Post Job Free

Resume

Sign in

Project Manager

Location:
Bekasi, West Java, 17510, Indonesia
Salary:
$4500
Posted:
November 30, 2012

Contact this candidate

Resume:

Hery Purwanto

Jln. Muharam II No. ** Rt ***/** Desa mangun jaya 17510

West Java

INDONESIA

phonecell: +628**-****-**** /+628**-****-****

e-mail: abgfyx@r.postjobfree.com/ abgfyx@r.postjobfree.com

Personal Data

• Sex : Male

: Bekasi/ Mei, 05st 1980

• Place/ Date of Birth

• Religion : Moslem

• Hobbies : Soccer, badminton, fishing fish

• Marital Status : Merried

: AL 609 559 E XPIRED DATE 11th JUNE 2011

• Passport No

Formal Education

• M echanical Engineering Faculty, Gunadarma University, jakarta

1999 – 2004, graduated in October 2004, GPA: 2.82 (scale of 4)

• Senior High School Ristek Jaya, East Jakarta 1995 – 1998, graduated in May 1998

• Junior High School 4 Bekasi, West Java

1992 – 1995, graduated in May 1995

• Elementary School kranji Bulak II, West Java

1986 – 1992, graduated in May 1992

Non Formal Education

• Computational fluid Dynamics (CFD)

Indonesia University, Depok

• In Advanced Technical Drawing With AutoCad

Gunadarma University, Depok

• Introduction to ISO 14001

Gunadarma University, Depok

• Approval of QC inspector piping from ARAMCO

• Driving License A, From POLRI, No SIM : 800*********

• FIRST AID TRAINING LEVEL ONE FROM INTERNATIONAL SOS, JAKARTA, INDONESIA

Familiar With

• International Code and Standard

ASME CODE, AWS D.1.1, API 1104, API 5L, API 2W, ASTM

• A ny company’s specification

Aramco Standard SAIC (Saudi Aramco Inspection Checklist),

SATIP-L-350-1 (Saudi Aramco typical Inspection Plant)

Work Experiences

th

Period : 28 Mei, 2012 – Present

Company : PT SHOUTH PACIFIC VISCOSE, PETROCHEMICAL

Position : SUPERVISOR E NGINEERING MECHANICAL

th th

Period : 30 March, 2011 – 25 Mei, 2012

Company : PT Waspada Karsa Consultan Freeport McMoRan Indonesia, Dept Central Service Engineering

Project : -Common Infrastructure Project

CIP Building Plaza OB#3, GBC Lower Drainage, New Mix Batching Plant, CIP Rail Yard Surface Distribution

Utilities, CIP Pipe Line & Power Line Relocation Pipes Relocation

-Underground Expantion project

DMLZ Compressor, DMLZ fan#2, GBC Compressor, GBC Batch plant.

Position : FIELD E NGINEERING MECHANICAL

Jobs Des :

• Review engineering drawing and prepared As-Built drawing after installation is complated.

• Coordination with construction, Client, QA/QC, Engineering, Project Control and maintenance team to finalizes of

headache/problem.

• Coordinate to prepare sketch drawing of mechanical & piping design (if any).

• Check MTO and prepare additioanal material of mechanical & piping as per design (if any).

• Makes decision to finalizes of problem at field based on design, actual field condition, standard and code of mechanical &

piping.

• Close communication with client.

th

: 07 September, 2009 – 24thMarch, 2011

Period

Company : PT Poeser Indonesia – SDMECO China (J.O)

Project : PLTU 2 NTT 2X16.5 MW KUPANG (Power Plant)

Position : ENGINEERING MECHANICAL

Jobs Des :

• Site inspection for compliance with contract document, approved submittals and mechanical codes.

• Reporting contruction progress of the project for weekly and monthly prior to invoice PLN and certificate progress payment

• Review sub contractor invoice

• Review sub contractor daily, weekly and monthly report

• Participate in contruction progress meeting with owner and consultan

• Participate in final inspection and prepare punch list

• Monitoring us build drawing

• Evaluate contruction material testing result

• Prepare daily report for contruction work progress

• Provide technicial support to preparation of field change request (FCR)

: 10th july, 2008 – 12th july 2009

Period

Company : PT Mohammad Al-Mojil Group

Project : Khurais Krude Kontract (KCC) PROJECT, SAIPEM-SNAMPROGETTI, SAUDI ARAMCO

Position : QC Inspector Piping

Jobs Des :

• Pipe laying, p ipe spool erection and assembly (doubejointing on piperacklsleeperway)

• Piping flange joint inspections (including insulation flanges)

• Treaded connections inspection

• Ventury, flow orifice plate & restriction orifice installation

• Piping system internal cleaniness verification

• Valve installation inspection

• Pipe support and anchoring

• Witness internal cleaning

• Witness hydrostatic & pneumatic test for pip eline & Valve

• Kill punch list

• Re-instatement inspection

As Piping Inspector :

• Checking piping activities as per piping isomeric, arrangements, etc

• Checking activities as per ARAMCO STANDARDS

• Checking fit-ups and identifying proper alignments

• Inspecting piping and piping fitting as per clients QCP

• Preparing inspection reports

• Witnessing the activity with client

• Review of test package preparation

• Inernal cleanliness and/or flushing

• Verification of testing equipment

• Visual inspection at test pressure

• De-pressurization & water disposal

• Lay-up inspection

• Maching the work standard with respect to client standard

• Ratsing internal RFI to the client

• Helping construction with high standard work quality procedure.

th th

Period : 4 April, 2007 – 25 juny, 2008

Company : PT Epiterma Mas Indonesia

Project : First Quantum Minerals Kansanshi Upgrade Project, Flour Australia PTY LTD, Zambia

Simberi Gold Project, Intermet Engineering, Papuanugini

Toka Tindung Gold Projact, Proteus Engineer, North Sulawesi, Indonesia

Kolwezi Mineral Tailing Project, First Quantum Minerals LTD, Kolwezi

Guelb Moghrein Project-Gold Project, Intermet Engineering, Maurtanian

Kansanshi Pressure leach Project, GRDminproc, Zambia

Position : QC ENGINEERING PIPING & STRUCTURE / Staff Cheker.

Jobs Des :

Prepare design Drawing.

Prepare shop Drawing.

Evaluate project progress.

Prepare materials for Fabrications.

As Staff QC ENGINEERING PIPING & STRUCTURE:

• Check file drawing approval or design drawing complete or not, make sure to complete it, make question if really not

exist to project administrator.

• Chek to make sure for completely/clearly and informative of shop drawing files and match the complete of shop

drawing with assembly part list. Don’t any drawing left.

• Discuss or confirm all corespondens files with project administrator. Complete the information for design drawing.

• Cek material with erection drawing based of material or section which in approval or design drawing and chek the

existing materials in local market.

• Chek erection based of design drawing /approval in isometrick view with 2 drafter like:elevation in each floor,

elevation in each column, elevation in baseplate,space 2-column each grid line, slope of beam/rafter/column clash

cek all structure using tekla facility.

• Cek global for the easier of material installation on site, like : The easier of transportation, the easier of sequence

material installation, and easier of welding in site or workshop.

• Chek cutting or part drawing, erection drawing, design drawing, bill of material, delivery list.

• Checking item : space of holes or coordinate holes, diameter holes, watch the tolerance, easily of making slot (2d+1),

quantity of holes, thickness of plate, grade of materials.

th th

Period : 28 OKtober 2004 – 1 February 2007

Company : PT Fajar Mas Murni

Project : PSA NITROGEN PLANT PROJECT, AIR PRODUCT, KALTIM DAYA MANDIRI (KDM)

Position : As Site Enginering Piping

Jobs Des :

Prepare Procedure of Inspection and certification.

Prepare documents for project tender.

Evaluate project progress.

Include to:

• Review Inspection and Test Plan.

• Inspection and Verification Materials.

• Witness Welding activities.

• Review Daily-welding reports.

• Review and Interpreted RT films.

• Monitoring Construction activities such as Trenching, Stringing of line pipes, Tie in activities, Pipes Laying /Lowering in, etc.

• Monitoring trenching before lowering to achieve good condition

• Witness hydrostatic test for pipeline & Valve

• Witness Blowing test for pipeline

• Paper Works: Site Memo, Organize of Document Control Report, etc.

• Review Documents for Certification of Worthiness Combine Facilities such as Safety, environments,installation of equipments,

piping, pre-commissioning, start up and etc.

• Monitoring pre-commissioning / commissioning and start up activities.

As Piping Engineering:

• Performed Material Receiving Inspection, verify and review Mill Certificate

• Pipe Fabrication for GAS PLAN as per ANSI B31.1

• Inspection all welding process at various material and Electrode during construction of piping structure workper ASME/ ANSI

B.31.1

• Inspection spool pipe Fit Up fabrication ( Dimension, Leveling, Beveling, Gap, Drawing )

• Verify WPS and Welder Qualification

• Line check

• Punch list

• Punch kill

• Prepare and reviewed test package

• Witness and organize Hydrostatic test for piping system

Period : 2002 – 2004

Company : Gunadarma University

Position :Lecture Assistant of Studio Gambar Laboratory Gunadarma University

Period : 2003

Company : PT. Nusa Toyoteysu Corp, Bekasi

Position : Apprenticeship / Quality Control

Period : 2002

Company : PT. Yamaha Indonesia Motor Mfg, Jakarta

Position : Apprenticeship / Die Casting

Languages

• English

• Indonesia

Special Skills

• Strong personality

• Experience in team work (organization)

• Computer Literate: Microsoft Windows, Microsoft Office, Microsoft Office Project, AutoCAD, CFD

References

A. Sasmoyo : 081*-**-**** FMM E&C Manager

Abadin : 081*-**-****** FMM Representative

Hananto : 081*-**-***** FMM Head Mechanical Engineering

Murdono : 081*-**-**** Epiterma Mas Indonesia Engineering Manager

Mohammad Al-mojil Group PO.BOX 11, Dammam 31411 Saudi Arabia

Taufik Noor : 081********* Poeser Indonesia Site Manager

Andryan Maulana : 081********* Superintendent Mechanical Engineering Freeport

McMoRan Indonesia

Sincerely,

Hery Purwanto, ST



Contact this candidate