Post Job Free
Sign in

Electrical Engineer Project

Location:
Lansing, MI
Posted:
December 29, 2012

Contact this candidate

Resume:

David A. Tomczyk

*** ******* **.

Jackson, MI ***03

702-***-****

abgqe8@r.postjobfree.com

Profile

More than 35 years of experience in Electrical Design Engineering

with responsibilities that have spanned project coordination, client

contact, project estimating, and computer-aided drafting (CAD). Projects

have included new construction and renovation of industrial, commercial,

healthcare, government, residential, Department of Transportation, and

airport facilities. Also responsible for the design of many low-voltage

and medium-voltage power distribution systems.

Construction administration has included General Motors Transmission Plant

in Toledo, Ohio; General Motors Assembly Plant in Moraine, Ohio; and VA

Hospital in North Las Vegas, Nevada

Work History

DJI & Associates, Inc., Jackson, MI

September 2012 - November 2012

. Employed as an electrical engineer. Worked on power design for the

gas pipeline industry.

Project Solutions Companies, Columbia, MO

September 2010 - April 2012

. Employed as Sr. Electrical Engineer. Worked on a Risk Assessment Study

for a major hospital facility in the state of California. Included as

part of this project was conducting a short circuit and coordination

study of the electrical distribution system as well as providing an

arc flash study using SKM program and modeling.

Harris Consulting Engineers, Las Vegas, NV

August 2007 - December 2008

Contact: Charles (Chuck) Rowe 702-***-****

. Responsible for the supervision and direction of up to three CAD

operators.

Project Electrical Engineer in the design of a 1.4 million square foot

addition to the Thunder Valley Casino in Lincoln, CA. Duties included

power design for new casino, parking garage, performing arts center,

and central plant facilities. Attended construction meetings with

contractors on site and provided engineering input.

. Electrical design for various Middle School projects for Clark County

School District. Performed field documentation for design of

renovation work.

. Votec Training Center, Clark County Nevada-approximately 6000 square

foot renovation of previous aircraft hangar to new classroom

facilities. Renovation required update of electrical panel boards,

distribution panels, new lighting and receptacle and power circuits.

Renovation of existing classroom HVAC requiring replacement of

existing HVAC equipment, disconnect and installation of new disconnect

and HVAC hookup. Performed field documentation for design of

renovation work. Performed construction follow-up with contractors.

. Renovation of five Middle School HVAC systems for Clark County School

District, Nevada. Work included site work to determine existing

circuits and equipment to be removed and design of electrical system

renovation to support new chiller systems.

. Electrical renovation work for Sunrise Hospital, Las Vegas, NV.

Pediatric wing. Work included site work to determine existing

lighting and power circuits involved in renovation, review of existing

documents and the design of new lighting and power circuits within

twelve patient rooms renovation space. Work also included updates to

existing nurse call system.

Ghafari Associates, LLC Dearborn, MI

August 2004 - July 2007

Contact: Mike Neville 313-***-****

. Responsible for the supervision and direction of up to four CAD

operators.

. Project Electrical Engineer on various facilities for General Motors

Corporation. Duties included power and lighting design, specification

writing, client contact, field construction engineer for:

. 430,000 sq ft new engine facility at Flint, MI Engine Plant

. 160,000 sq ft staging facility at Pontiac, MI

. 350,000 sq ft staging facility at Fort Wayne, IN

. 430,000 sq ft new transmission facility at Toledo, OH

. Proposed 430,000 sq ft new transmission facility at San Louis Potassi,

Mexico

. Design of these facilities included the design of new 2000 KVA and 2500

KVA, 480 volt unit substations for building power distribution.

Metco Services, Inc. Detroit, MI

January 2001 - July 2004

Contact: Raj Vijayhendron 313- 961-4560

Project Electrical Engineer on various projects for the city of

Detroit Water and Sewage Department. Duties included design and preparation

of construction documents, specifications, client contact, and field

construction engineering.

. Rehabilitation and rebuild of four (4) 18 million gal/day wastewater

aeration tanks.

. Renovation and rewiring of main pump station at Springwells Wastewater

Facility for the City of Detroit. New power and control wiring for four

(4) 8000 hp, two (2) 6000 hp, and two (2) 4000 hp motors, new 4160 volt

and new 480 volt switchgear.

. Replacement of two (2) 2000 KVA, 4160 volt unit substations and eight (8)

1500 KVA, 480 volt outdoor type unit substations.

. Renovation of various water pumping stations and water gate valves

throughout the city of Detroit

. Solid waste incineration facility at Warren, Michigan for Detroit Water

and Sewage Department

Cornerstone Engineering, Inc. Wixom, MI (Out of business)

May 1997 - October 2000

Project Electrical Engineer performing duties to include project drawings

and specifications preparation, client contact and field engineering and

arc flash studies.

. Facilities renovation projects at General Motors Milford, Michigan

Proving Grounds

. Computer Room rewiring at General Motors Tech Center, Warren, Michigan

. Re-design of cafeteria power circuit facilities at General Motors Tech

Center, Warren, Michigan

. Re-design of test cell lighting and power facilities for General Motors

Proving Grounds, Milford, Michigan

. Renovation of patient exam rooms, power and lighting, Oncology

Department, William Beaumont Hospital, Troy, MI

. Renovation and design of new Operating Rooms, power and lighting circuits

Henry Ford Hospital, Detroit,

. Both of the above projects included field work and document review to

determine existing lighting and power circuits to be included in the

renovation process and the design of new lighting and power circuits as

required to satisfy new hospital needs.

Ayers, Lewis, Norris & May Ann Arbor, MI

September 1992 - May 1997

Contact: Ish Nyak

Project Electrical Engineer. Duties included document and specifications

preparation, client contact, and field engineering services.

. Water pumping stations for City of Detroit Water and Sewage

Department

. Water Storage tanks for city of Detroit Water and Sewage

Department

Hobbs and Black Architects Ann Arbor, MI

June 1991 - September 1992

Project Electrical Engineer. Duties included document and specifications

preparation, client contact, and field engineering services.

. Renovation of patient exam rooms, lighting and power circuits, Mott

Children's Hospital, University of Michigan.

. Renovation of doctors' offices, lighting and power circuits, Mott

Children's Hospital, University of Michigan.

. Renovation of Laboratory Facilities, lighting and power circuits, Mott

Children's Hospital, University of Michigan.

. Design of major expansion at Sparrow Hospital, Lansing, MI. This project

required design of new lighting and power circuits and primary service

and emergency generator service routing to the hospital while maintaining

electrical services.

SALES EXPERIENCE

1989

Acme Industrial Products

Troy, Michigan

Outside sales of Tool and Die products . In four months I was able to

surpass their previous sales quota by 10%. I built good relationships with

my clients

and enjoyed the customer contact.

1982

Litton Industries

Tampa, Florida

Outside sales of Monroe Calculators and equipment. I ran the one-man

satellite office in the Orlando area where I was able to increase sales in

the territory. I was able to gain the account of the PUBLIX Supermarket

chain, which had been a target of the main office for four years. I set a

record at that time for the sale of Monroe calculators with the original

purchase order of over $200,000 to PUBLIX.

In addition, I have worked on the following Engineering projects:

Greiner Engineering Sciences, Tampa, Florida-Cargo tunnel lighting under

main runway at Miami International Airport; Tarmack Lighting Ramp Lighting

and Runway Lighting at Ft. Myers Airport; Bridge and Highway lighting

projects for the Florida State Department of Transportation; and Highrise

Apartment Building electrical in Sarasota, Florida.

Ghafari Associates, Inc., Indianapolis, Indiana-Office renovations and new

office designs for Wright Patterson Air Force Base, as well as a Steam

Tunnel Replacement at Wright Patterson, both projects requiring Government

Security Clearance.

Smith, Hinchman & Grylls, Detroit, Michigan- worked on the Defense

Intelligence Agency's Headquarters Building in Washington DC, which

required high level Security Clearance.

Military

History Served in United States Army with Top Secret Clearance from

August 1970 until separation March 1972. Honorably discharged from

the United States Army in 1976

Education

Purdue University 1991 BSEE

Skills

Managing Projects, improving efficiency, controlling costs, working

as a member of a team committed to excellence



Contact this candidate