Laveen AZ, *****
************@*.***
Cary Barfield
SUMMARY OF QUALIFICATIONS:
Ÿ HVAC certification UNIVERSAL
Ÿ Installed compressors, coils, fan motors, contactors, relays, T-stats, circuit boards and have done
new installs
Ÿ Facilities repair lights, plumbing, drywall, carpet, tile, outlets, door locks, roof patching and
office equipment
Ÿ Worked on large commercial units, small chiller systems, and swamp coolers
Ÿ Handled Vendors for Large projects
Ÿ Customer service skill answering the phone, help at front desk, resolving issues
EDUCATION:
Inland Northwest HVAC, Spokane, WA
Master HVAC tech Certification, 9/99
WORK HISTORY:
Thunderbird school of Global MGMT Crothall services group Glendale, AZ
HVAC and Facilities Engineer 09/10-present
Ÿ Take care of all campus ac and do repairs on air handler for are 5 chillers on campus.
Ÿ Got bids put together for $50,000 swamp cooler project. Put bids together for $150,000 project to
replace old and broken down Ac units.
Ÿ Perform normal routine check on chiller plants 2 times a day and check in on ems systems stefa
Ÿ Repair plumbing installed new toilets, snake out drain line from 1 up to 6, drywall, lights, outlets,
chairs, parking lot issues and roof repaired
Ÿ Repair kitchen equipment smoker, table warmers, steamer, walking coolers,
Ÿ Repair large boiler for hotel
Ÿ Able to read blue prints to find old drain lines, elect panels, and water lines on property that is 85
years old
Bally Total Fitness Phoenix, AZ
HVAC and Facilities Engineer 04/04-01/10
Took care of all AC on ten building to lower the cost of them out sourcing to contractors save the
Ÿ
company $83,000 in the first year of not out sourcing business and doing it in house and doing a
preventive maintenance program in house.
Repair plumbing, drywall, lights, outlets, chairs, parking lot issues and roof repaired
Ÿ
Maintain all gym equipment tread mills, precor, benches, life fitness free motion, selector iz and
Ÿ
plate load equipment
Rebuilt steam room, installed new AC package units, Large 40 ton pool units and help replaced
Ÿ
boilers with contractors
Installed new tile around 4000 sq feet
Ÿ
Put in place new computer system and stereo for buildings
Ÿ
Gold Tech Industries Tempe, AZ
Facilities Maintenance 6/01-4/04
Took care of all AC on three buildings and maintained swamp coolers
Ÿ
Changed out pumps and motors when burned out in pump room and waste water plant
Ÿ
Installed Sameco Evaporator and 8000 gallon water tank
Ÿ
Plumed the pump room to move water quicker and easier threw the facilities
Ÿ
Maintain compressor for building
Ÿ
Built a small chiller for gold removal
Ÿ
Installed 3000 sq feet of epoxy floor
Ÿ
Installed plating tanks and hooked up all pumps and anodes
Ÿ
Handled the vendors and contractors
Ÿ
Rebuilt motors
Ÿ