Post Job Free
Sign in

Power Plant Mechanical Engineer

Location:
alexandria, NY, 90001
Salary:
8000$
Posted:
December 24, 2012

Contact this candidate

Resume:

C.V.

Personal Data

Name : Alaa Mahmoud Ibrahim.

Address : 14masged el mowahden St el ktan, El ras el soda -Sidy Bashr kbly – Alexandria, Egypt.

Tel. : +203-*******

Mobile. No. : +201*********

+201*********

E-mail : **************@*****.***

Date of Birth : 09/02/1968

Qualification : B.Sc. of Mechanical Engineering (Power)

Graduation Year : 1991

Graduation Project Grade : Good

Marital Status : Single

Military Status : Finished

Languages : Arabic, English, Italian and French

Computer Skills : Windows, MS Office.

Position : Construction Manager.

Essential Duties:

Provides engineering assistance to superintendents, directs assigned personal in meeting cost and time schedules, verifies materials, equipment, workmanship and assures results meet design requirements.

Responsible for the organization and direction of construction engineer forces, activities relating to construction engineering, subcontracts, engineering liaison to design offices.

Very good experience & Knowledge of piping material, installation and repairing equipment, Boiler construction & welding technique, Maintenance organization, work distribution to contractors, manage foreman, supervisor and allocating tools and manpower.

Following up the work and coordinating with client and consultant.

Pervious Experiences:

From April 2003 till Now

Project: (RAS LAFFAN – POWER AND WATER PLANT) QATAR.

Company:

Enelpower (Italian Co.)

Duties:

Senior Mechanical Engineer.

Steam Turbine installation 2 unit.

All system for steam turbine, equipment & piping (lube oil, gland steam, control fluid, main steam, seal steam and turbine drain syst.

Condenser installation.

Erection of H.P. piping steam & feed water line including equipment deaerator & feed water pumps.

From Sep 2000 till March 2003

Project: (AMCO) Alexandria Mineral Oil Company (Petroleum Co)

Lube oil expansion project. Alexandria – Egypt

Company:

Fincimec S.P.A. (Italian Co.)

Duties:

Construction Manager for

Installation pipe line &equipment for boiler area.

Installation of pipe, equipment, pumps, pipe and supports for pumping station tanks area.

Installation of steam tracing.

Maintenance & punch list related to start up and commissioning.

From Apr 2000 till Aug 2000

Project: Egypt. Boot #1 Sidi Krir power plant unit 3,4. (2 320)Egypt

Company:

Bechtel. Egypt S.A.E. (American Co) Alexandria- Egypt.

Duties:

Senior Field Piping Engineer.

Field fabrication & installation of piping.

Installation of critical pipe.

Water treatment plant.

Condensate polisher system.

From July 1998 till Mar 2000

Project: Alex. National Iron and Steel (ANSDK) Egypt.

Company:

Hitachi Plant Engineering & Construction (Japan Co.)

Duties:

Construction Manager for

Dismantle & installation fume extraction system (2 units)

Dismantle fume ext. system from (ANSDK) site in Alex.

Installation fume ext. system in Arab steel company in 10th of

Installation of thread D.R.

Piping installation.

From Aug 1997 till Jun 1998

Project: Sidi Krir Thermal Power Plant Unit 1,2 (2 320 MW) Egypt.

Company:

Techint Cimimontubi (Italian Co.)

Duteis:

Area Manager for

Installation of Desalination Plant (5000 M3/DAY)

Installation of Air preheaters (4 groups)

From Jun 1996 till July 1997

Project: Soma Bay Development Hurhghada (Power Plant) Urgada- Egypt.

Company: Ansaldo (Italian Co.)

Duties: Senior Mechanical Engineer for

Power Generation Plant (4 6 MW)

Water Desalination Plant (1500 m3 /day) 2 units.

Sewage plant.

Fuel Oil tank & pumping station.

Fire protection & fire fighting system.

HVAC system.

Following up & solving mechanical problem for the plant.

Inspection & handing over of the plant to the client.

Maintenance, pre commissioning and start up for the plant.

From July 1995 till June 1996

Project: Assiut Thermal power plant (300 MW) Unit II. Assiut- Egypt

Company: Ansaldo (Italian Co.)

Duties: Maintenance Engineer for

Maintenance and adjustment of mechanical parts during commissioning and start up.

Working and solving all the static checkout (pending points)

From Jan 1995 till July 1995

Project: Assiut Thermal Power Plant (320 MW) Unit II

Company:

ABB Sa Sadelmi (Italian Co.)

Duties:

Assistant Construction Manager.

Waste water plant & Pretreatment plant.

Fuel oil system, Tanks & pumping station.

Fire protection & fire fighting system.

Circulation, Raw, service water system & pumping station.

From 1993 till Dec 1994

Project: Assiut Thermal Power Plant (300 MW) Unit II

Company: ABB Sea Sadelmi (Italian Co.)

Duties: Area Manager for

Fabrication & Erection of piping supports.

Fabrication & Erection of L.P. piping.

Erection of H.P. piping, Condensate polisher system.

Fire Protection & Fire Fighting System (Power House)

Hydrostatic test for boiler, L.P & H.P. piping.

From June 1992 till May 1993

Project: Fabrication for Mahmodia (Power Plant)

Company: Trradco Co. (Egyptian Co.)

Duties: Mechanical Engineer for

Fabrication & painting of steel structure for El Mahmodia and Damnhour power plants.

From July 1991 till June 1992

Project: Damietta thermal power plant (6 100 MW)

Company: Nouva Cimimontubi Co, (Italian Co.)

Duties: Mechanical Engineer for

Fabrication & Erection of piping and piping supports for power house, pipe rack, Demi plant, pumping station and Boiler Area.



Contact this candidate