functions for the 787 Hydraulics Systems. This Application uses
AE653 interfaces and A664 protocol for data transmission and uses C
language for the software development.
In addition, HYDIF supports the Onboard Health Management Function.
HYDIF will be one of the partitions of the AE653 VXWORKS RTOS running on
one of the GPMs (General Processing Module). A General Processing Module is
a single board computer based on PPC 7447A and will be part of Common Core
System. The scope of the project is requirements verification, design,
coding and testing of HYDIF software.
HYDIF comprises of following functional areas.
. Power Up
. Input Signal Management(ISM)
. Control Functions
. Health Management Fault Reports
. Indication Function
. Output signal Management(OSM)
. Power Down
Role:
. Reviewing Requirements, analysis and design.
. Preparing Test designs, developing Test cases, Test Procedure and Test
files for Control, Indication, Fault Report, ISM (Input Signal
Module), OSM, Power Up, Power Down and Executive Functional Area of
HYDIF and executing them on the SBC (IBM Power PC 750gx) and
GPM (ARINC 615).
. Preparing environments for testing the application.
. Hardware/Software Integration Testing
. Data Coupling / Control Coupling Analysis
. Issue logging, tracking and reporting
. Client communication (Email/Conf call etc)
. Configuration Management in the Project.
. Assigning test suites to team member and keep track on execution to
meet the deadline.
. Providing release notes to the documentation team.
. Preparing 'Test Summary Report' and carry out some wrap up tasks after
a version is released.