EDWIN (ED) Y. SOTTEAU

*** *. ******** **** **.

Palm Springs, CA 92264-1111

310-***-****

********@****.***

EMPLOYMENT EXPERIENCE

** **** ***** ********** ** design and engineering support at various contract and direct

positions in the petrochemical, synthetic fuel, mining, and civil industries. Extensive field piping

experience.

SOTTEAU ART. (Palm Springs, California).

Ebay Sales and Construction Projects, 2009 to Present.

As an Ebay company I sold Natural History items, rocks,meteorites etc. And I worked on

Stone Mason and Garden Design Projects.

UNDER CONTRACT TO BRINDERSON ENGINEERING. (Costa Mesa, California).

Piping Designer / AutoCAD Operator, June 2008 to December 2008.

AutoCAD 2007, ISO’s, MTOs, P&IDs, and spread sheets for tie-ins & linelists. Field

work at the Exxon Mobil, Torrence refinery, to client specifications. Upstream oilfield

facilities at the Nations Petroleum, Lost Hills development, Bakersfield, California.

UNDER CONTRACT TO BOLTHOUSE FARMS. (Bakersfield, California).

Food Processing Plant.

Piping Designer / AutoCAD Operator, February 2008 to May 2008.

Worked on a project to tag & identify plant piping, field inspection and climbing, plans,

P&ID’s and ISO’s using Autocad 2007/2008 2D.

SOTTEAU ART. (Las Vegas, Nevada).

Refinery Piping & P&ID Field Inspector and Construction Projects, 1994 to 2007.

As an independent contractor, I worked on a variety of diverse jobs for insurance

adjuster, Patrick Appin. I worked for Southwest Gas, Piping & Pipeline Construction,

Nevada Power, New Power Line Construction Plans, Inspection & P&ID Field Check,

and Garden Design and Construction.

UNDER CONTRACT TO VANSON ENGINEERING COMPANY. (Anaheim, California).

Piping Designer, October 1992 to February 1993.

Projects were a gas processing plant upgrade, Long Beach, California; Texaco

Montebello Research Laboratory, Montebello, California; synthetic fuel demonstration

projects, field-walk-downs, P&ID’s and piping drawings.

UNDER CONTRACT TO PARSONS INTERNATIONAL. (Pasadena, California).

Piping Designer, November 1991 to April 1992.

Assigned to the ARAMCO Project. Duties were to produce and check piping, isometrics,

MTOs, plans and sections to ARAMCO standards for a facilities upgrade.

UNDER CONTRACT TO MOBIL OIL CORPORATION. (Torrance, California).

Piping Designer, November 1990 to June 1991.

Contributed to a variety of projects including major and minor piping layouts, P&ID field

check walk-downs, piping stress ISO’s, MTOs, and coker unit major turn-around.

UNDER CONTRACT TO STEARNS-ROGER ENGINEERING CORPORATION. (Las Vegas,

Nevada).

Piping Designer / AUDOCAD Operator, November 1988 to June 1989.

PEPCON Productions, Inc. The PEPCON Project was a fast-track project to design and

rebuild an Ammonium Perchlorate Plant (rocket fuel). Attended process review meetings

as the P&ID Coordinator and Piping Group Representative; notified the piping designers

of developments in their areas; developed, and checked P&ID’s and piping drawings.

HENSLEY SCHMIDT, INC. (Atlanta, Georgia).

Civil Drafter, March 1987 to May 1987.

Assigned to Atlanta, Georgia. Was responsible for highway construction plan and profile

sheets, cross-section and earthwork drawings and calculations.

GREINER ENGINEERING SCIENCES, INC. (Aurora, Colorado).

Civil Drafter, January 1986 to March 1986.

Was responsible for survey and land developments, roads, sewers, hydrology, mapping,

and ink drawings.

STEARNS-ROGER ENGINEERING CORPORATION. (Denver, Colorado).

Piping Designer, August 1980 to July 1985.

Was responsible for designing and drafting of pipe and tubing arrangements, equipment

layout, piping isometrics and material take-off. Projects contributed to where ARCO,

Alaska Modular Crude Oil Separation Plant and North Slope drill sites; Mobile

Chemical, Beaumont, Texas Polyethylene Plant.

BIG THREE INDUSTRIES, INC. (Houston, Texas).

Draftsman, December 1979 to May 1980.

Was responsible for designing, drafting and checking for pipeline construction.

THE FISHER COMPANY, INC. (Houston, Texas).

Survey Draftsman, December 1978 to December 1979.

Was responsible for reducing field notes supplied by surveyors for boundary surveys,

pipeline alignment, mapping, and ink drawings.

EDUCATION

1989 Completed 54 hours basic AUTOCAD Program. Education Dynamics Institute

Las Vegas, Nevada.

1979 Advertising Art. Art Institute, Houston, Texas.

1971 Completed 33 hours of Mathematics and Engineering courses. Geology Major.

Miami University, Ohio.

REFERENCES

Duane Petersen, Piping Dept. Manager @ Brinderson 714-***-**** x377

Patrick Appin, Independent Insurance Adjuster 702-***-****

Frank Elliot @ Airtek Engineering, Engineering Recruiter 818-***-****

Dan Solares @ Mobil Oil Corporation, Design Supervisor 310-***-****