Post Job Free
Sign in

Manager Project

Location:
Harrisburg, PA
Posted:
December 19, 2012

Contact this candidate

Resume:

PAUL E. DOWLING

*** ******** ******

Hatfield, PA 19440

215-***-****

Email: ***********@*****.***

SUMMARY

Offer broad-base, diverse experience in diverse industries. Able to

contribute as team leader or as hands-on technician. Proficient computer

skills. Expertise includes:

|New Product |Value Engineering/DFM|Facilities & |

|Introduction | |Equipment |

|Documentation Control|Concurrent |Installations |

| |Engineering |CNC Machining/PLC |

|Process |Cost Control/Most |Programming |

|Improvement/Lean |Operations/Project |Tool and Die Maker |

|Vendor Management |Management |Product & Process |

|Mechanical Design |Lean/Six Sigma |Standards |

SPECIAL SKILLS

Proficient in MS Office, Project Visio; AutoCAD, Micro Station,

SolidWorks; PC Gerber, Oracle, Impact (PDM), MFG/PRO; IEC, UL, ISO;

MasterCAM, SpeedCAM, PSpice, Promodel, Maynard Operational Sequence

Technique/MTM, JIT.

PROFESSIONAL EXPERIENCE

Porous Power Technologies (2012-present)

Mechanical Engineer

Working under contract for the COO of a battery technology company.

. Specify, order and install various electromechanical equipment.

. Layout floor plans and utilities.

. CAD

Alan Ritchey, inc. (2005-2011)

Engineering Director

Working under the divisional VP for postal system contractor, responsible

for process improvement and cost reduction in multi-facility logistics and

warehousing environment. Using SolidWorks, MasterCAM, Microsoft Project,

design and build electro-mechanical systems, including robots, servos,

PLC, conveyor, bar code, VFD, sortation and material handling systems.

Developed all infrastructure necessary for design and build process.

Developed necessary process documents and training programs.

. Re-engineered processes at all six company sites assessing operations

/ determining where changes could be made. Convinced site managers of

specific production methods that would be more efficient and cost

effective. Reduced costs 23%.

. Built systems to automate production of selected product lines.

Needed to create an infrastructure to engineer new processes at

Ritchey. Created workable equipment plans for selected product lines.

Purchased necessary equipment for machining, assembly and

installation. Achieved objectives and enabled cut in headcount by

38%.

. Bar codes on the material handling equipment at Ritchey needed to be

removed. The company had been using an expensive, multi-layered label

to cover them. Designed, built and installed thermal equipment to

remove the codes. Saved $500K per year in label consumption.

Solus Industrial Innovations, Aston, PA (2003-2005)

Engineering Manager

For conveyor components (plastics) industry, responsible for product

design and documentation, machining mold and extrusion process, continuing

improvement, tooling, capitol, facilities, NC programming, costing and

network administration. Develop, release and implement policy and

processes for release to manufacture, quality and RMA, preventive

maintenance, product costing. Develop, launch and monitor projects for

lean development, cost reduction and quality improvement.

. Determined, justified and implemented tooling and equipment

requirements, CNC.

. Developed takt time, state maps and pacemaker processes to pull to

customer demand.

. Defined space and laid out facility and work cells for product

specific process flow.

. Purchased automated equipment. Changed floor layout. Upgraded

assembly tooling. Trained personnel on use of equipment. Cut lead

time 50%.

APD Cryogenics, Allentown, PA (1999-2001)

Program Manager

Reduced recurring product cost of new and existing products. Developed

cross-functional team to manage the introduction of commercialized,

manufacturable products through the R&D and operations processes. Reduced

purchase costs and produced favorable PPV. Negotiate primary vendor

contracts and develop strategic vendor resources. Contribute to a

manufacturing environment that concentrates on core competencies. Cut

labor content and establish alternate sources. Provide design and

manufacturing engineering expertise to reduce part count and develop

product modularity of high tech, cryogenic, electro-mechanical equipment.

. Reduced product cost by 25%, and still counting, saving $6.8MM on one

major new product launch alone. Created pricing models projecting

costs into multiple years. Reduced labor costs by 33%.

. Developed partnerships with sister divisions, leveraging resources,

and expertise within the corporation.

. Reduced overall inventory by 30%.

. Developed strategic outsource partners, reducing vendor base by 66%,

instilling trust and win-win relationships with primary suppliers.

Established overall cost reduction from new vendors of 15% while

increasing on-time delivery by 50%. First pass yield increased by 10%.

Developed "pull" from vendor. Reduced product development cycle by

25%+.

. Implemented strategic terms and conditions targeted at vendor-managed

inventory, JIT delivery, and vendor based design. Pooled purchasing

requirements, establishing a strong procurement front.

. Planned, and negotiated numerous multi-years, blanket purchases, each

covering $1MM annually.

. Deployed a vendor audit team to categorization partner capability.

Implemented multiple new strategic processes within vendor sites

. For projects up to $10M, interact with many levels of staff,

management, technical disciplines, customers and venders, to develop

project plans, budgets; staff/resource requirements, schedules; risk

identification and mitigation.

. Formulate and refine scope and objectives, co-ordinate activities of

project team to ensure project progress. Co-ordinate and respond to

requests for changes from original specifications.

. Track, monitor, review, analyze, and report project progress. Promote

effective working relationships.

GENERAL INSTRUMENT, Horsham, PA (1995-1999)

Engineering Manager

Oversaw production department and provided for the early launch of new

products into manufacturing. Seeded market with initial deliveries of

products for the Cable TV industry. Teamed with design group and primary

production facility to identify product reliability and production issues

obtained from actual manufacturing process. Provided early visibility of

new components, tooling and equipment. Created interim product

documentation. Established inventory control and product quality

processes.

. Grew business from intermittent production to $20MM in first year.

. Developed forecast, production plan, staffing requirements and

schedule. Maintained on-time delivery at 98%. Continually improving

quality process produced less than 1% defects.

. Established factory wide continuous improvement teams, saving three

times the department budget. Responsible for multiple factories.

. Developed and implemented product and process documentation for a

multitude of new products.

. Redesigned mechanical package, creating multiple options from common

parts.

. Identified reliability, documentation, and producibility issues.

Provided feedback to engineering and primary factory, expediting

primary factory's start up cycle.

EDUCATION/CERTIFICATION

BS Mfg. Eng., Thomas Edison State College, Trenton, NJ, 3.0 GPA.

AS, Operations Management, Thomas Edison State College, Trenton, NJ, 3.0

GPA.

Certificate, Integrated Resources Manager, Montgomery County Community

College, Blue Bell, PA, 3.0 GPA.

Certificate, Computer Science, Montgomery County Community Col., 3.5 GPA

Dean's List, Magna Cum Laude

Certificate, CISCO Networking Academy, 4.0 GPA.

Certificate, Project Management, Villanova University, Villanova Pa, 4.0

GPA.

Six Sigma Green Belt Training, Drexel, Philadelphia. PA

Member, Phi Theta Kappa, International Honor Society.



Contact this candidate