David A. Tomczyk
Jackson, MI ***03
********@*****.***
Profile
More than 35 years of experience in Electrical Design Engineering
with responsibilities that have spanned project coordination, client
contact, project estimating, and computer-aided drafting (CAD). Projects
have included new construction and renovation of industrial, commercial,
healthcare, government, residential, Department of Transportation, and
airport facilities. Also responsible for the design of many low-voltage
and medium-voltage power distribution systems.
Construction administration has included General Motors Transmission Plant
in Toledo, Ohio; General Motors Assembly Plant in Moraine, Ohio; and VA
Hospital in North Las Vegas, Nevada
Work History
DJI & Associates, Inc., Jackson, MI
September 2012 - November 2012
. Employed as an electrical engineer. Worked on power design for the
gas pipeline industry.
Project Solutions Companies, Columbia, MO
September 2010 - April 2012
. Employed as Sr. Electrical Engineer. Worked on a Risk Assessment Study
for a major hospital facility in the state of California. Included as
part of this project was conducting a short circuit and coordination
study of the electrical distribution system as well as providing an
arc flash study using SKM program and modeling.
Harris Consulting Engineers, Las Vegas, NV
August 2007 - December 2008
Contact: Charles (Chuck) Rowe 702-***-****
. Responsible for the supervision and direction of up to three CAD
operators.
Project Electrical Engineer in the design of a 1.4 million square foot
addition to the Thunder Valley Casino in Lincoln, CA. Duties included
power design for new casino, parking garage, performing arts center,
and central plant facilities. Attended construction meetings with
contractors on site and provided engineering input.
. Electrical design for various Middle School projects for Clark County
School District. Performed field documentation for design of
renovation work.
. Votec Training Center, Clark County Nevada-approximately 6000 square
foot renovation of previous aircraft hangar to new classroom
facilities. Renovation required update of electrical panel boards,
distribution panels, new lighting and receptacle and power circuits.
Renovation of existing classroom HVAC requiring replacement of
existing HVAC equipment, disconnect and installation of new disconnect
and HVAC hookup. Performed field documentation for design of
renovation work. Performed construction follow-up with contractors.
. Renovation of five Middle School HVAC systems for Clark County School
District, Nevada. Work included site work to determine existing
circuits and equipment to be removed and design of electrical system
renovation to support new chiller systems.
. Electrical renovation work for Sunrise Hospital, Las Vegas, NV.
Pediatric wing. Work included site work to determine existing
lighting and power circuits involved in renovation, review of existing
documents and the design of new lighting and power circuits within
twelve patient rooms renovation space. Work also included updates to
existing nurse call system.
Ghafari Associates, LLC Dearborn, MI
August 2004 - July 2007
Contact: Mike Neville 313-***-****
. Responsible for the supervision and direction of up to four CAD
operators.
. Project Electrical Engineer on various facilities for General Motors
Corporation. Duties included power and lighting design, specification
writing, client contact, field construction engineer for:
. 430,000 sq ft new engine facility at Flint, MI Engine Plant
. 160,000 sq ft staging facility at Pontiac, MI
. 350,000 sq ft staging facility at Fort Wayne, IN
. 430,000 sq ft new transmission facility at Toledo, OH
. Proposed 430,000 sq ft new transmission facility at San Louis Potassi,
Mexico
. Design of these facilities included the design of new 2000 KVA and 2500
KVA, 480 volt unit substations for building power distribution.
Metco Services, Inc. Detroit, MI
January 2001 - July 2004
Contact: Raj Vijayhendron 313- 961-4560
Project Electrical Engineer on various projects for the city of
Detroit Water and Sewage Department. Duties included design and preparation
of construction documents, specifications, client contact, and field
construction engineering.
. Rehabilitation and rebuild of four (4) 18 million gal/day wastewater
aeration tanks.
. Renovation and rewiring of main pump station at Springwells Wastewater
Facility for the City of Detroit. New power and control wiring for four
(4) 8000 hp, two (2) 6000 hp, and two (2) 4000 hp motors, new 4160 volt
and new 480 volt switchgear.
. Replacement of two (2) 2000 KVA, 4160 volt unit substations and eight (8)
1500 KVA, 480 volt outdoor type unit substations.
. Renovation of various water pumping stations and water gate valves
throughout the city of Detroit
. Solid waste incineration facility at Warren, Michigan for Detroit Water
and Sewage Department
Cornerstone Engineering, Inc. Wixom, MI (Out of business)
May 1997 - October 2000
Project Electrical Engineer performing duties to include project drawings
and specifications preparation, client contact and field engineering and
arc flash studies.
. Facilities renovation projects at General Motors Milford, Michigan
Proving Grounds
. Computer Room rewiring at General Motors Tech Center, Warren, Michigan
. Re-design of cafeteria power circuit facilities at General Motors Tech
Center, Warren, Michigan
. Re-design of test cell lighting and power facilities for General Motors
Proving Grounds, Milford, Michigan
. Renovation of patient exam rooms, power and lighting, Oncology
Department, William Beaumont Hospital, Troy, MI
. Renovation and design of new Operating Rooms, power and lighting circuits
Henry Ford Hospital, Detroit,
. Both of the above projects included field work and document review to
determine existing lighting and power circuits to be included in the
renovation process and the design of new lighting and power circuits as
required to satisfy new hospital needs.
Ayers, Lewis, Norris & May Ann Arbor, MI
September 1992 - May 1997
Contact: Ish Nyak
Project Electrical Engineer. Duties included document and specifications
preparation, client contact, and field engineering services.
. Water pumping stations for City of Detroit Water and Sewage
Department
. Water Storage tanks for city of Detroit Water and Sewage
Department
Hobbs and Black Architects Ann Arbor, MI
June 1991 - September 1992
Project Electrical Engineer. Duties included document and specifications
preparation, client contact, and field engineering services.
. Renovation of patient exam rooms, lighting and power circuits, Mott
Children's Hospital, University of Michigan.
. Renovation of doctors' offices, lighting and power circuits, Mott
Children's Hospital, University of Michigan.
. Renovation of Laboratory Facilities, lighting and power circuits, Mott
Children's Hospital, University of Michigan.
. Design of major expansion at Sparrow Hospital, Lansing, MI. This project
required design of new lighting and power circuits and primary service
and emergency generator service routing to the hospital while maintaining
electrical services.
SALES EXPERIENCE
1989
Acme Industrial Products
Troy, Michigan
Outside sales of Tool and Die products . In four months I was able to
surpass their previous sales quota by 10%. I built good relationships with
my clients
and enjoyed the customer contact.
1982
Litton Industries
Tampa, Florida
Outside sales of Monroe Calculators and equipment. I ran the one-man
satellite office in the Orlando area where I was able to increase sales in
the territory. I was able to gain the account of the PUBLIX Supermarket
chain, which had been a target of the main office for four years. I set a
record at that time for the sale of Monroe calculators with the original
purchase order of over $200,000 to PUBLIX.
In addition, I have worked on the following Engineering projects:
Greiner Engineering Sciences, Tampa, Florida-Cargo tunnel lighting under
main runway at Miami International Airport; Tarmack Lighting Ramp Lighting
and Runway Lighting at Ft. Myers Airport; Bridge and Highway lighting
projects for the Florida State Department of Transportation; and Highrise
Apartment Building electrical in Sarasota, Florida.
Ghafari Associates, Inc., Indianapolis, Indiana-Office renovations and new
office designs for Wright Patterson Air Force Base, as well as a Steam
Tunnel Replacement at Wright Patterson, both projects requiring Government
Security Clearance.
Smith, Hinchman & Grylls, Detroit, Michigan- worked on the Defense
Intelligence Agency's Headquarters Building in Washington DC, which
required high level Security Clearance.
Military
History Served in United States Army with Top Secret Clearance from
August 1970 until separation March 1972. Honorably discharged from
the United States Army in 1976
Education
Purdue University 1991 BSEE
Skills
Managing Projects, improving efficiency, controlling costs, working
as a member of a team committed to excellence