JERRY W. ROSE
[pic]
*** ********* *****, ****, ** 37615
********@*******.***
423-***-**** - Home 423-***-**** - Cell
PROFESSIONAL PROFILE
Proven performer in diverse manufacturing environments, achieving
excellent results by combining leadership ability and engineering
principles.
PROFESSIONAL EXPERIENCE
Industrial/Process Engineer
July 2006 to
April 2009
ARBORCRAFT FLOORS, Johnson City, TN
. Primary engineer for Sample and Molding Departments, leading Six
Sigma projects and Kaizen
events that resulted in significant improvements and cost
savings:
. Reduced color off complaints by 1 sigma resulting in over
130K savings during first year
. Increased productivity from an average of 50 ft molding/labor
hr to over 95 ft/labor hour
through process improvements, 5S, and employee awareness
. Installed KanBan system for handboard assembly in the Samples
Department
. Implemented a system to recover "A" grade material
. Developed improved method of stain application
. Eliminated build-up on bevel coating
. Project manager for CARB Certification Program, successfully
obtaining CARB Phase 1 Certification for
formaldehyde emissions of engineered product sold in California
. Established color standards for each SKU using color
spectrometer and control charts and trained
operators to use the meter and charts
Senior Industrial Engineer/Technical Writer
September 2005 to February 2006
AEROTEK ENGINEERING SERVICES, Knoxville, TN
(Temporary Contract)
Bosch Brakes, Johnson City, TN
. Provided contract industrial engineering support for a variety
of projects, including technical writing,
asset management, time studies and labor analysis
. Developed standardized operator instructions for machine
operators
. Performed fixed asset inventory which enabled the write-off of
over $11 Million in fixed assets saving over $1
Million in tax costs
. Analyzed tow motor utilization, recommended changes to improve
safety and efficiency, and reduce
clutter
Senior Industrial Engineer/Methods & Standards Team Manager
May 2003 to April 2005
SIEMENS ENERGY & AUTOMATION (now EPIC Technologies) Johnson City, TN
. Directed, mentored, and set priorities for members of the
Standards Team
. Maintained constructive relationships with other departments,
exchanging information necessary to develop
standards and provide quotes to service the customers of the
Industrial Engineering Department
. Administrated and maintained, in conjunction with Information
Systems, the computer systems (EASEworks and Routing Management
System) used by the Industrial Engineering Department
. Lead a team of engineers and technicians in developing routings
for 80% of active previously unsupported standards in a
two year period by developing over 1000 standards
. Member of cross-functional team that redesigned elevator starter
assembly line and increased output 70%. Success was
achieved by implementing lean principles through improved line
layout, changing from batch to flow manufacturing, and
rebalancing the work content of the line
. Core leader on software evaluation team for purchasing and
implementing EASEworks Computerized Pre-determined time
system used to develop routings, line balancing, and provide
quotes for new assemblies
. Member of i2 Business Release and Implementation team that
successfully implemented i2 Factor Planner software
. Designed, co-developed, implemented, administrated, and helped
maintain Routing Management System that compared, analyzed,
and reported time and cost deltas between current and proposed
standards
Senior Industrial Engineer
November 1998 to
May 2003
AEROTEK ENGINEERING SERVICES, Knoxville, TN
. Siemens, Johnson City, TN - Dec 2000 to May 2003
o Industrial Engineering support to i2 BR3 and Implementation
Team
. Universal Furniture, Morristown, TN - Aug 2000 to Oct 2000
o Developed and maintained standards database
o Performed time studies for standards support
. Telex / EVI, Sevierville, TN - Aug 1999 to Aug 2000
o Developed and maintained routings and standards through
time studies
o Worked with product and design engineers to improve
manufacturability and product flow as well as
provide cost estimates on new products
. Bristol Compressors, Bristol, VA - Apr 1999 to July 1999
o Performed and analyzed time and value-added studies to
update standards database and reduce non-value
added work
. Telex EVI, Newport & Sevierville, TN - Nov 1998 to Apr 1999
o Performed time studies and developed production standards
for new and incumbent products for the Newport
speaker and Sevierville microphone plants
o Rebalanced all speaker production lines to achieve maximum
production and/or lowest cost
Industrial Engineer
April 1997 to
November 1998
EXIDE CORPORATION, Bristol, TN
. Developed routings and monitored direct and indirect labor cost
. Lead internal auditor for QS-9000 process
Technical Services Coordinator
September 1992 to April
1997
LEVI STRAUSS & COMPANY, Johnson City, TN
. Project management for new product lines including team and plan
layouts, new garment costing using GSD predetermined time
system, setting and reviewing production rates
. Member QIT management team, SPC core team, safety committee
EDUCATION
EAST TENNESSEE STATE UNIVERSITY, Johnson City, TN
Bachelor of Science, Manufacturing Engineering Technology
CERTIFICATION, TRAINING, AND SOFTWARE EXPERTISE
. Six Sigma Green Belt Certification
. Lean Manufacturing
. Kaizen Events
. Microsoft Project
. Ergonomics
. MiniTab (statistical analysis software)
. EASE works (Industrial Engineering pre-determined time software)
. I2 Factory Planner (Purchasing & scheduling software)