Post Job Free
Sign in

Project Manager, Engineer, Engineering Management, Risk Management

Location:
Abilene, TX, 79606
Salary:
Negotiable
Posted:
December 18, 2012

Contact this candidate

Resume:

JASON BLEVINS, PMP

************@*****.*** 512-***-**** mobile LinkedIn: http://tiny.cc/lfjkh

Sr. Program /Project Manager

Specialization in the program/project management of design/build and commissioning of energy systems that include wind energy, solar energy,

simple/combined cycle, combined heating and power systems. With panoptic, practical experience of fossil and renewable energy deployment and

generation; emphasizing on schedule, time to market, regulatory issues, environmental responsibility, energy efficiency and economic scales. My

expertise, outside of energy, includes the complete spectrum in telecommunication. From the circuit level design in a SONET network through

design, build, add/drop of colocation and data centers.

My experience in ETRM (Energy Trading and Risk Management) platforms first began in 2007 through the completion of a 5 mW CHP in 2009 with

Turbine Air Systems and for the BP energy trading facility, Helios Plaza in Houston Texas. I then utilized an ETRM while at RobustEnergy in

Austin Texas to capture, in a very broad sense: Front-range or deal capture (project landing), Mid-range or market risk exposure, - End-range or

accounting functions. At RobustEnergy (2009 -2011) we had a BOOM (Build, Own, Operate, & Maintain) business model. When our power plants

are produced an excess amount of power from on-site generation, we utilized ETRM's integrated platform to track and manage the quantitative

energy.

This would allow me to mitigate risk for selling, on grid, excess power in either or a combination of: demand power, peak power, and off-peak power.

The RobustEnergy model not only included customer billing, behind the meter, and the exporting (ERCOT grid) of demand or grid power but also

thermal energy production of steam, hot water and/or chilled water; all being managed energy that are physically moved from source to point of

usage.

Area Expertise

• •

Project Management values of US$1MM – US$250MM National and International regulatory and environmental

• impacts

Multi-faceted/multi-component projects

• Business Development

• Renewable and fossil fuel energy programs

• Power and thermal generation

• Electrical engineering

• Executive presentations

• Proven completion of programs on-time and on-budget

• Public speaking

• Proven ability to work within multi-discipline project layers

• Team building

• Utility level power distribution

• Engineering, Procurement and Construction

• Development of modular product solutions

• Telecommunications

• Proven ability to perform through multi-stakeholder

programs

Professional Experience

March 2012 – November 2012

Schneider Electric

As a Contract Project Manager for the joint US Navy/ Schneider Electric Advance Metering Infrastructure (AMI) in the NAVFAC FE region for the

naval bases in Japan:

• On-site, in Japan’s Yokosuka Naval Base and Atsugi, Naval Air Facility, conduct kickoff-meetings for the AMI program

• Management of this project is from my virtual/home office

• Manage the preliminary design process as it pertains to the solicitation of bids from, internal engineering resources, external installation

contractors and other suppliers.

• Manage all budgets and scope of work for Yokosuka and Atsugi naval bases (US$15,000,000.00+)

• Single point of contact and interface for the US Navy and Schneider Electric

• Ensure all project progress milestones are met: engineering, procurement and construction

• Ensure all milestone payments are invoiced and accounted for, in the contractual payment schedule

• Ensure all documentation: contract changes, delay/control notifications, change management issues, etc

• Ensure all project resources have the ability to gain access to the military installation via government’s Invitational Travel Orders, CAC and

SOFA process

The Advanced Metering Infrastructure (AMI) for Naval Facilities Engineering Command Far East, Japan. The work performed provides for the

design, purchase of equipment, installation of equipment and systems, build, documentation, and testing of an AMI system for the electricity, water,

and steam metering.

January 2011 – February 2012

Park Cross Energy, LLC

Park Cross Energy, LLC to develop energy projects in the United States and abroad. Over the past two years I have educated and advocated for

cleaner power generation. This includes blending power production from wind and solar power generation with natural gas, LNG, CNG or

[renewable] RDF power. Through the educating and advocating of clean, reliable and affordable power, I have spoken in the Dominican Republic,

Trinidad, Grenada, China, and Turkey while capturing the attention of the State of Texas. The message that I bring forward under Park Cross Energy,

LLC, is one that keeps renewable energy progressing forward unchained from the economic incentive of the DOE 1603 grant, while utilizing the ITC

and REC or WEC incentives.

This innovative message has been well received from the US Military, City, State and County officials over the past years along with my strategic

alliances with financial entities that are able and willing to provide 100% project funds via traditional land non-traditional loan avenues.

The goal is to be innovative in engineering and breaking down the barriers between power generations specific fields. In the educating and

advocating realm of Park Cross Energy, LLC specific tasks include regulatory and economic issues, constructability, (including estimations),

negotiations with the major rotating gear manufactures on pricing, EPC negotiations from the solar manufactures, financial sustainability (IRR and

ROI), environmental sustainability.

August 2009 – January 2011

RobustEnergy – VP of Project Manager (Start-up Company July 2009)

• Provide technical assistance to customers on combined heat and power (CHP) and the benefits of

• Created presentations in PowerPoint and bound hard copy for City and State officials along with private end-users/owners for US, China,

Turkey,

o Initiated and performed “lunch and learns” for the likes of PSP, Geotting and Associates, and Zachary

o Presentations for development with City Council and Government officials in the US and abroad

• Engaged in power purchase agreements (PPA) with utilities or retail electric providers (REP)

• Utilizing resources assigned and procured services of the general contractor, electrical/mechanical contractors, controls contractor,

engineering contractors, equipment suppliers, etc.

• Equipment selection from major mechanical down to lv/mv switchgear and controls systems

• Provided all drawings associated with conceptual engineering, this included site layout, electrical one-lines, and P&ID’s in AutoCAD MEP

2010

• Provided process flow diagrams (PFD)

• Adhered to al Public Utility Council of Texas (PUCT), ERCOT, SPP zones and territories for exporting power to the grid

• Provide work breakdown structures (WBS) for conceptually engineered projects and preliminary schedule utilizing MS Project and

Primavera P6

• Provide the preliminary scope of work (SOW) for RFP process to vendors (all disciplines and inclusive of engineering services)

September 2007 – August 2009

Turbine Air Systems - EPC Project Manager (~5MW CHP – 1350TR )

• Provide assistance to the Commercial Support Department in providing construction cost interface from the Installation Contractor.

• Manage the preliminary design process as it pertains to the solicitation of bids from Installation Contractors and other suppliers.

• Use of Solar Turbines efficiency program to determine the efficiency calculation n of the turbine incorporated with the Trane Chillers

performance software to

• Provide guidance to Sales and Commercial Support in the fine-tuning of the project scope and pre-award budgets.

• As the Project Manager, I am utilized in the contract pre-award stage to ensure clear definitions of project scope of work, schedule and

appropriate budget control.

• Participate in proposal clarification meetings held between the Company and prospective clients as needed.

• Primary focal point for project written and verbal communication between the Company and the customer.

• Responsible for internal distribution of all project related documentation for review and revisions as required.

• Interact with suppliers on all scope, cost, contractual, and schedule issues. Responsible for orchestrating the internal resources needed in

support of project execution (i.e. Production Systems Inventory, Document Control, QA/QC, Fabrication, Engineering, Field Service and

After Market)

• Conduct weekly, bi-weekly and monthly individual project budget reviews and prepare forecasts to completion. Budget performance is

reviewed monthly on a 1-on-1 basis w/ the CFO and Finance

• Solicit and review project specific accounting data for budget analysis and forecasting purposes.

• Assume full Customer interface for construction issues.

• All field construction documents and schedules are promptly issued to installation contractors after receipt of order.

• Field all inquiries from the Customer and the Customer’s contractor

• Assist in Accounting in invoice collections, attempting to maximize our leverage between payments to our installation contractors and

suppliers, and invoicing to our customer.

• Protects against creep of the project scope through budget awareness and the use of change orders.

June 2006 – August 2007, Hilliard Energy (Contract)

Sr. Electrical Engineer (Wind Turbine Development and Transmission)

Configuration/calculations of ATC using manual calculations and software (Power World ATC/OPF)

Agency interface with ERCOT, SPP, SERC, etc.

Interface with infrastructure owners for information determining upgrades to existing systems

Export potential of transmission lines (69, 138, 345kV, etc.)

Customer customizing of determinable power for residential turbines (10 -50kW) “on grid” or net-metering

Interconnection feasibilities and/or research

Review of metrological data for determination of planned sites

Review of environmental data for impact studies of planned sites

March 2006 – May 2006, Flow Jamaica (Contract)

Design Engineer (Jamaica, Bahamas, and Trinidad)

Wrote algorithms for exporting multiple design signals through single strand of Fiber (i.e. cable TV, dial tone & i-net)

Created design specs for Fiber Optic, RF and Hybrid operations for a startup company (triple-play), Flow Jamaica, Cable Bahamas

and the start up in Trinidad.

Input of design specifications and limits into Load Data and AutoCAD (2006) application for RF design

Created installation manual for OSP aerial and OSP buried for company.

Avaya protocol and specifications for PBX installation

July 2003 – January 2006, Ameriss Corporation, New York City and Dallas, TX

Mid - Atlantic Project Manager (Verizon)

Wrote/responded RFP for Mid-Atlantic on behalf of corporate

Created and issued capital projections for each assigned OSP project(s)

Reviewed and coordinated due diligence of each OSP project(s)

Corporate P&L responsibilities for region

OSP Engineering process written and approved by customer

Milestone/Timeline management of CAD Drafting Department (Micro-station and AutoCAD)

Milestone/Timeline management of Engineering Department

Development of satellite office model for ease of opening offices

Maintained reporting structure and development of such for “customer” and “corporate”

Twice weekly teleconference with Suzhou, China manufacturing plant

On-site milestone/schedule meeting 10 days every quarter for our Suzhou, China manufacturing plant

October 2001 – May 2003 AES, Dominican Republic

Design Engineer – Two (2) 350MW LNG plants w/ 65 KM of 24” pipeline

Construction Project Manager – Two (2) 350MW LNG plants w/ 65 KM of 24” pipeline

September 2000 – August 2001 Fiber Net, New York City

Central Office/Data Center Design Engineer (ISP)

July 1998 – September 2000 AT&T New York City

SONET Design Engineer

1995-1998 CMI (Nationwide)

QA/QC fiber-optic design/construction inspector (Level 3 and Nextlink)

Education and Certifications

BSEE, University of Texas -1995 (3.2 GPA)

Non-Destructive evaluation, Visual Testing (NDE/NVT) and Radiography Testing (RT) 2001

Micro-station IDDS/ICGS certification 2004

AutoCAD certification, Westwood College 2004

PMP (Project Management Professional) includes RM (Risk Management) certification, Villanova University 2005

OSHA 10-Hour Card

SOFTWARE PLATFORMS (short list) Rating = 10 being expert

MS Project 9

MS Visio 9

AutoCAD (r.14 – MEP 2010) 9

Primavera Engineering & Construction 7

Google Sketch Up 3-d Rendering 7

eQuest DOE Energy Modeling 8



Contact this candidate