Post Job Free
Sign in

Mechanical Project Manager

Location:
San Jose, CA, 95150
Posted:
August 17, 2011

Contact this candidate

Resume:

JOEL D. BRATMAN

P.O. BOX ****

SAN JOSE, CA *5150

408-***-****

*******@*****.***

TEST ENGINEER / PROJECT MANAGER - MECHANICAL DESIGN & COMPUTER NETWORKING

Performance-driven test engineering professional known for excellent

research, investigative & communication skills. Resourceful and detail

oriented with extensive experience in many technical fields and an

outstanding aptitude for managing & prioritizing multiple priorities. Team

player & very people oriented. Extensive familiarity with computer

networking, commercial & military satellite & wireless communication

industries. Highly proficient with project management, team leadership,

computer networking prototype development, mechanical test & stress

screening, satellite test & integration and software quality assurance.

Held a DoD secret clearance on multiple occasions. Additional expertise

includes environmental/reliability testing, acoustics, RF systems testing &

troubleshooting, high-reliability hardware testing, quality control,

antenna mapping and statistical analysis.

TECHNICAL & MANAGEMENT SKILLS

Environmental: HALT/HASS/ESS Testing; Thermal Test & Analysis;

Vacuum Chambers; Random Vibration; Shock Testing; NEBS

Compliance testing; Acoustics; Airflow Testing;

Thermocouples; Accelerometers

Mechanical: Satellite Mechanical Operations; Failure Analysis; Cross

Sectioning; Mechanical Measurements; Mechanical Assembly;

Machining Equipment; Power Tools; Visio 6.0; SDRC I-DEAS

3D modeling and drafting

Computer Networking: Router/Switch IOS & diagnostics; Autotest

scripts; Prototypes; LAN layout & configuration; FPGA

programming; power sequencer programming; software &

firmware upgrades; mechanical test & analysis

Project Management: Scheduling; Personnel Supervision & Training;

Procurement; Equipment Calibration; Quality Control

Computer & Office: Windows; Macintosh; Adobe Photoshop; Microsoft

Excel, Word, PowerPoint, Publisher; Statistical Analysis;

HTML; UNIX; Accomplished Photographer

Electrical: Satellite Electrical Operations; RF systems; Satellite In-

Orbit Test; Component & System Level Testing; Wiring

diagrams & schematics; Cable routing & layout; RF Link

Analysis;

Test Equipment: Lansmont & Ling Vibration Systems; Tenney,

Cincinnati & Environtronics thermal chambers; Spectrum

Analyzers; Network Analyzers; Signal Generators; Power

Supplies; Oscilloscopes; Agilent & Fluke data loggers;

Dactron Control System; PC based automated test

equipment; Antenna Control Systems

PROFESSIONAL EXPERIENCE

TEST ENGINEER - PROTOTYPE SERVICES / MECHANICAL DESIGN

2006 - 2011

Cisco Systems, San Jose, CA

Oversaw receipt, inspection, tracking, software/firmware upgrades to ensure

high quality prototype routers, switches & modules were delivered to

multiple engineering teams in a timely manner. Led technical team in

prototype services group, providing training & guidance to ensure

priorities were met. Created, modified & reviewed procedures for both

prototype services and mechanical device verification test. Coordinated,

prioritized & scheduled mechanical, environmental & acoustic testing for

networking hardware. Participated in cross-functional prototype

development meetings, providing input on all quality and scheduling issues.

Prioritized workflow for large quantities of prototype units to meet

engineering schedules.

. Performed acoustic testing to ISO 7779 standards on networking

hardware for NEBS compliance testing

. Performed mechanical & environmental stress testing (random

vibration, shock testing, thermal testing, humidity, altitude) to

IEC and MIL-STD-810 standards on networking hardware for NEBS

compliance testing

. Managed and prioritized workflow in and out of Proto Services lab to

meet program scheduling requirements

. Developed method to process large quantities of prototype units

which improved turnaround time by 50%

. Configured IP addressing for data and voice communication between

multiple routers & switches in local area networks

. Wrote & modified IOS configurations to provide support to test

engineers for both prototype services & mechanical test

. Provided software, firmware & hardware upgrade services on routers &

switches to multiple engineering groups

. Debugged software & mechanical failures/errors to minimize the

amount of time for products to reach engineering release

. Created test procedures, which eased the transition of work.

. Developed training programs for inventory tracking, autoscript test,

rommon, IOS & diagnostics

LAB MANAGER - ENVIRONMENTAL STRESS SCREENING (ESS)

2005-2006

Akon Inc., San Jose, CA

Responsible for all ESS testing of microwave subsystems. Testing included

random vibration, mechanical shock, thermal shock and temperature cycling.

Supervised, trained and wrote reviews for technicians in ESS lab.

Developed lab coverage schedules. Met with customers to discuss & resolve

ESS issues. Developed proposals for continuous quality improvement.

Routinely conducted multiple tests at once. Maintained ESS equipment.

Wrote product test procedures and compiled statistics of test results.

. Interfaced with project engineers to set up priorities and schedules

for ESS testing, resulting in quick turnaround times

. Communicated with vendors to facilitate the set up of new equipment

. Managed and tracked workflow in and out of ESS lab

. Maintained large database which covered all ESS testing

. Programmed equipment for 24 hour use

PLATFORM PHYSICALS LAB TESTER (contract assignment - 5 months)

2005

Intel, Hillsboro, OR

Worked in research & development group to develop optimal acoustics of

computer hardware. Managed and carried out acoustic and airflow tests on

desktop and laptop hardware. Developed acoustics testing methodology for

product test validation. Created extensive spreadsheets and performed

statistical analysis of data. Provided amplitude, tonality, loudness,

sharpness and roughness data for acoustic tests under a variety of

parameters.

. Used HEAD ArtemiS and HEAD Online Analyzer to achieve reliable

acoustic data

. Performed sound pressure, sound power and binaural tests to ISO

standards

. Designed and laid out acoustics test setups, which included

precision positioning of microphones

. Performed regular calibration of Br el & Kj r microphones

. Utilized acoustic cell in Intel's Corporate Certification and

Environmental Labs

. Interfaced with other departments to ensure proper assembly of

flight compatible cables

ELECTRONIC INTEGRATION & TEST TECHNICIAN (term assignment - 4 months)

2004

Stanford Linear Accelerator Center, Menlo Park, CA

Team member of Gamma Ray Large Area Telescope Integration & Test group;

Maintained and updated multiple databases of EGSE cables for I&T test;

Performed electrical tests on engineering models of high reliability flight

hardware

. Procured large variety of flight compatible cable subcomponents from

outside vendors

. Designed and laid out test setups

. Reviewed and modified test procedures

. Interfaced with other departments to ensure proper assembly of

flight compatible cables

SENIOR TECHNICAL ASSISTANT (contract assignment - 3 months)

2003

Northrop Grumman Marine Systems, Sunnyvale, CA

Team member of Reliability Engineering Electrical group; Responsible for

test and analysis of electrical hardware for Trident II tactical

subsystems; Performed failure analysis to component level

. Designed and built test fixtures and test consoles

. Interfaced with other departments to ensure proper repair and

documentation of tactical hardware

. Conducted surveillance testing of Trident II firing units and launch

safing units

. Tracked and controlled lab budget, including procurement of tools &

supplies

. Updated and helped maintain large database of surveillance test data

SR. MECHANICAL ENGINEERING ASSOCIATE / LAB MANAGER

2001-2002

Spectrian, Inc., Sunnyvale, CA (Acquired by REMEC, Milpitas, CA)

Managed all activities in mechanical engineering laboratory for product

development of power amplifiers for wireless base stations; Performed

airflow and thermal tests on power amplifiers, which included layout and

installation of thermocouples, design of RF test setups and complete data

analysis; Wrote and reviewed lab test procedures

. Provided mechanical engineering support to Quality Assurance for

HALT, HASS & ESS reliability testing

. Maintained database for calibration of lab equipment

. Increased reliability by developing a method of affixing

thermocouples for vibration testing

. Interfaced between various departments to ensure that testing

requirements were met

. Provided thermal imaging support company wide

. Conducted training for engineers on the use of airflow equipment and

thermal imaging software and hardware

. Performed ESD surveys on test stations to ensure ESD requirements

were met

. Trained as an ISO 9000 & TL 9000 internal auditor

TEST SUPPORT MECHANIC / SATELLITE TEST & INTEGRATION TECHNICIAN

1998 - 2001

Lockheed Martin Missiles & Space, Sunnyvale, CA

Performed electrical & mechanical tests on multi-million dollar satellites

& other high-reliability hardware in class 100K & 10K clean rooms for

commercial & military programs; Ensured tests were done to military

standards (mil-std). Made preparations and performed tests for thermal

vacuum, acoustics, random vibration, and temperature & humidity cycling;

Possessed a DoD Secret Clearance

. Worked in the field at launch base performing launch preps for high-

reliability flight hardware

. Performed static load tests of mechanical devices, which included

assembling large steel structures

. Designed electrical test setups and performed tests on electronic

systems and components

. Prepared discrepancy reports and reviewed test procedures for

acceptance

. Conducted training of incoming technicians and gave tours of work

area to visitors

SATELLITE TEST TECHNICIAN (contract assignment - 6 months)

1997

Space Systems/Loral, Mountain View, CA

Worked in the field internationally and domestically at remote ground

stations performing in-orbit-tests of communications satellites. Created

test reports, which included antenna characterization. Set up test

consoles, routed cables and performed certification of calibration on test

equipment used in the field for in-orbit-test.

. Maintained entire inventory of all in-orbit-test equipment and

systems.

. Performed RF link analysis to determine power levels present at

ground stations and at satellite being tested. Set up networking

equipment, routed associated cables and tested network at remote

ground stations.

. Created numerous drawings and schematics for various ground control

systems.

. Wrote and reviewed segments of UNIX based automated test programs.

OTHER PROFESSIONAL EXPERIENCE

INSTALLATION TECHNICIAN (contract assignment) - Stanford Linear Accelerator

Center 1995 - 1997

TEST & INTEGRATION TECHNICIAN (contract assignment) - Space Systems Loral,

Palo Alto, CA 1993 - 1994

SPACE LABORATORY TECHNICIAN - Lockheed Missiles & Space Co., Sunnyvale, CA

1989 - 1992

EDUCATION

CISCO Engineering Education - IOS Configuration; Networking skills; CCNA

Certificate of Completion in Business Administration, De Anza College,

Cupertino, CA

Other coursework at De Anza includes Statistics, Electronics, Computer

Science and Speech classes.

Graduated from Microwave Training Institute, Mountain View, CA

Joel Bratman - 408-***-**** - Page 2

Joel Bratman - 408-***-**** - Page 3



Contact this candidate