|ANTHONY L. SCHWEITZER |
|*** Shell Ave. #*, Martinez CA 94553 |
|CELL: 925-***-**** ***********@*******.*** |
|Member ID. U-7721-3769 LOCAL 102 |
|Male/12/29/1957 CDL D2884065 BATC/TWIC/OSHA 30; |
|ASNT-ACCP LEVEL II, LEVEL I/II UT,MT,PT/NACE |
|AWS;CWI/QC1:12120451/CWE/QC5:1212011E |
|102 MILLWRIGHTS/ mULTI PROCESS CERTIFIED WELDER/CWI/CWE/ASNT Level II |
| |2004-2012 Attended CCTNC, Pleasanton Ca. UBC |
| |Training/Welding |
| |2005-2007 Attended Colorado Tech University BSBA |
| |Undergraduate |
| |2000-2004 Local 4 San Francisco Ca. Commercial High Rise |
| |1996-2000 Local 300 Seattle WA. Commercial/Industrial |
| |1986-1996 Local 1756 Honolulu Hawaii |
| |Commercial/Industrial/Govt. |
| |1980-1986 Johnston Atoll Chemical Disposal Facility / |
| |Industrial |
| |Job type location Summary: Includes: Bridges, Stadiums, |
| |Refineries, Military bases, Shipyards, Airports, Colleges,|
| |Public Works, Commercial. |
| |Hawaii/Guam Projects: Kaneohe HI. Waste water treatment |
| |facility. H3 Tunnel Kiewit projects. Multiple government |
| |facilities, including Johnston Island South Pacific |
| |Chemical Disposal Facility JACADS 1981-86, Big |
| |Navy/Anderson Air Base Guam 1991. Hickam Airbase/BEQ |
| |projects at Pearl Harbor, Ft. Shafter |
| |Seattle WA. Projects: Bremerton Sub Base structural |
| |retrofit. Commercial projects: |
| |Nordstrom's flagship renovation, Allied Signal tech |
| |facility, Safeco insurance complex, Microsoft Campus |
| |Redmond WA. Real Networks main office builds IMAX Dome new|
| |construction Seattle Center. Multiple public works |
| |projects |
| |San Francisco projects include: Antioch Power Plant/ |
| |Bechtel. PGE Eureka power plant/ Haskell. Genentech |
| |projects South San Fran/DPR, City College Geo Thermal |
| |Project. East Bay Mud Waste Water Treatment. |
| |Recent Project June 2012 DVC Bldgs. Flintco Project, |
| |Pleasant Hill Ca. Structural Welding new construction. |
|EMPLOYMENT |Jan-July 2011 East Bay Muds waste water treatment facility|
|HISTORY |Oakland Ca. Tank welding. Proven Management digester |
| |upgrade project Oakland Ca. |
| |Jan-May 2010 Local 102 Millwrights: PGE Power Plant |
| |project Eureka Ca. Haskell Construction Co. Structural |
| |welding |
| |Mar-Aug.2009 San Francisco State College Geo Thermal |
| |Project, |
| |July 2008-Mar 2009 Specialty Construction Co. San Pablo |
| |Helms middle school project. Structural welding. |
| |Jan 2008-July2009 Local 713, Swinerton Construction |
| |including: One Polk San Francisco. Glide Building. Hilton |
| |Hotel |
| |2005-2006 Pacific Coast Interiors: |
| |2005- North County Construction Co. Napa Ca. |
| |1995-2000 Local 300, Long Painting Seattle WA. Projects |
| |include: Bremerton Sub base, Allied Signal, Nordstrom's, |
| |Real Networks, and Imax Dome 1986- Local 1756 Hawaii ASH |
| |Painting. Projects include: Pearl Harbor/ Hickam/ |
| |Kaneohe military bases, Honolulu International airport, |
| |1990-1991 Guam Big Navy, Anderson Air base |
| |1980-1986 Johnston Island JACADS Chemical Disposal |
| |Facility Project. |
| | |
| | |Education |
| | |Ongoing |
|EDUCATION |UBC Training: | |
|CERTIFICATES | | |
|CONTINUED | | |
|TRAINING | | |
|Welding | | |
|Certs* | | |
| |{Leadership Training (LTP 1-10}: Dennis Rose instructor: |
| |Result oriented training for superintendents running |
| |public works projects. A comprehensive program designed to|
| |make the contractor successful based on the |
| |superintendent's ability to coordinate the construction |
| |process. Requiring a thorough understanding and ability |
| |to implement the contract specifications along with the |
| |blue print drawings. Additional required daily reports and|
| |project management scheduling updates. Use of critical |
| |path scheduling as a tool to achieve a time line for |
| |everyone to follow. Also helpful with timely submittals, |
| |ordering of long lead items/billing/change orders, and |
| |time tracking all sequence of events from the award to |
| |final completion. Additional organization includes: |
| |conducting weekly meetings agenda with subs/office |
| |management, architect, inspectors, vendors and workforce. |
| |Maintaining As Built Plans. Seeing to the art of everyone |
| |having time to do the job safely and meet the scheduled |
| |deadlines. Emphasis on quality and safety. |
| |{Commercial Blue Print Reading Certificate}: John Driskall|
| |instructor: Clear understanding of symbols/legend and the |
| |interfacing of the blue print drawings, with the |
| |specifications manual. |
| |{*Certified Multiprocess Welding Certificates*}: Current |
| |Certificates: 6013 (SMAW) thin gauge metal, 211/212 Flux |
| |core (FCAW) 035/045 innershield/outershield micro wire. |
| |6G Structural wire (232).072 innershield. |
| |SMAW 3, 4 & 6G unlimited plate thickness and all position |
| |open root pipe certs. |
| |Mig Tig & GMAW. |
| |GE Gas/Steam Turbine Las Vegas Nevada 2007 |
| |Over head crane operator, Rigging card, Qualified |
| |Signaler, GE |
| |Hytorc Bolt Technician, BATC, TWIC, Passport, CDL |
| |OSHA 10-16-30 Hour card/Siemens Human Performance/ |
| |Blue Print Plan reading, Construction Math Labs, Primavera|
| |Suretrack Current projects include |
| |CIP, Nace coatings inspector training level I. |
| |Level III, ASNT-ACCP VT preparation. |
| |AWS entire code book library: AISC, ASTM, CBC, ASME, API &|
| |Military codes/standards. |
| |NOTES: AWS CWI/CWE/NDT programs aided by Kiewit |
| |associates; Sonset Consulting Labs, 7679 North 140th East |
| |Ave. Owasso, OK 74055 http://www.weld-procedure.com/ |
| |Rick Gaffney instructor CWI, Level III NDE, 918-***-**** |
| |or ****@****-*********.*** Certificates available on |
| |request. Computer aided UT training provided by |
| |JClasenCowley NDT/NDE.org/Paul Rawlingson5; UTman 3D |
| |Simulation software program. Physical hands on shearwave |
| |UT training hours on Staverly Sonic 1000 provided by: |
| |Ted Ilo/CWI/Level II UT NDT. |
| |Associate Mark Reese Level III, ARC Sacramento, CCTNC |
| |Pleasanton Ca. |
| |References: |
| |Heath Vester, CWI/NDE/CCTNC Instructor: 510-***-**** |
| |Mike Adams Mechanical Instructor WWCC: 509-***-**** |
| |Ted Ilo CWI/NDE: 415-***-**** |
| |Daryl Adams CCTNC Weld Instructor: 925-***-**** |
| |Local 102 Millwrights: 925-***-**** |
| | |