Personal Details;
Name: Bong Kuek Chin (Patrick)
Address: ****, ***** ******, *********, **
Contact: *************@*****.***
Phone: 778-***-**** and 604-***-****
Profession Civil Engineer
Specialization Project Management and Construction
Supervision of works
Position in company Project Manager/Resident Engineer
____________________________________________________________________________
______
Key Experience : 26 years overall experience in
design, management, supervision of Roadwork,
Earthwork, Civil-infrastructure, Drainage, Reinforced
concrete structures (building, bridge and marine
structures) and underground utility works. Familiar
working in consulting and construction environment,
Client/Architect, Authority and Contractor liaison,
good analytical skills in solving site related
problems. Computer skills: MS Word, Excel and Project.
Conversant with Design and Build Contract, FIDIC
Condition of Contract and CESMM3.
____________________________________________________________________________
______
Qualification: B Sc Civil Engineering, Texas Tech
University, USA - 1985
Membership : Member of American Society of Civil Engineer (ASCE)
Graduate Member, Board of Engineer Malaysia (BEM)
Languages Ability English Fluent
Mandarin Intermediate
Driving License: Class 5
____________________________________________________________________________
_______
Duties include:-
- Plan, develop, coordinate and manage Roads, Earthworks, Drainage, Civil
infrastructure, Concrete structures and underground utility projects.
- Quality Control Supervision of all works activities on site including
concreting works, Piling works and premix laying, quality control test
includes Marshall tests, Asphalt coring, CBR, Nuclear field density,
proof rolling,concrete cube test, pile
load testing
- Develop and implement quality control programs.
- Prepare and submit construction project budget and estimates.
- Checking of site manpower/plant/machinery adequacy and comment/advise on
area of deficiency, work slippage and deployment schedule, certification
of contractor's progress claim, preparation of progress report, change
order and correspondence to contractor and client.
- Plan and prepare construction schedules and milestones and monitor
progress as per established schedules.
- Chairing progress meeting and recording of minutes of meeting.
- Conducting toolbox meeting, in charge of keying in and signing off daily
timesheets, keeping records of site diaries, reports, extra work order,
and application/renewal of work permit.
- Occupational Health and Safety, KPI, traffic management and policy
implementation.
- Assessment of extension of time for Client's approval.
- Approval of Contractor's shop drawings, RFI and RFA forms.
- Confer with Clients and other members of engineering team to decide about
project requirements.
- Management of Multiple project sites. Team leader to Project Engineers,
Foremen, Surveyors and more than 100 co-workers and also regional office
management work.
- Site construction planning, Client, Authority, Consultant and sub-
contractor liaison to ensure smooth running and timely completion of
projects.
- Site troubleshooting including dealings pertaining to technical and
design matters.
- In charge of QA/QC and Supervision of subcontractors' work to ensure
quality control is maintained.
- Reviewing and checking of progress reports and works program prepared by
Engineers and progress payments submitted by Estimators.
- Preparing estimates and procurement of site/building materials.
- Contract administration and preparation of Sub contract agreement
- Attending technical and progress meeting with Client and Consultant.
- Preparing and negotiating change orders, contract revisions with
consultants and clients.
- Tendering and bidding for projects.
- Overall implementation of projects and reporting to Director.
LNB Construction
2012
Project Superintendent
KEO International
2011 to 2012
Project Manager/Resident Engineer
Halcrow International 2007 till 2011
Resident Engineer
JASA Consulting Engineers Pte Ltd 2005 - 2007
Resident Engineer
Ranhill Consulting Engineers Pte Ltd 2001 - 2004
Resident Engineer
HSL Construction Pte Ltd
1999 - 2001
Project Manager
SPM Construction Pte Ltd 1995 - 1999
Project Manager
Specs Consultant 1992 -1995
Resident Engineer
KTA Consulting Engineers 1986 - 1991
Civil/Design Engr.
LNB Construction
. Earthworks for Core building and Ball diamond at Fort Mc Kay, Alberta,
Canada: CAD 3 Million
Sub Contract work for Site Clearing, Stripping of top soil, Excavation,
filling and compaction of 35,000 m3 of Earthwork for Water tank pad,
access road, Core building platform and Ball diamond.
KEO International Consultants.
. Ceremonial National Road,-USD 156 Million
Fast track Design and Build Contract of 10 Km of 5 lane dual carriageway
highway consisting of Earthworks (Rock Drilling) and Blasting works,
Construction of 6 Structural Bridges, 12 km of service road, 40 Km of
Curbs and Vehicle barrier unit, Guardrails, 20 Km of footpath, 18 Km of
5 m wide bicycle track, grading and filling of 22 Land plots, 11 Hydro
sub-stations, Landscaping, Civil Infrastructural Works such as Surface
Water Drainage, Potable water distribution network, street lighting,
traffic furniture, installation of speed and surveillance camera system
and hydro cable laying/protection work.
. Additional Work to North Road-USD 85 Million
Design and Built Contract of 28 Km of Major and local distributor Roads
with 11 new signalized junctions, 6 roundabouts and related
infrastructural services such as Storm water drainage, treated sewerage
effluent line, hydro cable installation and relocation, telecommunication
infrastructural works and installation of traffic furniture.
Halcrow International Partnership
. EPCC Contract for Water Conveyance System- Jordan US$ 1 billion
Construction of 300 km length of 1200mm diameter steel water pipeline
from Disi well field to Amman including Construction of 5 pump stations,
4 reservoirs tanks, collector tanks, operational and maintenance
buildings and associated works.
. Roads and Drainage - US$ 56 million
Civil -Infrastructural works comprising of 40 km of Roads/Highway,
parking, Curbs, footpath together with associated utilities and services
including potable water pipelines, telecommunication ducts, Hydro cable
laying and relocation, deep trench excavation for surface water and
sewerage drainage system using pipe system including micro tunneling, 2
pumping stations, rising main and construction of 5 km of dual
carriageway.
. Roads and Drainage -$30 million.
Civil-Infrastructural works comprising of 16km of roads and highway,
parking, curbs and footpath together with associated utilities, deep
trench excavation to install surface water drainage system, potable water
pipelines and sewerage system.
. Construction of Access Road to fill station-$2 million
700 m of DBM paved Road including widening of adjoining highway from 4 to
5 lanes to facilitate for an accelerating and deceleration lane,
installation of 26m span gantry sign and associated works
. Roads and Storm water Drainage - $30 million
Civil-infrastructure works comprising 18 km of roads, 20 km of deep
trench storm water drainage, 10 km of sewerage drainage, micro tunneling,
construction of pump stations, installation of potable water pipeline and
services relocation works
JASA Consulting Engineers Pte Ltd
. Drainage Scheme, Miri Division-$4 million.
Drainage/dredging and Berm works covering a development area of 900
hectares including construction of 3 number of bridges, 2 numbers of
tidal gates and Operational and maintenance buildings.
. Agriculture Department office Complex-$6 million
Earthworks, Construction of 3000m2 Reinforced Concrete building with car
park and associated Civil-Infrastructural works.
Ranhill Consulting Engineers Pte Ltd
. Youth and Women's Bureau Building - $6 million
Earthworks, Construction of Double storey RC linked emporium
covering floor area of 10,000m2
Including a hall using 20m span timber framed roof truss system and
associated Civil and Infra-
Structural Works.
. Social Welfare and Orphanage Building - $9 million
Earthworks, 9 blocks of RC buildings including a semi-circular
shaped Administrative unit, 30 m span
Steel frame multi -purpose hall, 5 storey Dormitory building and
associated Civil-Infrastructural
Works
HSL Construction Pte. Ltd.
. Sanitary Landfill -$7 million
Site Clearing, Earthwork, Excavation of 4 landfill ponds including
dewatering, installation of lining membranes, leach ate pipeline, Pump
station, Operation and Maintenance building and access Road.
. Secondary School Building-$13 million
Earthworks, 4 blocks of Reinforced concrete 5-Storey classrooms,
multi-purpose hall, workshop,
Library, Canteen, Science laboratory, tennis court, football field,
asphalt paved car park/access road
And associated Civil-Infrastructural works.
. General Hospital Building-$25 million
Reinforced Concrete Building works including 3 blocks of 7-storey
medical and residential buildings,
Civil-Infrastructure works and Earthworks using pumped sand from
river.
. Genting Highway-$ 7 million
Site Clearing, Earthworks, Slope protection works, Construction of RC
Bridge using Pre-stress concrete, Drainage Work and 6 km of asphalt
paved highway complete with road furniture.
. River Improvement Works-$ 15 million
7 m span x 1 km RC walkway on both sides of river banks with
floating jetty, landing facilities.
Construction of structures using Precast Concrete spun piles and
steel box/Sheet pile and dredging
Works.
SPM Construction Private Limited
. Link Highway-$ 23 million
Site Clearing, Earthwork, 4m high RC retaining wall, 3 km length dual
Carriageway highway with interchange Complete with road Furniture, slope
protection and reinforced concrete drainage works.
. Lambak Kanan Industrial Estates-$18 million
Site Clearing, Earthworks, installation of vertical drains, steel tube
piling, soil stabilization, Road works and associated Reinforced Concrete
Drainage structure.
. Link Highway-$25 million
Earthworks, slope protection works, 3 km asphalt dual carriageway highway
complete with roundabout, road furniture and associated concrete drainage
work.
. Resettlement Scheme-$17 million
Site Clearing, 2.4 million m3 of earthworks, slope protection, soil
stabilization works, Roads and associated drainage works.
SPECS Consultant Private Limited
. Royal Naval Base - $44 million.
20,000 m2 of Jetty with 80 tonne synochrolift facility and 5 nos of
25 m high x 35m span steel shipyard structures.
. Royal Naval L-Shaped Jetty - $ 10 million
3000 m2 Jetty with floating landing facility, fenders and bollard
installations.
. Commercial Port-$ 20 million
15,000 m2 of 250mm thick Grade 40 Reinforced Concrete deck on 300mmx
300mm RC piles, fenders, crane and bollard installation and MEP/Generator
rooms.
KTA Consulting Engineers
Project Values ranges from $300,000 to $ 6 million
- Design of various Civil-Infrastructure, Drainage works and Roads in
accordance to AASHTO.
- Design of Reinforced Concrete Structures including Buildings and Jetty
in accordance to BS Standard Codes.
- Preparation of Tender Documents, Contract specifications and Drawings.
- Office documentation and administrative works.
- Supervision soil investigation works and interpretation of soil data.
Professional Career:
PROJECTS COMPLETED
Testimonial upon request.