P.O. Box *** Morgan Hill 408-***-**** Jim Carrillo
CA. 95038 abgssj@r.postjobfree.com
Construction Superintendent
Objective: To seek a challenging position as a project superintendent, where my experience and
dedication are rewarded with career advancement.
2012-Present: Vandahl Engineering& Construction Inc. Goodyear, Az.
Project Superintendent: For the installation of the Rojo patient lifts into many areas of the San
Francisco Veterans Hospital and the clinics including the Emergency Department, over seeing that the
structural connections and the installations meet the engineers OPA for the systems and that the
USACOE specs are met. Working with the VA. Project managers and the department heads and hospital
personnel. OSHA-30 certificate was required.
2008 –2011 Angotti & Reilly Inc. San Francisco, Ca.
Primary Superintendent:
Work on the remodel of the cooling towers at UCSF Medical Center at the Parnassus site.
Working on multiple projects at Valley Med Hospital in San Jose Ca.
Cooling tower,Rehab parent room remodels, pharmacy remodels, upgrade elevators in several
locations, work in the mental health clinic, flooring projects, remodel of the Nuclear CT scan
area. Remodel of the new parking lot installing bio-swales, adding a new pharmacy hood through
five stories working with the confined space guide lines, installation of ergotron units in labor &
delivery and the micu units and the ccu units, installation of pixis units into the icu’s, installation
of patient lifts (goldmann) into many locations, refinishing the kitchen floors while still in working
hours, work in the E.R.department, installation of new VFD’s and the main panels.
Always involved with the ultimate care for Infectious control. Confined space card was needed.
2007 2011 Staples Construction Inc. Oxnard, Ca.
On Site Superintendent.
Work on the Superior Court House in Walnut Creek for the State of Calif.
Work on the San Jose main jail and the county Jail @ Elmwood. Building the fences and upgrade
the underground /fixing the damaged doors and the frames. Working on the barricade at the front
of the entry for the bridge, taking care not to damage the environment creek and the wild life.
Work at the county women’s care facility Mariposa adding the septic and the new water tank. ***
Work at Valley Med Hospital in San Jose, Ca. work on the Rehab rooms / remodel, adding new
cabinets and floors everything new. Working close with the inspectors and the projects
principles.
Experience: 2005-2006 Warmington Homes California. Morgan Hill, CA.
Project Superintendent
Responsible for the construction of the 26homes from rough grade
/working closely with off sites to get the underground in and all the
Utilities as well as inspections prior to getting the permits to build. Home
price at $800K-$1,250,000.00
Swppp responsible and trained, Project schedule responsible inspection
Walks as well as homeowner walks.
Taskforce member for the Elaint surveys to better the company.
Closing the homes on time and on schedule with complete homeowner
satisfaction, working well with the warranty to correct the prior errors in
The previous phase. Quality is # 1
2003-2005 William Lyon Homes Inc. San Jose, CA.
Project Superintendent
Responsible for a tract of 54 homes priced at above $1,000,000.00 and
above, conducting home owner option walk through to final walk
Through as well as city inspections.
Project scheduling, purchasing materials, approving of billings.
Survey’s by home owners about the satisfaction of there homes scored
Above 95%.
Build the models and the sales office and make the process of interior
Design runs smooth.
2002-2003 Self-Employed. San Jose, CA.
Carpenter- Handyman
Responsible for many of my old customers, to complete their home
Project’s in both their primary and second homes.
2002 Fernandes & Sons GC San Jose, CA.
Project Superintendent
Construction at San Jose regional medical center kitchen
Construction at George Minor elementary school remodel
Working with the IOR and the Oshpd inspectors.
2001 Robert A. Bothman, Inc. San Jose, CA.
Project Superintendent
Oversaw the reconstruction of the three school sites
Deal with the owners, the engineers, the architects
Deal with the IOR’s on all three sites.
Microsoft Project 2007 San Jose, Ca. Certificate
Education: OICW Culinary Arts Program Menlo Park, Ca. Certificate
Microsoft Windows (Office) Gilroy, Ca. Certificate
Calif. General Contractor San Jose, Ca. License
Carpentry Apprenticeship San Jose, Ca. Certificate
Branham High School San Jose, Ca. Diploma
.