Ki-Hyun KIM
Coating inspector
Republic of Korea
Overview : «The limit of ability is decid by oneself »
Over 10 years of diversified experience in the shipbuilding, paint maker, shipyard Quailty & production
team with emphasis in the last 4 years paint/coating supervisor in the new building project of chemical
tanker(pspc), LPG gas carrier, special tanker.
Has employment history of holding responsible position, including inspections, Team Leader, supervisor
and inspector in STX Offshore & Shipbuilding and Hyundai Heavy Industry (south Korea).
Work Experience
PPG SSC CO.LTD - Korea – COATING INSPECTOR
11-2012 to Present
OFON(Nigeria) PROJECT(Q486) TOPSIDE / Hyundai Heavy Industries / Off-Shore
■ Inspection and Quality control of Paint(Block stage / Assembly stage)
- Block inspection of surface preparation, painting application, repair, final inspection
■ Inspection method:
Environmental conditions(ISO 8502-4), Abrasive testing(ASTM4940), Cleanliness(SSPC VIS1), Salt test(ISO/TR 15235),
Roughness/surface profile(ISO8503-5), Holiday detection for internal of vessels only(NACE RP01),
Dry film thickness(ISO19840), Pull-off test(ISO4624), Curing test for IOZ primer(ASTM D4752)
■ Monitoring
■ Reporting
Bureau Veritas (NC & TECNITAS) – Korea – COATING SUPERVISOR 01-2011 to 10-2012
DENSA Newbuilding Project / STX Offshore & Shipbuilding / Bulk Carrier (PSPC)
58K Bulk Carrier x 4 Ships
83K Bulk Carrier x 2 Ships
181K Bulk Carrier x 1 Ship
■ Inspection and Quality control of Paint
- Giving essential guidance/ training for adequate practices/methods of blasting & Paint Appli cations, to achieve optimum
level of Product quality
- Monitor performance of Blast and Paint/Coating condition.
- Surface preparation in block stage & D.F.T & FINAL inspection, W.B.TK & Fresh Water TK & Survey after seatrial.
■ Production control & safety/inspection Equipment
- Use inspection equipments (DFT gauges, WFT gauges etc)
- Test for water-soluble chemical salts contamination (ferrous and chloride ions) on the substrate
- Attend job safety analysis meetings to ensure necessary quality
■ Drawing Approval
- Approval of specification, ITP (inspection test plan)
■ Reporting to ship owner’s representative
- Able to read and understand specification, identify its required documents, records, inspection procedure and filing
- coating/painting faults/ failure analysis
- NCR(non confirm report) after sea trial
CV – Ki-Hyun Kim Page 1 of 5
SCHULTE MARINE CONCEPT LTE. – Korea – COATING SUPERVISOR 07-2010 to 01-2011
PRIME MARINE Newbuilding Project / Hyundai Heavy Industries / LPG Gas carrier
3,5000 CBM LPG Gas Carrier x 2 Ships
■Inspection and Quality control of Paint
- Giving essential guidance/ training for adequate practices/methods of blasting & Paint Applications, to achieve optimum
level of Product quality
- Monitor performance of Blast and Paint/Coating condition.
- Surface preparation in block stage & D.F.T & FINAL inspection, W.B.TK & Fresh Water TK & C.O TK Survey after
seatrial.
■ Production control & safety/inspection Equipment
- Use inspection equipments (DFT gauges, WFT gauges etc)
- Test for water-soluble chemical salts contamination (ferrous and chloride ions) on the substrate
- Attend job safety analysis meetings to ensure necessary quality
■ Drawing Approval
- Approval of specification, ITP (inspection test plan)
■ Reporting to ship owner’s representative
- Able to read and understand specification, identify its required documents, records, inspection procedure and filing
- coating/painting faults/ failure analysis
- NCR(non confirm report) after sea trial
SCHULTE MARINE CONCEPT LTE. – Korea – COATING SUPERVISOR 07-2009 to 06-2010
PRIME MARINE Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker (PSPC)
74K Chemical Tanker x 4 Ships
■ Inspection and Quality control of Paint
- Giving essential guidance/ training for adequate practices/methods of blasting & Paint Applications, to achieve optimum
level of Product quality
- Monitor performance of Blast and Paint/Coating condition.
- Surface preparation in block stage & D.F.T & FINAL inspection, W.B.TK & Fresh Water TK & C.O TK Survey after
seatrial.
■ Production control & safety/inspection Equipment
- Use inspection equipments (DFT gauges, WFT gauges etc)
- Test for water-soluble chemical salts contamination (ferrous and chloride ions) on the substrate
- Attend job safety analysis meetings to ensure necessary quality
■ Drawing Approval
- Approval of specification, ITP (inspection test plan)
■ Reporting to ship owner’s representative
- Able to read and understand specification, identify its required documents, records, inspection procedure and filing
- coating/painting faults/ failure analysis
- NCR(non confirm report) after sea trial
CV – Ki-Hyun Kim Page 2 of 5
JINSE Shipbuilding – Korea – Paint Department Quality Assistant / Production Assistant manager
04-2008 to 07-2009
ROSS CHEMICAL Newbuilding Project / JINSE Shipbuilding / Chemical Tanker (PSPC)
13K Chemical Tanker x 8 Ships
■ Inspection and Quality control of Paint
■ Production control& safety Equipment
■ Drawing Approval
■ Reporting to shipyard representative
■ Monitoring & handling to subcontract, manpower, paint department production schedule.
JINSE Shipbuilding – Korea – Paint Department Quality Assistant / Production Assistant manager
05-2007 to 04-2008
EITZEN Newbuilding Project / JINSE Shipbuilding / Chemical Tanker (PSPC)
13K Chemical Tanker x 4 Ships
■ Inspection and Quality control of Paint
■ Production control & safety Equipment
■ Drawing Approval
■ Reporting to shipyard representative
■ Monitoring & handling to subcontract, manpower, paint department production schedule.
JINSE Shipbuilding – Korea – Paint Department Quality Assistant / Production Assistant manager
07-2005 to 05-2007
SONGA Newbuilding Project / JINSE Shipbuilding / Bulk Carrier (PSPC)
32K Bulk Carrier x 3 Ships
AKTIF Newbuilding Project / JINSE Shipbuilding / Bulk Carrier (PSPC)
32K Bulk Carrier x 1 Ship
METROSTAR Newbuilding Project / JINSE Shipbuilding / Bulk Carrier(PSPC)
32K Bulk Carrier x 1 Ship
■ Inspection and Quality control and Administration of Paint
■ Production control & safety Equipment
■ Drawing Approval
■ Reporting to shipyard representative.
■ Monitoring & handling to subcontract, manpower, paint department production schedule.
STX Offshore & Shipbuilding –Korea – Paint Department Q.A Assistant manager 01-2003 to 07-2005
PARAKOU Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
SUN Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
MOTIA Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
TARGET MARINE Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
E/JACOB Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
NYK Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
GESCO Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
STX PAN OCEAN Newbuilding Project / STX Offshore & Shipbuilding / Chemical Tanker
51K Chemical Tanker x 5 Ships
45K Chemical Tanker x 5 Ships
CV – Ki-Hyun Kim Page 3 of 5
35K Chemical Tanker x 4 Ships
75K Chemical Tanker x 8 Ships
47K Chemical Tanker x 8 Ships
■ Inspection and Quality control of Paint
■ Production control & safety Equipment
■ Drawing Approval
■ Reporting to shipyard representative.
■ Monitoring & handling to subcontract, manpower, paint department production schedule.
Education
03–1992 to 02-1994
Yang San high school
In-Jae University, Kimhae, Korea (Major- Philosophy) 03-1995 to 01-2001
Qualifications : FROSIO Level lll (Certificate No. 6873)
KACE Advanced Coating Inspector (Certificate No.093051)
Languages: English, Korea
Personal Information
Nationality: Republic of Korea
Location: Busan, Korea
Date of Birth’ : 29th, July,1975 (Age 38)
M.Phone : +82 (0-10-344*-****
E-Mail : ***********@*******.***
Marital Status : Married
CV – Ki-Hyun Kim Page 4 of 5
Qualification
FROSIO Level lll (Certificate No. 6873)
KACE Advanced Coating Inspector (Certificate No.093051)
KACE Basic Coating Inspector (Certificate No.091011)
CV – Ki-Hyun Kim Page 5 of 5