Richard A. Mohoruk_____________________________________ P. O. Box 706

Erickson, MB. R0J 0P0 204-***-**** *********@*******.**

Objective:

Construction Project Manager with a strong safety background seeking employment opportunity for continuing

professional growth in the management and safe execution of construction projects.

Summary of Qualifications:

Knowledgeable in project management principles, practices, and methods – PMP designation in progress

Proven management skills with ability to organize, plan, schedule and direct the work of others engaged in provincial and

municipal infrastructure projects.

Strong written and verbal communication skills – effectively interact and build relationships with clients, engineers,

inspectors, subcontractors and regulatory representatives.

Thorough knowledge of construction practices and techniques employed in concrete and steel bridge construction;

horizontal boring; culvert jacking; piling, shoring, heavy haul and structural moving.

Comprehensive understanding of contract documents and project specifications; ability to interpret technical drawings and

resolve technical issues – identify variances and negotiate change orders.

Experienced in planning and implementing a workplace safety and health program, provide training, perform hazard

assessments, inspections and incident investigations – CSO designation in progress

Excellent computer skills with proficiency in MS Office and MS Project Manager Pro.

Related Training and Certificates:

Masters Certificate in Project Management – Schulich School of Business/University of Winnipeg 2012

Construction Safety Association of Manitoba Certificates;

Registered Safety Auditor #39503 11

WHMIS TTT

Principals of Safety Management

Leadership for Safety Excellence

1

Safety Administration

Safety Rep Awareness

Legislation 101

Forklift Safety

Confined Space Entry Elite Safety Services

WCB Basics

Saskatchewan Traffic Accommodation Supervisor – Saskatchewan Safety Council

Saskatchewan Work Zone Flagging TTT – Saskatchewan Highways and Transportation

Standard First Aid/ CPR C with AEE First Aider 2 – St John Ambulance

Branch 1 Mobile Crane Apprentice

Professional Associations:

Project Management Institute (PMI) –PMI Manitoba chapter, Winnipeg, MB

Richard A. Mohoruk_____________________________________ P. O. Box 706

Erickson, MB. R0J 0P0 204-***-**** *********@*******.**

Professional Experience:

Minty’s Moving Ltd. Onanole, MB. Sept. 2003 Nov. 2012

Project Manager, 2009 2012

Monitor and control the on site construction activities of employees and subcontractors to ensure provincial and municipal

infrastructure projects were completed on schedule and in accordance with design specifications.

Ensure all construction activities were performed in compliance with WSH regulations.

Interpret design drawings and written specifications perform critical task analysis; create work breakdown

structure and construction schedule.

Plan and implement quality control and quality assurance policies and procedures

Determine construction material requirements – procure materials and coordinate delivery with construction

schedule.

Effectively interact and communicate with clients, engineers, inspectors and worksite supervisors.

2

Identify variances/changes in scope manage and negotiate change orders/force account work.

Coordinate the activities of subcontractors and suppliers – approve invoicing.

Safety Coordinator, 2009 2012

Manage all aspects of a health and safety program for a heavy construction company of 50.

Complete safety and environmental inspections, identify issues and develop corrective action plans to insure compliance

with federal and provincial safety, health and environmental regulations.

Develop and implement safe work procedures, safe work practices and company safety policies

Coordinate and conduct safety training and skills development.

Perform incident investigations – provide root cause analysis.

Create project safety plans – perform site specific hazard assessments, develop emergency responses plans and

environmental protection plans.

Prepare detailed traffic accommodation plans

Manage Company COR program perform annual audit and statistical analysis

Prepare monthly health and safety reports and environmental reports.

Project Supervisor, 2005 2009

Supervise the onsite activities of 5 20 employees and subcontractors engaged in bridge construction and

rehabilitation, piling, shoring, heavy lift/haul and structural moving projects.

Ensure all work was performed in compliance with WSH and environmental protection regulations

Coordinate the delivery of construction materials to site – inspect for quality/quantity, maintain records

Document on site activities and prepare daily progress reports – schedule inspections

Interact and communicate with clients, consultants and inspectors to ensure work was carried out in compliance with

plans, specifications – provide status reports,

Identify variances and negotiate change orders/force account work

Perform the duties of site safety supervisor complete safety and environmental inspections, identify issues and determine

corrective action.

Provide new employee orientation and conduct daily tailgate safety meetings

Heavy Construction Labourer, 2003 2005

Work as part of a heavy construction crew performing commercial and residential structural moving, bridge construction,

piling, and shoring and heavy lift/haul projects.

Operate a wide variety of construction equipment including; unified hydraulic jacking systems, skid steer loaders,

4 & 10 ton forklifts, tele handlers, mini hoes, mobile cranes and boom trucks.

3

Richard A. Mohoruk_____________________________________ P. O. Box 706

Erickson, MB. R0J 0P0 204-***-**** *********@*******.**

Project Experience:

Project Manager Bridges

Wiwa Creek Bridge, Hwy #58 – Sask. MHI #B12060

o

Frenchman River, Hwy #18 and Denniel Creek Bridge, Hwy #2– Sask. MHI #B12057

o

Garden River Bridge, Hwy #55 – Sask. MHI #B11161

o

St Victor and West Poplar Bridges, Hwy #2 – Sask. MHI #B11167

o

Unnamed Creek Bridge, Hwy #29 – Sask. MHI #B11072

o

Jewel Creek Bridge, Hwy #35 – Sask. MHI #B10024

o

Qu’Appelle River Bridge, Hwy #56 – Sask. MHI #B10023

o

10 multi span bridges for the Saskatchewan Rural Municipalities of Lamond/Laurier (2), Britannia,

o

Estevan, Spy Hill (2), Torch, Lajord

5 multi span bridge replacements and repairs for the Manitoba Rural Municipalities of Alexander,

o

Kelsey, Swan River and Lorne (2)

Responsible for monitoring and controlling the on site activities of employees and subcontractors engaged in the

construction of single and multiple span bridges. Interpret technical drawings and specifications. Identify material

requirements and coordinate testing and delivery to meet production requirements. Interact and communicate with clients

and consultants –provide status updates, identify variances, resolve technical issues and negotiate change orders.

Develop schedules, site safety plans and traffic accommodation plans. Ensure all work was performed in accordance with

company safety policies and procedures and WSH acts and regulations. Work included; the installation of detour bridges;

demolition, salvage and disposal of existing bridge structures; driving of pipe pile foundations and the installation of pre

cast pile caps and girders; installation of timber lagging and pre cast back/wing walls; excavation of abutments; backfill

and compaction of aggregates; restoration of spillways and side slopes including erosion control measures; erection of

bridge and approach rails; paving of bridge deck and approaches.

Project Manager

Horizontal Boring and Culvert Jacking, Hwy #1 east of Brandon, MB –MIT

o

Horizontal Boring and Culvert Jacking, Hwy #83 south of Swan River, MB – MIT

o

Responsible for monitoring and controlling the on site activities of employees and subcontractors engaged in horizontal

boring and installation of pre cast concrete culverts. Interpret technical drawings and specifications. Identify material

requirements, resolve technical issues and negotiate change orders. Develop site safety plans and traffic accommodation

plans. Ensure all work was performed in accordance with company safety policies and procedures and WSH acts and

regulations. Work included; horizontal boring 30 60 metres under highways in multiple locations; installation of pre cast

concrete culverts by hydraulic jacking, grouting; decommissioning of existing culverts; site restoration and erosion control

measures

Construction Project Manager

Shoo fly Detour Acrow Bridge, Manigotagan, MB East Side Road Authority/MIT

o

Responsible for supervision of 20 employees and subcontractors in the assembly, launch and installation of a 200ft Acrow

bridge over the Wanipigow River. Interpret technical drawings and specifications. Identify material requirements and

4

coordinate testing and delivery to meet production requirements. Interact and communicate with clients and consultants

and engineers – provide status updates, schedule inspections, identify variances, resolve technical issues and negotiate

change orders. Develop site safety plans and traffic accommodation plans. Work included; transportation and assembly

and cantilevered launch of a 200ft Acrow Bridge; all associated work in the construction of abutments and approaches to

the detour bridge.

Richard A. Mohoruk_____________________________________ P. O. Box 706

Erickson, MB. R0J 0P0 204-***-**** *********@*******.**

Construction Project Manager

Refit and modification of James Apetegon Cable Ferry, Selkirk, MB, MIT

o

Responsible for the planning, organizing and direct supervision of all on site activities related to the refit and modification

of the Cable Ferry James Apetagon. Interpret technical drawings, electrical schematics and specifications. Identify material

requirements and coordinate delivery to meet production schedule. Interact and communicate with clients, consultants and

engineers – provide status updates, identify variances and resolve technical issues. Identify, manage and negotiate 67

change orders resulting in a 300K increase in contract value. Create project safety plan – perform site specific hazard

assessment, develop emergency response plan and environmental protection plan. Work included; modifications to the

length and width of the vessel’s hull and replacement of deteriorated hull plating and internal structural components;

Coordinate the activities of sub trades and suppliers in the construction and installation of the wheelhouse and mechanical

enclosure; Coordinated and supervised the installation and interconnection of all electrical, mechanical and hydraulic

components. Worked closely with engineering consultants and Transport Canada inspectors to ensure compliance with all

ship building and safety standards.

Project Manager/Supervisor Shoring

Fort Carlton Access Road Embankment Stabilization – Sask. MHI #HQ11158

o

Conway Outfall Gate Chamber, City of Winnipeg – Hansch Construction

o

University of Winnipeg Outfall Chamber, City of Winnipeg – Gateway Construction

o

7 Outfall Gate Chambers, City of Winnipeg – Gateway Construction

o

Responsible for coordinating and supervising all on site activities required for the installation of shoring structures to

facilitate the construction of outfall chambers and lift stations. Interpret technical drawings and specifications. Interact and

communicate with clients, consultants and engineers. Identify material requirements, resolve technical issues and

negotiate change orders. Perform hazard assessments and daily tailgate meetings ensure all work was performed in

accordance with company safety policies and procedures and WSH acts and regulations. Work included; the lay out and

driving of steel H piles or sheet piles; installation and removal of timber lagging and ring beams; backfill, compaction and

testing of aggregates; removal or cut off and abandonment of piling; site restoration.

Project Supervisor – Structural Moving

Commercial and Residential Structures

o

120 450 ton Transformers, Gillam, Dorsey, Ponton Hydro Stations – MB Hydro

o

Supervise and direct the activities of a structural moving crew engaged in the lift; load; transport and unloading of hydro

station transformers, industrial equipment and more than 200 commercial and residential buildings. Interact and

communicate with clients, consultants and engineers. Perform hazard assessments and daily tailgate meetings ensure

all work was performed in accordance with company safety policies and procedures and WSH acts and regulations. Work

5

included the rigging and operation of; mobile cranes and boom trucks; unified hydraulic jacking systems; mechanical and

hydraulic sliding systems; multiple axel steering dollies and specialized apparatus’.

References

Harold Minty, President/Owner Minty’s Moving Ltd. –Ph: 204-***-**** (see attached letter)

o

Bob Ward, International Marine Consultants – Ph: 604-***-****

o

Steve Cunningham, HSE Coordinator, Leadcor – Ph: 306-***-****

o

Box 270, Onanole, Manitoba, R0J 1N0 Ph. 204-***-**** Fax 204-***-****

November 9, 2012

To Whom It May Concern:

I would recommend Richard Mohoruk as a potential candidate for your organization. His ability to learn and

take on new responsibilities during his 2003 – 2012 employment with Minty’s Moving was one of his strong

points. Rick progressed from being hired as a labourer to the position of Project Manager and Safety

Coordinator during his employment with Minty’s Moving Ltd.

Minty’s Moving Ltd. is a multi-dimensional structural moving and heavy construction company focused on the

construction and rehabilitation of bridge structures, pile driving, horizontal boring, culvert jacking, shoring,

structural moving and heavy hauling. Rick’s capacity to acquire new knowledge and abilities contributed to his

many accomplishments while employed in this diversified environment.

As a Project Manager, Rick is experienced in managing all aspects of construction projects which included

working closely with engineers, consultants and sub-contractors, understanding contract documents and project

specifications, interpreting technical drawing and resolving technical issues.

When the position of Company Safety Coordinator became vacant he accepted this additional workload and

volunteered to take more training to take on the responsibilities associated with this position. Rick did an

excellent job in the position of Safety Coordinator and COR auditor. He performed his duties with dedication

and enthusiasm.

6

If you would like additional information about Rick, you can call me at 204-***-****.

Sincerely,

Harold Minty

President

7