Post Job Free

Resume

Sign in

Welding Inspector Project

Location:
Jiddah, Saudi Arabia
Salary:
negotiable
Posted:
December 13, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

Mohammed Sameel

E mail : abgk0s@r.postjobfree.com

Mobile :+91-974*******

OBJECTIVES:

Work sincerely & honestly to the best of my ability and potential in order to excel in a

Challenging and dynamic profession by contributing to the overall growth of the

Organization.

EDUCATION, TRAINING & QUALIFICATION HIGHLIGHTS:

AREA DETAILS

Technical Education Diploma in Mechanical Engineering with First Class

Qualification

(Technical Board of Tamilnadu)

American Welding Society (AWS) – Certified Welding Inspector

AWS –CWI (CWI)

Certification

Cert. No. 09123731, Expiry: Dec 2012

Certified Scheme for Welding Inspector Personnel

CSWIP 3.1 Certification Cert. No.49274, Issue date: 14/09/2010

Expiry: 13 August 2015.

Qualified ASNT NDT level II for the following Disciplines.

Radiographic Testing

Ultrasonic Testing

Training

Magnetic Particle Testing

Penetrant Testing

Page 1

Radiographic testing and Film Interpretation

(Metal scan Inspection Service Cochin,as per ASNT SNT TC 1A

2001)

WORK EXPERIENCE HIGHLIGHTS:

PROJECTS WITH HARRIS PYE MARINE LTD.JUBAIL.

PERIOD : OCT 15TH TO DEC 5TH 2012

CLIENT : AR RAAZI (SABIC)

COMPANY : HARRIS PYE MARINE LTD.

POSITION : QA/QC WELDING INSPECTOR

PERIOD : SEP 12TH 2012 TO OCT 1ST 2012

CLIENT : AR RAAZI (SABIC)

COMPANY : HARRIS PYE MARINE LTD.

POSITION : QA/QC WELDING INSPECTOR

PERIOD : AUG 20TH 2012 TO SEP 10TH

CLIENT : SWCC. JUBAIL

COMPANY : HARRIS PYE MARINE LTD.

POSITION : QA/QC WELDING INSPECTOR

PERIOD : JULY 1ST 2012 TO AUG 15TH 2012

CLIENT : SAUDI CHEVRON PHILIPS (SCHEM).

COMPANY : HARRIS PYE MARINE LTD.JUBAIL (KSA)

POSITION : QA/QC WELDING INSPECTOR.

Page 2

JOB DESCRIPTION

Study the scope of boiler repair work

Check review drawings

Check &Review WPS,PQR,ITP and calibration certificates

Check the welding activities before,during and after welding

Maintaining & updating welder’s continuity record by collecting required data

Conduct the inspection activities as per the inspection test plan(ITP)

Co ordinate NDT personnel according to scope of work.

Co ordinate NDT personnel to mark the weld location and weld joint number.

Conduct RT,PT, if required

Mark and explain the location for detecting the defect of the material in case of any repair.

Ensure the repair activities, as per the repair procedure

Prepare summary sheet as per Harris Pye procedure.

Witness hydro test with client during hydro test.

Submit final QA/QC document to the client.

PERIOD : MAY 2011 TO MARCH 2012

COMPANY : BINDU STEEL FABRICATORS PVT. LTD.

THURBHE, NEW BOMBAY INDIA

POSITION : WELDING INSPECTOR

JOB DESCRIPTION

• check and review welding procedure specification(WPS) and procedure qualification record

(PQR)

Supervises welding operations and precautionary measures adopted by the welders.

Page 3

Carry out scheduled programs and inspection and monitor progress.

Conduct Material inspection as per standards.

Check documents of Drawing, welding Procedure, Welder Qualification and Project

Specification.

Check the fit/up as per the project specification.

Monitor the welding activities as per Project Specification.

Visual Inspection of weldments.

Supervise NDT Technicians for various types of NDE methods. Mainly ultrasonic testing

methods as per AWS D1.1, ASME and ASTM codes

Follow up the NDT & related heat treatment as per the Project Specification

PERIOD : FEBRUARY 2011 TO MARCH 2011

CLIENT : SASREF(SAUDI ARAMCO SHELL REFINERY COMPANY)

TURNAROUND SHUTDOWN.

COMPANY : ARABIAN PIPELINE &SERVICES (ANABEEB)

POSITION : QA/QC INSPECTOR (MECHANICAL).

PERIOD : DECEMBER 2010 TO JANUARY 2011

CLIENT : TASNEE (SABIC) SHUTDOWN

COMPANY : ARABIAN PIPELINE &SERVICES (ANABEEB)

POSITION : QA/QC INSPECTOR.

JOB DESCRIPTION

Install spades as per spading list.

Open manhole; ensure that all flange faces are protected from any damage.

Magnetic particle inspection and penetrant testing for pressure vessels. The materials

were carbon steels, alloy steels, and stainless steel.

Install portable air driven blower exhausters at all manholes and ventilate for at least 2 hrs.

Page 4

Disconnect level gauges and level transmitter including isolation valves, and bring to

ground.

Water wash (hydro jetting) clean internally. Vacuum out sludge.

Clean all level gauges and level transmitter including isolation valves on ground.

Clean all flange faces and apply anti seize compound on studs, bolts, and nuts.

Involved in visual inspection, radiographic film interpretation

Observe and ensure all activities are meeting the safety requirements

Ensure all works are complies with the requirements of the approved quality control plan

Reinstall all level gauges and level transmitter including isolation valves.

Box up all manholes, and ensure all gaskets are changed or not.

Despading.

Evaluated NDT requirements on a daily basis

Evaluation and Interpretation of NDE Examination

Review isometric drawings, and work request

PERIOD : JANUARY 2010 TO OCTOBER 2010

COMPANY : HIDADA LIMITED .JEDDAH,(KSA)

POSITION : WELDING INSPECTOR.

JOB DESCRIPTION:

Assisting welding Engineer in discharging his responsibilities.

Monitoring & control of shop welding activities.

Measurement of welding parameters on daily basis & recording in logbook.

Ensuring proper implementation of WPS requirements like use of correct welding

consumables, pre heating of job, electrode baking

Ensuring deployment of qualified welders / welding operators as per job requirements,

WPS & welding position.

Maintaining & updating welder’s continuity record by collecting required data.

Page 5

Monitoring WQT & PQR test along with third party inspector and monitoring / recording in

house welder’s qualification tests.

Weld visual inspection on daily basis.

Calibration check of welding equipment in the shop floor.

Helping NDE inspector for PT & MT in case such workload is more

PERIOD : JUNE 2009 TO NOVEMBER 2009

COMPANY : BINDU STEEL FABRICATORS PVT. LTD.

THURBHE, NEW BOMBAY INDIA

POSITION : WELDING SUPERVISOR

Assigned to new construction jobs and shut down jobs in various petrochemical as well as chemical

industries.

Perform various welding activities associated with the cutting, fitting,

Install items that have been fabricated; as assigned, instruct and oversee other employees in the

installation process of fabricated items

Operate equipment and power tools, including arc welding and gas welding equipment, grinders.

Complete and maintain record of work performed and materials used.

Read, understand, and ensure compliance with the Safety Manual.

Attend safety meetings, as required; report all accidents, violations, or infractions to supervisor.

SOFTWARE EXPOSURE

Page 6

Operating Systems : Windows 9x/ME/2000/NT/XP

Other Software & Tools : Microsoft Office (Word, PowerPoint, Outlook),

CODE & STANDARDS

ASME SEC IX, ASME B 31.3, ASME 31.1

PERSONAL PROFILE

Name : Mohammed Sameel K.

Fathers name : Abdussamad Kundattil

Permanent Address : Kundattil House, Panangangara, P.O. Ramapuram, Malappuram

Kerala State Pin. 679 35, INDIA

Gender : Male

Nationality : Indian

Languages Known : English, Hindi, Malayalam and Tamil

PERSONAL APTITUDES:

Dynamic and self driven with high energy levels.

Systematic.

Achievement oriented, good interpersonal skills and a team player.

Time and task oriented.

Excellent learning abilities and able to adapt quickly to new environments and new roles.

Able to work under pressure / stress.

Page 7

DECLARATION

I consider myself highly familiar with Mechanical Aspects and I am in full confident of my ability to work

in a team.

I hereby declare that the information furnished above is true to the best of my knowledge and belief.

Mohammed Sameel

Page 8



Contact this candidate