Personal Information
- Country of Birth: Guatemala
- Email address: ************@*****.***
- Mobil in Trinidad & Tobago: 868-***-****
Professional profile
- Excellent interpersonal skills.
- Work efficiently under both time and accuracy pressures.
- Computer skills: MS Word, MS Excel, MS POWER POINT.
- Ability to prioritize, coordinate and oversee work assignments.
- Communication skills in Spanish and English
COUNTRY: Trinidad & Tobago (Nov.2010 to March 2011)
CONNECT CONSULTING
Project: Wimax (Huawei)
Position on Charge:
Supervisor
SCOPE OF WORK:
- Maintain constant communication with the client's appointed project
Managers
And staff as appropriate on each project.
Fully aware of the project progress, potential barriers and risk, and
the level of
Client satisfaction.
- Directly and actively manage the resources engaged on any local
projects to
ensure they are performing the prescribed duties to the level of
quality expected
and necessary to satisfy the clients.
- Maintain daily communication with Connect consulting and/or ASI in
order to
ensure that the company is at all times properly informed of the
project progress,
potential barriers and risk, and the level of client satisfaction.
- Submit weekly a report on each project in progress, outlining
resources under
management, work completed, work begun, work cancelled, and work
accepted
by the client.
COUNTRY: Trinidad & Tobago (Nov.2009 to September 2010)
Antel Telecom
Project: Huawei
Position on Charge:
Supervisor
- Coordinate and Perform the installation of APM30 and Rack19"equipment
and supervisor all installation of fiber, power cable, antenna and
RU3702 on tower.
Project: ADC
- Trouble shoot A&L issues with the customer to confirm corrective
action
Provide all reports on findings in the ADC Remote unit in Chaguanas
area.
Project: Huawei
- Datacom:
. Installation of Cabinet and Sub-Rack AMII - ADM OSN3500
. Installation of Power and Grounding Cables
. Run 32 Optical fiber from the equipment to an ODF
. Run 1 UTP cable from the OSN3500 equipment to the hub in the
Metro6100 Cabinet
. Run two clock cable from OSN3500 equipment to the clock source
and cable to be terminated (wire-wrap) on the clock equipment.
. Run 128 Trunk cable From the Equipment to the DXX Module and
make all BNC connectors.
Project: RADWIN
- Installation of two Antenna RADWIN from TSTT tower to National
Security Tower
and performed the Link.
Project: Repsol
- Perform the Demo Link installation of two antenna RADWIN2000, mounting
bracket, EDU, between Samanaan Alpha to Teak Alpha offshore.
Project:
- Perform the installation of two Andrew Microwave antennas VHLP-6 and
run the waveguide in Cumberland Hill
COUNTRY: Trinidad and Tobago July to October 2009 -
Manning Global
Project: Antennas & Line Sweep test and BTS Troubleshooting
Customer: TSTT and NORTEL
Position on Charge:
RF Sweep test technician:
Perform the Maintenance in antenna, line and BTS by performing the
following tests.
- Insertion (Cable) Loss, Return Loss-no antenna, Return Loss with
antenna DTF with no antenna and with antenna.
COUNTRY: Canada June to July 2009 -
State telecom Consultants
Project: 3.5G Huawei
Customer: Bell South
Position on Charge:
technician Installer :
Perform the installation of Microwave 6 GHz and 11 GHz, installation of the
antennas bump, RF antenna with RRU for 850MHz and 1900MHz, all installation
was performed with the Bell South quality standard,
COUNTRY: Suriname February to April 2009 -
Manning Global
Project: Installation and Commission (I&C)
Customer: NORTEL /TELESUR
Position on Charge:
RF Sweep test technician:
Validated integrity of the customer's antenna and line installation by
performing the following tests.
- Insertion (Cable) Loss, Return Loss-no antenna, DTF - with antenna &
Return Loss
with antenna.
- Trouble shoot A&L issues with the customer to confirm corrective
action
- Provide weekly reports on findings.
COUNTRY: Belize September to December 2008 -
ADEX
Project: Installation and Commission
Customer: Nortel /Belize Telemidia
Position on Charge:
Antenna and Line Supervisor:
Supervise all A&L installation, Analyze all the sweep test submitted by
Nortel contractor,
Check the Site Package, send report after Analyzed Sweep test and Site
Package to the Nortel PM
COUNTRY: Trinidad and Tobago (October 2008)
Prosertel of T&T Ltd.
Project: CDMA MAINTENANCE
Customer: Trylon TSF/TSTT
Position on Charge:
RF TECH:
Execute the Sweep Test, Analyzed and check any possible faulting in the
antenna and line Electrical and Mechanical Tilt, Azimuth, connector,
jumper, antenna or TX line and organize and prepare all reports, which were
submitted to TSTT and TRYLON
COUNTRY: Bahamas (August 2008 - Sept. 2008 (3rd phase)
Manning Global
Project: Assistance Operational Services
Customer: Nortel/Batelco
Position on Charge:
RF Tech:
Execute the Sweep Test, Analyzed and check any possible faulting in the
antenna and line Electrical and Mechanical Tilt, Azimuth, connector,
jumper, antenna or TX line and organize and prepare all reports, which were
submitted to BATELCO and NORTEL
COUNTRY: Bahamas (MAY 2008 - JUNE 2008 (2nd phase)
Manning Global
Project: Assistance Operational Services
Customer: Nortel /Batelco
Position on Charge:
RF Tech:
.
Execute the Sweep Test, Analyzed and check any possible faulting in the
antenna and line Electrical and Mechanical Tilt, Azimuth, connector,
jumper, antenna or TX line and organize and prepare all reports, which were
submitted to BATELCO and NORTEL
COUNTRY: Bahamas (Feb 2008 - March 2008 (1st phase)
Manning Global
Project: Assistance Operational Services
Customer: Nortel /Batelco
Position on Charge:
RF Tech:
Execute the Sweep Test, Analyzed and check any possible faulting in the
antenna and line Electrical and Mechanical Tilt, Azimuth, connector,
jumper, antenna or TX line and organize and prepare all reports, which were
submitted to BATELCO and NORTEL.
COUNTRY: Trinidad and Tobago Dec2007 - Jan 2008
Sterling network Corp.
Project: Assistance Operational Services
Customer: Nortel /TSTT
Position on Charge:
BTS Tech:
. Install BTS 12K and 18K organize and prepare the Site package all
reports which were submitted to Sterling.
JULY 2007 TO SEPTEMBER 2007
[pic]
Prosertel of T&T Ltd.
Project: ARANGUEZ SPORTS AND CULTURAL CLUB
Customer: ARANGUEZ SPORTS AND CULTURAL CLUB
Installation of lighting for grounds and pavilion.
Prosertel of T&T Ltd.
Project: PENAL HIGH SCHOOL
Customer: VOLTRON ELECTRICAL
Upgrade and install electrical wiring in staff room, library and computer
room.
Coordinate and supervise a team of 4 persons.
Prosertel of T&T Ltd.
Project: MOHAMMED'S ELECTRICAL WAREHOUSE EXT.
Customer: MOHAMMED'S ELECTRICAL CO. LTD.
Complete electrical wiring, grounding installation and Installation of 60
lamp.
Coordinate and supervise a staff of 8 persons.
COUNTRY: Trinidad and Tobago May2007 - June 2007
Sterling Network Corp.
Project: Assistance Operational Services
Customer: Nortel / TSTT
Position on Charge:
RF Tech.
. Executive the Sweep Test and organize and prepare all reports which
were submitted
To TSTT and NORTEL.
COUNTRY: Trinidad and Tobago (DEC 2006-April 2007)
Prosertel of T&T LTD
PROJECT: ANTENNA AND LINE INSTALLATION & SWEEP TEST
CUSTOMER: TSTT
Position on Charge:
Project Manager:
. Coordinate all duties and responsibilities for 12 persons.
. Coordinate all invoice and work plan.
. Executing antenna and line installation, sweep testing for GSM 850 and
GSM 1800 for various sites throughout Trinidad and Tobago
COUNTRY: Barbados (FROM NOVEMBER 11th TO 29th 2006)
Prosertel of T&T Ltd.
PROJECT: 18 SITES (DIGICEL)
CUSTOMER: FM LOGISTIC AND SUPPORT SYSTEM
Position on Charge:
Project coordinator:
. Coordinate duties and responsibilities for 8 persons.
. Executing the installation of CDMA Equipment (HUAWIE), Sweep Test,
Antennas and Lines.
COUNTRY: HAITI OCTOBER 2005 TO MAY 2006
Prosertel of T&T Ltd.
PROJECT: 30 SITES (DIGICEL)
CUSTOMER: CALATEL HAITI
Position on Charge:
Project Coordinator:
Coordinated duties, responsibilities and weekly schedule for all
installation.
. Executing the Electrical, Grounding, Generator Installations, Tower
Erections
. Installations and commission of Ericson GSM (2106 v3,2206, 2208)
equipment
. Installation of Antennas and Lines for the entire project.
. Duties also include Quality Control of all installation
documentation and files.
Prosertel of T&T Ltd.
PROJECT: 10 SITES (DIGICEL)
CUSTOMER: TRYLON TSF
Position on Charge:
Project Coordinator:
. Coordinated and provide material and weekly schedule for
installation of 20 Electrical generator with AT and fuel tank.
. Executing the Electrical, Grounding, Generator Installations.
COUNTRY: TRINIDAD AND TOBAGO (OCT. 2004)
CALATEL TRINIDAD & TOBAGO LTD.
Project: GENTECH (TSTT SITES)
Position in Charge:
Electrical Coordinator:
. Coordinate duties and responsibilities
for 10 persons
. Installation of electrical and
grounding devices for System 3,000 (as
Erico specifications).
. Organize and prepare all reports.
COUNTRY: JAMAICA (December 2003 TO September 2004).
CALATEL JAMAICA
Project: CENTENNIAL - OCEANIC - MY PHONE ACTUALLY
Position on Charge:
Electrical Coordinator:
. Coordinate duties and responsibilities
for 10 persons.
. Electrical and grounding installations
as client specifications and following
the Jamaica Standards and NFPA 70
NATIONAL ELECTRICAL CODE 1999, and
IEEE Recommended Practice for
Grounding of Industrial and Commercial
Power System (green book), ANSI code.
. Construction of secondary extension
lines from the meter socket to the
site as client specifications for 50
KVA Single Phase 120/240 volts and 75
KVA 3 phase 120/240 volts, following
the Jamaica Standards and NEC 1999 (
3% drop voltage).
. Installation of Lucent Equipment
facilities in VFP shelter for
telecommunications then: Galaxy Power
System (GPS 4812for 800 Amp -48 VDC
output) including the batteries bank
of 1000 A/H. also the rectifiers.
Metrocell TDMA technologies, RF system
(Andrew brand).
. Organize and prepare all reports.
CALATEL JAMAICA
Project: DIGICEL JAMAICA.
Position in Charge:
Electrical Coordinator:
. Coordinate duties and responsibilities for 50 persons.
. Execution of the electrical and grounding works following the
Digicel Specifications.
. Installation of electrical and grounding requirement for roof top
installation as per Digicel Specifications.
. Correction of grounding maintenance for telecommunication works.
. Organize and prepare all reports.
CALATEL JAMAICA
Project: CABLE AND WIRELESS.
Position on Charge:
Electrical Coordinator:
. Coordinate all duties and
responsibilities for 50 persons
. Installation of all electrical,
generators, fuel tanks, grounding
works as C&W
specifications.
. Organize and prepare all reports.
CALATEL JAMAICA
Project: JNAP
Position on Charge:
Electrical Coordinator:
. Coordinate all duties and
responsibilities for a team of 5
persons.
. Installation of a Power plant Lorain
1200 Amp -48 VDC with two back-up
batteries bank 1000 A/H.
. Installation of grounding point from
the ground to the fourth floor where
we installed the power plant to the
facilities telecommunications works
for JNAP.
COUNTRY: GUATEMALA (1994 TO 2001)
SERVITEC
TELEFONICA (MOVISTAR):
Position in Charge:
Subcontractor:
. Electrical and grounding supervision
as client specifications and following
the Guatemala Standards and NFPA 70
NATIONAL ELECTRICAL CODE 1999, and
IEEE Recommended Practice for
Grounding of Industrial and Commercial
Power System (green book), ANSI code.
. Supervision and installation assembly
of containers panel Rohn brand for
telecommunications sites include all
electrical facilities to install
equipment (electrical EMT pipes,
cabling, AC Unites Bart and Liebert 36
BTU 120/240 Volts 60 Hz).
. Measurement ground resistance of the
system at conclude the site and
delivery the ground certificate to the
customer three days after conclude the
site, supervision the as built
drawings.
GUATEL (TELGUA or CLARO)
Position:Electrical Technician III:
. Electrical supervisor for all
electrical installations and
Generators with fuel tank including
ATS and all fitting for Emergency
plants then:
. Olympia Generators (25 to 300 KVA)
Onan (25 to 300 KVA).
. Supervision and installation of
grounding systems following the Guatel
Standards.
CERTFICATE
Jamaica Red Cross Society.
Certificate of Participation
Emergency First Aid course
September 2004
G.T Consulting Services of Jamaica Ltd.
Certificate of Participation
Safety Awareness Elevated Course
June 2004
INTECAP.
Electrical Technician
- Residential, Commercial and Industrial.
YTEPP
Certificate of Participation
OSHA T&T 30 HRS TRINING COURSE
Safety and Health Standard Course
For General Industry
Oct. 2006 - Nov. 2006.
NORTEL NETWORK.
GSM/UMTS Voices Core Network Fundamentals
Network Architecture Overview
CCS7 Protocols and VCN Interfaces
GSM/UMTS Procedures
GSM/UMTS Handover
GSM/UMTS Supplementary Service.
February 2008
NORTEL NETWORK.
Certificate.
GSM BTS Qualification
July 11, 2008
SCHOOL OF BUSINESS AND COMPUTER SCIENCE
Certificate
Project Management
For Business Professionals
May to June 2009
Falck Nutec
Certificate
OPITO Tropical Basic Offshore Safety Induction & Emergency
Training (TBOSIET)
COURSE CODE 5501
. Basic Safety Induction
. Helicopter Safety & Escape Training
. Sea Survival Training
. Fire Fighting & Self Rescue Techniques.
Expires On 08-Jul-2014
FALCK NUTEC
CERTIFICATE
BP GOLDEN RULES OF SAFETY
ENVIROMENTAL MANAGEMENT SYSTEM (EMS) AWARENESS
EMS POLICY-
. Legal Compliance
. Pollution Prevention
. Continual Improvement
ISSUED ON: 09JULY2010
TELECOMMUNICATION SERVICES OF TRINIDAD AND TOBAGO (TSTT)
CERTIFICATE
. Safety Orientation
DATE EXPIRED 06TH MAY 2012