Vincent Ivory
Oceanside, California 92057
Email: *******.*****@*****.***
Phone: 760-***-****
Qualifications
Extensive experience in Hardware and Software Configuration Management and
Data and Version Control Management, QA Documentation, Quality Systems
Control, Manufacturing Documentation Process Improvements within the
Commercial, Military, Medical Manufacturing and Engineering Industries.
Agile 9.2.2 PDM/PLM Java/Web Clients (Administrator/Analyst)
Oracle R12 (ERP)
MatrixOne PDM/PLM (PLM/Hardware CM)
Rational ClearCase (SCM Administration)
Dimensions PVCS (SCM Administration)
Ask (ManMan) (PLM/Hardware CM)
Unix Development (Software CM)
MS Office Suite of Software
MS Front Page (Web Development)
Share Point
Documentum (EDCS)
Knowledge of cGMP/FDA requirements - ISO 9000 -9002
TopVue (DoD Data Management)
Education
Metropolitan Community College, Omaha, Nebraska (1980-81), Mira Costa
Community College, Oceanside, Ca (1988), San Diego State School of Extended
Studies (Business 1988), Personnel Management School CMII Certification
2000, ITAR Certification 2009
Employment History
L-3 Services (Dept of Defense, JTRS Program)) - (04/09 - Present)
Data/Configuration Manager (Secret Clearance),
Responsible for the accuracy, distribution and maintenance of media to
various database repositories for JTRS NED-N. Also, for establishing
process necessary to maintain the integrity of managed media and enforcing
access restrictions as applicable.
Reviewed documents for appropriate markings, classification, etc. and track
the document via the documents assigned identification (ID) number.
Assured external documents (Final or Updated version) were delivered to
JTRS Acquisitions CM for acceptance. Verified document submittal to JTRS
Acquisitions has full data regarding final approval signature matrix,
release authority, and final delivery contact information.
Pulled/uploaded NED-N CDRL's to/from CDRL Database Repository (e.g., GMR
CDRL DB (MARS) (ITT), TopVue NED CDRLVue, JPEO JTRS Information Repository
(IR).
Review document deliveries for both administrative and technical accuracy
and completeness.
Managed DOORS requirements and coordinate documentation formatting an
content with contractors.
Distributed CDRL deliverables to the Assistant Product Manager (AdPM) for
CDRL review and delivery to Review Team and any issues found within the
delivery.
Uploaded AdPM approved Review Team comments to CDRL database Repository.
Coordinate with the AdPM, to ensure issues are resolved (AdPM) acted as a
liaison between the Software Product Developer and Content Manager).
Reported new significant issues and open issues at the product PMR
briefings until resolved.
Reviewed software code deliveries for both administrative and technical
accuracy and completeness.
Posted Source Code CDRL/SVD and associated document(s) to the IR "drop zone
in conjunction with sending same to NED-N T&E Team for functional builds
(IR only does build to see if it can be compiled).
For Source Code/SVD: ensured that the delivery was complete (no missing
source or build files.), review the SVD and attempt to build the Source
Code, based on the instructions provided, in conjunction with NED-N T&E
team and IR.
Inform the APdM of all issues found by the IR.
Meggitt Air Dynamics - (12/08 - 04/09) Configuration Management Analyst
Responsibilities: Administration and installation of the configuration
management tools and assisted developers PVCS Dimensions tool issues,
version control of all company software. Maintained the company software CM
status accounting records. Analyzed software changes for impacts to final
product and software drawing parts list and corrected various source code
in conjunction with system test to ensure accurate executables.
Tested and verified software for production release in accordance with
established SCM processes using software description documents. Checking
in/out, merging, branching and release of source code to control in
accordance with Software development lifecycle.
Established new SCM lifecycle processes for software releases for aircraft
components.
Cisco Systems - (12/07 - 12/08) Configuration Management Analyst II,
I was responsible for the company's CM/Product Lifecycle Management process
definition. Administration of the company's Agile PLM tool. Creating
company SOPs for use in engineering and operations according to ISO 9000
standards. Responsible for coordination and facilitation of my project's
Change Control Board. Created processes related to documentation release in
PDM and MRP systems. BOM structuring for component parts and PCB's and
accurately structured component level through TLA BOM hierarchy. Accurate
structuring of engineering changes/deviations to accurately describe the
product changes being introduced. Researched procurement of component parts
for component purchasing, written ECO/MCO for new product introduction and
validated test documents for accuracy before release to production.
Accomplished verification processes to accurately assign part numbers for
BOM entries, reviews and approvals for proposed design modifications.
Maintained configuration status accounting records in accordance to the
company's best operating practices. I defined the AML process to allow
identification and validation of qualified manufacturers for parts
procurement. I coordinated Integrated Product Team meetings, Production
Readiness Reviews, audits as required and implemented document change
policies based on customer feedback and in collaboration with ODM and JDM
partners to define product definitions. I drafted changes for new product
introduction, creation and maintenance of the CM AML process. Created and
modified cost data in Oracle ERP. I implemented and trained employees in
the initial CM operation processes. I analyzed released engineering change
data and coordinated changes with engineering, quality, operations, program
management, and data control. I created operating procedures in the use of
the ERP tool. Provided training to engineering, program management,
operations and peers in the implementation of PLM and MRP. I worked in
collaboration with the pricing team to accurately enter sales data using
Oracle.
DotHill Corp - (09/05 - 11/07) Agile Configuration Management Analyst, CAD
Supervisor,
Responsibilities: Administration of the Agile PLM tool. BOM structuring
for component parts and PCBs, processing ECOs. Creating ECOs, Deviations,
MCOs for new product launches. Chaired change control board meetings,
assigned part numbers for CM database, maintaining configuration status
accounting records, drawing management checking to ensure Solidworks
drawings were in coordination with bills of materials and parts lists.
Created and validated manufactures/vendors to ensure RoHS and WEEE
compliance.
Pulse Engineering - (10/03 - 10/05) Configuration Manager,
Responsibilities: BOM structuring for component parts and PCB's in PDM. I
used eMatrix to generate ECOS/Deviations. Procurement of component parts
for purchasing, writing ECOs for new product introduction, assigning part
numbers for BOM entry, maintaining configuration VOB management, status
accounting records, coordinating/chairing ECO board meetings, drawing
checking to ensure drawings were in coordination with bills of materials
and parts lists.
Validated manufactures to ensure RoHS and WEEE compliance.
Cubic Corporation - (1/97 - 10/03) Software Configuration Management
Analyst,
Responsibilities: Administration and installation of the configuration
management tools and assisted developers resolve Clearcase and PVCS tool
issues, VOB management and version control of all company software.
Maintained the company software CM status accounting records. Analyzed
software changes for impacts to final product and software drawing parts
list and corrected various source code in conjunction with system test to
ensure accurate executables.
Released company software by building or verification using Unix, C++,
Visual Basic applications. Tested and verified software for production
release in accordance with established SCM processes using version
description documents. Checking in/out, merging, branching and release of
source code to control in accordance with Software development lifecycle.
Processed Web/HTML files for intranet document changes and versioned
baseline code.
Acted as SCM representative for multiple projects and chaired CCB meetings.
Trained personnel in the use SCM tools for software versioning and revision
control. Use SCM tool to perform basic administrative duties and establish
new projects and log files. Used the DOORS application to manage company
documents and update work instructions to reflect actual processes.
Acting software librarian to maintain and organize software media archives
in both electronic and hard media formats (COTS). Written, implemented and
organized software build and release procedures and coordinated periodic
configuration auditing to track software testing results and closures.
Established new software document release processes by creation of a
software drawing process to allow structure to TLA final product.
Sr. Design Corp (Contract) - Applied Digital Access (1/96-12/96)
Configuration Manager,
My responsibilities: BOM structuring/entry, Generating ECOS/DCN'S.
Procurement of component parts for purchasing, writing ECOs for new product
introduction, assigning part numbers for BOM entry, coordinating/chairing
ECO board meetings, drawing checking to ensure drawings were in
coordination with bills of materials and parts lists.
Nations Inc. Military Contractor - (9/94-12/95) Fielding Configuration
Management Specialist,
I controlled hardware and military firmware data as well as part number
tracking for various military components within the computerized Sincgars
database. I coordinated Part Number configuration for communications
equipment and installation for military encrypted communication devices.
Molecular Biosystems (Medical Device) - (10/93-8/94) Configuration
Management Analyst,
I was responsible for bill of material structuring, document tracking, SOP
creation, part number management, database management and coordination of
eco generated documents, forms and drawings, crated tracking system for lot
packages/lot forms to meet cGMP/FDA standards.
Puritan Bennett Corp. (Medical Device) - (1988-1992) Configuration
Manager,
I assisted in the initiated the JIT Manufacturing process as it related to
the conversion of manufacturing documentation - Operation Sheets (written
instructions) to pictorials (exploded views). Performed time and motion
studies to help balance production lines and enter new part numbers,
structure new BOM's. Developed division wide part number system to more
effectively track and control part number issuance between engineering,
documentation control, and manufacturing. Incorporated basic engineering
changes to convert processes or parts used in production for the
Engineering Change Board. Member of the Malcolm Baldridge Quality Audit
Team.
Military Service
U.S. Marines (1988) E-5 (Honorable Discharge) Camp Pendleton, Ca.
I performed duties as a USMC Supply Administrative Chief in charge of
logistics and inventory accounting. I accounted for Marine Corps assets as
they related to military property and weapons. I accounted for 30 million
dollars of Marine Corps property. Performed functions as a personnel
manager, which included maintenance of personnel files, processing of
personnel administrative matters.
Personal Strengths
I am a responsible and dedicated person who derives job satisfaction by
providing quality work and service to those whom I work for and a team
player to those I work with.
* Enjoys facing new challenges, organized and attentive to details.
* Always willing to take on new responsibilities.
* Quickly learns and applies new techniques.
* Willing to listen to and share new ideas.
* A team player.
Professional References:
Bart Farrell (L-3 Corporation) Program Manager - 619-***-****
****.*******@*-****.***
Sabir Sadiq (Cisco Systems) Operations Manager - 949-***-****
Frank Parkinson (Meggitt Controls Systems) Engineering Manager - 951-734-
0070 (Operator)
Cmdr Mark Kempf (DoD JTRS-NED-N) Deputy Program Manager - 619-***-****
****.*****@****.***
Dan Preissman (DoD JTRS NED-N)A- Deputy Program Manager - 619-***-****