CURRICULUM VITAE
Rejeesh raveendran
Kerala (State), India
Telephone No: +91-894******* (mob India),
Email Id: *********@*****.***
[pic]
Objective: - Having +8 years in Inspection & Quality Control including
supervision & coordination, inspection and responsible for Offshore and on
shore quality control activities to confirm that they comply with specified
procedure or Client requirement.
Technical Qualifications :-
. NACE Coating Inspector Programme Level -I in January 2009.
. NACE Coating Inspector Programme Level -2(marine) in January 2010
CIP CERTIFICATION NUMBER: 21420
. P.D.O (Petroleum Development of Oman) approved Painting Inspector.
. Saudi Armco approved coating inspector
. Painting inspection programme- IQC Chennai IN 2009 December.
Academic Qualifications:-
. B. Sc Industrial Chemistry from Kerala University 2002.
. Diploma in Industrial Safety from Annamalai University.
Driving license:- Having International Driving license.
Computer Proficiency: Diploma in Computer Applications
. Well versed with Ms Office (Ms Word, Ms Excel, Power point)
WORK EXPERIENCE
[pic]
CURRENT WORK EXPERIENCE
1. ENI SAIPEM, Italy - Oil and Gas construction company
Period : September 2011 to November2012.
Designation : QA/QC Inspector Painting/Coating
Industry : off shore (Oil & Gas Industry)
Client : Saudi aramco
2. BUREAU VERITAS - Third party Inspection Company
Period : May 2011 to August 2011
Designation : QA/QC Inspector Painting/Coating
(Third party inspector In Saudi Arabia)
Industry : Oil & Gas Industry
3. AL TURKI ENTERPRISES L.L.C, Muscat, Oman
Period : May 2009 to December 2010.
Designation : QA/QC Inspector Painting/Coating
Industry : Oil & Gas Industry
Client : Petroleum development of oman
4. Airtech Engineers, India
(Protective coating industry)
Duration : January 2005 to April 2009
Client : SUZION T.P.L (Tata Projects Limited)
Position : QC Painting Inspector
Duties & Responsibilities
. Implementation and monitoring of Contract Quality Plan, Quality control
Plan, Quality work Procedures and Work Instructions
. Inspection and verification of the activities at relevant stages as per
the approved Quality Control Plans, Contract Quality Plans
. Monitoring effective implementation of relevant stages as per the
approved Quality Control Plans, Contract Quality Plans.
. Responsible for monitoring all parameter during blasting and painting.
. Verification of calibration of all measuring & testing equipments
pertaining to each activity.
. Ensure that the raw materials used for work are in compliance with
specified requirements through receiving inspection.
. Verification of abrasive type, size and trade mark as per the
specification
. Carrying out routine checks on spray pumps blast pots and other related
equipments.
. Carrying out routine checking of Equipments like quality of air supply
from air compressors, discharge pressure of blasting equipments,
pressure ratio & tip size of spraying equipments (Conventional/ Airless
spray pump)
. Ensure that paint system is selected as per the specification,
maintaining the WFT and DFT as per manufacture's data sheet and
recommendations.
. Monitoring the storage, handling, shelf life and mixing ratio of paint
consumables.
. Checking and recording of weather condition like Relative humidity, dew
point, lighting, wind speed, dust, sand, fog, mist, moisture on surface
etc.,
. Surface condition prior to blast cleaning & after blast cleaning.
. Ensure that Dry abrasive blast cleaning; Hand & Power tool cleaning is
achieved as per International standards.
. Ensure the protection of other surfaces like valves, gauges, name plates,
and weld joints, etc., by masking it during Blasting & painting.
. Checking of visual defects like cracks, runs, sags, wrinkles,
brush/roller marks etc.,
. Testing of Presence of Salts & Chlorides, Dust, Moisture, Oil & Grease,
Holiday Pinhole detection. Viscosity, WFT, DFT, Adhesion, Hardness,
Opacity, Cross Cut, Coverage, etc.
. Following safety rules during the work and conducting tool box meeting
for the work force daily to work safely by avoiding all potential and
direct hazards.
. Train the Painting Supervisors/Foreman on Quality control plans.
. Carrying out the scheduled audits of Projects activities or of the
quality System elements
. Identification of the non-conformances at any stage of the execution.
. Investigating, analyzing and reviewing the cause for the non-conformances
and to provide the support to the site engineers to implement the
identified corrective/preventive actions
. Monitor subcontractors activity as per the subcontractors approved
contract quality plans, and their performance.
. Compilation of Test packs as per client requirements and obtaining
approval by client.
. Liaise with site manger/works coordinator and client inspection personnel
regarding quality matters.
. Provide feedback to Sr./QA Engineer of all quality related matters.
Major Project completed
. Off Plot delivery contract No'C/31 0604,(cross country pipe line)
Painting/Coating of underground and above ground oil flow lines at Nimr,
Marmul & Bhaja area for Petroleum Development of Oman.
. Painting/Coating works of Under Ground and Above Ground Pipe lines and
steel structures for Amal Steam Project in Amal fields' area for
Petroleum Development of Oman.
. Painting/Coating works of Above Ground Pipe lines and steel structures
for Marmul flooding project for Petroleum Development of Oman.
. Nimr NWTP Project - Installation of 18" GRE pipe line and on plot
painting activities 10 Km.
. On Plot Painting activities in Budhur NE-1 & NE-2 & Heat Shrink sleeve
application for Budhur to Birba Project, 10" Pipe line 21 Kms.
. On Plot painting activities in Rima Gathering Station & STOPAQ coating
application for Road Crossings and Wadi crossing for Maha - Rima projects
11.5 kms.
. Rehab Heat Shrink sleeve application (FJC) for Project, 6" Pipe line 20
Kms.
. Nimr integrity Project for stopaq coating application(FJC) for
underground pipe line (EPC Project)
. Coating Inspection of vessels.
. Painting of all off shore structures, decks,jacket
. Jacket installation (Arbi-7, Arbi-6,zulf) projects in Saudi Armco oil
field(Off shore)
. Deck installation projects in Saudi Armco oil field.(off shore)
. Coating Installation and inspection for 10 inch pipe line ARBI field(off
shore Aramco)
Nature of Work
A) Ambient condition checking ( Dry bulb, Wet bulb, Surface Temp, Dew
point and Relative humidity)
B) Blasting Profile, Salt contamination, Dust contamination and Surface
cleanliness checking as per specification.
C) Dry Film Thickness (DFT) for the each coating.
D) Preparation of Inspection request.
E) Check the correct painting system is applied as per data sheet.
F) Document the batch no of the painting system.
G) Visual inspection of the painted components.
H) Holiday / Pinhole inspection.
I) Adhesion test for new batch of the coating material.
J) Report preparation for the painted components.
Exposure to Instruments
. Environmental Test Equipment (Ambient condition checking)
(Sling Psychrometer & Surface Thermometer)
. Surface profile checking (TESTEX -TAPE)
. (Anchor pattern comparator, Replica tape & Micrometer)
. Salt contamination checking. SCM 400
. Soluble salt contamination test : Bresle Patch test)
. Coating thickness - Magnetic / Electromagnetic Gauges.
. Holiday / Pin hole Detector (High Voltage / Low voltage)
. Pull-off Adhesion - Dolly test.
. Tape test - Adhesion tester (X cut and Cross hatch adhesion)
LANGUAGES KNOWN:
English : Fluent (Speak read and write)
Hindi : Fluent (Speak read and write)
Malayalam : Fluent (Speak read and write)
Tamil : Speak.
SAFETY TRAINING & OTHER COURSES COMPLETED
. H2S Awareness & Escape
. Basic Life Support
. STOP Observation
. Health Safety Environment Policy
. Leadership Motivation Programs
. Opito training
. Valid seaman book.
EXTRA CURRICULAR ACTIVITIES
. Participated in Scouts & National Service Scheme in School and college.
STRENGTH:
. Working with Commitment & Dedication Willingness to learn & prosper
Personal Details:-
[pic]
Date of Birth : 28th May 1981
Nationality : Indian
Marital Status : married
Passport Details:-
Passport No : K4827099
Date of Issue : 27/11/2012
Date of Expiry : 26/11/2022
Place of Issue : Trivandrum, Kerala,
Declaration
I hereby declare that the information furnished above is true and
correct to the best of my knowledge.
Place : India (Rajeesh. R)
Date : [pic]