ATHAR ZAMAN
**** ***** ******, ***********, ** L*N 8B5
Tel: 905-***-**** Cell: 416-***-**** E-Mail: **************@*****.***
PROFILE
Quality Systems and Operations Manager with over 24 years of progressive and diversified
experience in the American, Japanese and Korean Automotive Assembly, Weld, Paint, Stamping,
Supply Chain, Project handling and Quality management environment. Strong working
knowledge in manufacturing Quality Assurance, reduction of COPQ and Operations management
and plant set up activities from ground-up based on Toyota Production Systems tools and Six-
Sigma and Lean principles. I bring to the table a unique set of process focused, strategic Quality
management systems skills, which I have successfully transferred to several different industries &
disciplines. Developed a continuous improvement minded corporate culture. Education includes a
Bachelor of Science in Mechanical Engineering and MBA.
QUALIFICATIONS
Quality and Operations Management
Developed Quality Management System for Fuji & Land Rover acting with additional
Portfolio of Quality Manager. 50 Global Suppliers developed based on PPAP and APQP
Product launches.
Proven Operational Excellence Manager Captured savings over $1.05 Million in 2001
and projected $1.1 Million for 2002 through business process improvements by utilizing Six
Sigma and Lean Methodologies
Trained in Toyota Motors Japan for Assembly Plant infrastructure, Process Total
Quality Control and Operations development, Plant equipment and Machinery selection 1990.
Trained in KIA Motors South Korea 1995
Participated as Team Leader in New Honda QC Circles World Convention in Japan
1985. Elimination of trouble in Die-Casting M/C
Trained in Switzerland, Italy, Germany for Plant Machinery, Process Quality Standards
(injection, blow molding, extruders). 1998-9. Attended K 98 Plastic Technology International
Fair in Germany. 1998
Materials Management
Achieved 42% part deletion/Supply Chain Management in 18 months in automotive body &
assembly parts in line with Land Rover-Ford Motors Lean manufacturing concepts.
Developed cross functional sourcing teams producing $5.4 Million savings in material in the
first year through implementation of Statistical Process Control and Continual Improvement
Trained Supply Chain Management team, effectively reducing line side stock to less
than 5% through development and implementation of Key Operational Metrics
Business Process Improvement. Led diverse, cross-functional teams in the fulfillment
of corporate productivity, quality and bottom-line objectives by reducing cost of poor
quality(COPQ)
Achieved Car assembly erection and commissioning of Toyota plant with 32% cost
effective timely completion for Projects, Products and services budgeted targets
Achieved financial target 25% less than its initial budget in erection and commissioning
of Car/Truck plant with aggressive recruitment and training of engineering and quality teams
for KIA manufacturing systems in Seoul, South Korea.
Leadership and Management
Led Production Engineering and Quality Control departments for r esource and out-
source projects for approximately $30 Million spend of mechanical elements (machined parts,
fasteners and bearings, castings) to domestic and low cost countries.
Facilitated KAIZEN Events and improved upon production targets; KAIZEN
activities. 5~50 Quality Circles; 5S Activities and 100~1500 Creative Suggestion Systems.
Quality Manager for ISO 9001/ QS 9000 Certification for multiple Corporations
ATHAR ZAMAN 2
Research Paper presented on Concepts & Tools for Productivity Promotion for
Asian Productivity Organization Japan, 1994.
Facilitated Mentored and Coached teams on Automotive Structures, Chassis, Trim,
Painting Engine systems Testing and Trouble Shooting at Honda, Toyota, KIA, Land Rover
CAREER HISTORY
ROCKWELL AUTOMATION –Allen Bradley Products 2008-2011
Production Operations Manager
Achieved 100% On Time Delivery while maximizing profit margins through Continuous
Improvement Lean methodologies. 94% Throughput of out going quality products by
monitoring productivity, Quality, Cost, Cycle time metrics.
Achieved Customer Satisfaction by 100% shipping compliance. Developed yearly
departmental operating budgets and $ 60 Million Annual Operating Plans and 10% reductions
in operational expenses. Estimated and Monitored all internal and external customer quotes
Facilitated Trained Teams and Developed skill metrics and cross trained 25% for
Safety and Health, Standard Operating Procedures and ISO 9001:2008 Quality Standards for
Flexible manufacturing. Proactive member of Super users implementation team for SAP
modules Production Planning, Shop floor Quality
Achieved 15% Improvement in productivity for electro deposition of paints through process
and conveying system redesign
GENERAL MOTORS CORPORATION – Chevy, Pontiac, Monte Carlo, Buick 2007
Production Manager
Supervision of operations, support of workgroup leaders and base operators with
direction of SPQRCE (Safety, People, Quality, Responsiveness, Cost, Environmental) issues.
Implemented COMWIP(8 Non Value added Wastes) for New Projects and Products
Introduction
New process setups for manufacturing processes. Visual Cell layout based on Global
Lean Management System (GMS). Achievement of production targets; 96% throughput.
FORD MOTORS CORPORATION – Edge, Lincoln, Free star 2006
Production Manager
Management of SQDCME (Safety, Quality, Delivery, Cost, Environment ) metrics in line
with Ford Motor Systems (PDCA, 8D Process, QFD, VA/VE, PFMEA etc.).
Achievement of production targets. 85% throughput. 09% savings in Forecasted
Annual Budgets and cost estimates
Facilitated and Cross trained 50% flex team of Group Leaders and Team Members in
line with Ford Motors Quality engineering concepts.
LAND ROVER FORD – Range rover, Discovery, Freelander, Defender 2002-2005
General Manager Projects and Quality Assurance
Responsible for global logistics, international trade compliance and strategic SCM project.
Led Global Merger Integration Team for warehouse parts distribution and set up activity.
Developed global network to support sales of $ 5 billion, resulting in $100 million in
savings based on Should Costing.
Supervised Quality Management System development for incoming and out going
materials
Acted as a Change Catalyst for Product Launches through PPAP/ APQP initiatives. Set up
the KANBAN System for new materials and product.
FUJI JAPAN – Metal Machining Components 1999-2002
General Manager Operations and Quality
ATHAR ZAMAN 3
Managed manufacturing and quality of casting, CNC/NC Machining, Stamping of ferrous
and non ferrous parts for domestic and export markets.
Supervised new products development processes and supply chain of parts and Business
Unit pricing strategies
Led Kaizen activities (Quality Circles, 5S Activities, and Creative Suggestion Systems)/ Project
management (Facilitated and Training of cross functional teams for Lean Initiatives).
Led New Plant layout/consolidation based on flexible manufacturing systems and specialized
precision parts manufacturing inclusive of paint plant set up for metal painting. 25%
enhancement in Productivity achieved by built in quality systems
Developed Quality Management System and as Quality Management Representative
implemented ISO–9001/QS 9000 through Lloyd’s Register (England).
KIA MOTORS – Pride, Ceres, Sephia, Sportage 1995-1998
Senior Manager Production Engineering
Development of facilities of all Welding, painting and assembly operations and sheet metal
parts manufacturing inclusive of: Value Stream Mapping; Shop Layouts: Equipment
Finalization & Selection; Set up of Production and Quality processes/ Supply Chain
Management, Estimating Material and labour resulting in availability of 30% more space and
development of Focused Factory
Led Assembly Plant Engineers to finalize with PPMC all assembly shop materials process
flows, KANBAN drop off points. Total Quality Control achieved 50% work in process stock
reduction.
Supervised Assembly Engineers to set up a formal procedure to establish cut-off points for
obsolescence materials and products
Installation and commissioning of Paint Robotic systems for electro coat. Procurement of paint
accessories and material through negotiating contracts with global suppliers.
TOYOTA MOTORS – Corolla, Hilux, Camry, Cuore 1990-1995
Senior Manager Projects and Production
Development of facilities of all assembly operation, inclusive of value stream mapping, shop
layouts, selection of Assembly and testing equipment, consolidation/ facilitation of Production
Planning and Quality Control in line with TOYOTA PRODUCTION SYSTEM.
Developed and monitored Projects and Products costing aligned with TOYOTA Cost
Reduction Principle
Proposed and supervised Set of Production processes & Material Handling System including
KANBAN, parts flow, drop off point and delivery window for new Assembly plant. Achieved 1.5
Defects Per Unit through implementation of Root cause and corrective action and 5 Whys.
Developed Model Visual Factory
Responsible for Recruitment training of Engineers, Group Leaders, Team Leaders, Team
members on lines of TOYOTA production system tools (Pull System, JIT, JIDOKA, KANBAN,
ANDON, TQC,TQM.)
Achieved 25% cost saving in material process productivity improvement flow
through Kaizen activity of elimination of Electro deposition splashes on car
body
Honda Motors- Honda Automobile Cars and Power Products 1983- 1990
Shop Manager Production
Managed Engine Assembly Shop .Implemented SPC tools..
Supervised functional component shop including manufacturing and quality
control.
Oversee die-cast parts manufacture and sheet metal parts painting.
Directed the plastic parts manufacturing through vendors (PPAP/ APQP).
ATHAR ZAMAN 4
Managed Assembly Shop which includes Quality Control Methods based on
Seven SPC Tools, X-R Charts, Histograms, Pareto Charts, Fish Bone analysis.
Accomplished and improved upon: production targets; Kaizen activities;
Quality Circles; 5S Activities; and Creative Suggestion Systems.
EDUCATION
MCPM- Masters Certification in Project Management, Schulich School of
business, York University, Canada,
2010
MBA - Institute of Business Administration affiliated Wharton School of Economics, USA, 1996
B.Sc. Mechanical Engineering - University of Engineering and Technology, affiliated
Maclagan College UK., 1982
PMI- Certified Member Project Management Institute, USA and Certified internal Quality
auditor