Telephone 303-***-****
http://www.linkedin.com/in/waynetrout
abg7l1@r.postjobfree.com
Plant Manager
(Turnaround (High Growth (Lean Manufacturing
Results/metric-driven global operating manager and materials specialist
with 10 years of progressive experience in warehouse, logistics,
manufacturing and production management. Combining modern
warehouse/manufacturing philosophies and systematic approaches to
consistently deliver strong operating and financial results.
Qualifications
(Cost Reduction & Revenue Gain (Production/Materials Process
Improvement
(Inventory and Quality Control (Production
Scheduling/Materials procurement
(Project Management and support (Training, Development and Team
Building
(ISO9000, ISO9001, TS16949 (Lean Manufacturing, Six Sigma,
SPC, TQM
(Certified Supply Chain Analyst (QA/QC Management,
Safety VPP level experience
Professional History
Production Manager-Production Management/Lean Transformation
Metron -Denver, CO
October 2009-Present
Management of personnel and process (warehouse to shipping) to ensure on
time delivery of product and waste reduction with particular attention to
personnel development/teambuilding, changing the culture and process
redesign from layout to assembly using lean tools and methodology.
Understanding of process (schematics, BOM's, etc.) from engineering to
production build with Fire Pump Controllers and Custom Electrical
Equipment.
. Layout redesign for assembly for better workflow/step reduction/muda
(waste)
. Value Stream improvements through use of delay clipboards (wire
harness/cell layout/warehouse and supply flow/combining of process)
. Annual cost savings 2010 through brainstorming and task list $86,036
. Continuous Improvement (kiazen) team building and blitzes (wire
harness creation/controller internal redesign)
. Standard Operating Procedures and Job Safety Analysis creation and
modification (208 continuous safety days/average non-conforming
records down 20% from 2009)
. Charting and continuous monitoring of assembly performance ( Direct
time average 91% (10% increase) for 2010)
Plant Manager -Warehouse/Logistics and Supply Chain
Acme Mfg. Company-Denver, CO
January 2008-August 2009
Responsible for the operational performance of the plant and for all
personnel, equipment, facility, financial, and reporting requirements
necessary; to ensure that ongoing plant operations (including product
development and support) are performed in a cost-effective and safe manner
and ensure that all operations and service goals are established and met.
. Vice President of the Safety committee and responsible for the
creation of safety practices within the plant, there has not been a
recordable for more than 388 days in the warehouse.
. Built the Plant Management Dashboard for warehouse.
. Transit times cut by up to 2 days in certain lanes and cost to do so
brought down by 19% overall through transport management initiative.
. PM scheduling for facility trucks and warehouse equipment.
. RGA, Shipping and warehouse process development and implementation
with on-site process engineer.
. Incident Commander for Denver Facility.
Production Planner/Coordinator, High Volume global Materials Manufacturing,
Norgren - Littleton, CO.
April 2007-Nov.2007
Lean/Six Sigma coordination of "Plan for Every Part" process. Management
of build plan scheduling and procurement of materials to meet on time
delivery goals. Project management and development organization with
global team of suppliers and importers.
. Introduced of Plan for every part process to utilize suppliers as
warehouse to reduce in house inventory by 15%.
. Developed and demonstrated the most effective supply chain
management from shipping procedure to procurement of different
courier that has more compliance with customs for faster two week
lead time reduction.
. Developed statistical process control throughout valve division with
lean Champion.
Production Supervisor, High Volume Materials Manufacturing,
Simmons Company, Denver CO May 2006-
April 2007
Lean manufacturing implementation specialist with six sigma theory
practice. Coordination of build plan scheduling to meet on time delivery
goals. Employee development of 30 individuals. Project management and
development coordination with global team.
. Introduction of Lean manufacturing/Six Sigma to production and
materials management.
. 0 minute changeover process team 1st in company to develop process
map.
. VPP OSHA Star level training (only 1% of companies in the U.S. have
attained a VPP Star, worked with regional OSHA representative).
Planner, Environmental Water Monitor Equipment Manufacturing
In-Situ Inc. - Fort Collins, CO.
May 2004-May 2006
Strategic Planner in charge of planning and issuing of jobs and duties on
the production floor to meet on time delivery goals. Coordination of Sales
and Purchasing departments. Numerous process improvements and lean
manufacturing innovation.
. Ises (project) champion, lean manufacturing implementation shop wide
(Toyota Production System)
. Intricate in on time delivery through production planner action plan
(team leader) improving from 40% to 83%
. Introduced Blogs as a marketing tool, sales up 15%.
. Introduced on-line documentation process, failures down 23%
Logistics Manager/ Manufacturing Manager, Printed Circuit Board
Manufacturing
Celestica Inc. - Fort Collins, CO.
August 1999-march 2004
Promoted from Line Materials Coordinator to Manufacturing Technician to
Logistics Manager to Manufacturing Manager (QA management was part of this
process). Overseeing 110 individuals. Knowledgeable in all areas of
manufacturing from parts received, SMT through Final inspect, and parts
shipped. Introduced a series of productivity improvement, process
reengineering, cost reduction and performance management programs that
consistently improved production output, product quality and customer
satisfaction.
. Implemented a material flow and changeover reduction team that
caused throughput rate increase from 74% to 91% on SMT lines, mp2
system implementation team and I repositioned the ATE technical
support team to achieve 82% to 90% increase In-Circuit Test first
pass.
. On-line documentation process support team.
. Implemented Line Materials Coordinator mentorship program.
Software knowledge
Fluent in all MS Office applications and Windows (95-XP, Vista)
applications. Also experienced in SAP,AS/400, Jobscope, BPCS, MAX, DOS
MAX, Syspro, Procomm, Viewstation, Viaware, Visual Source Safe, AutoCAD,
Alibre, Verikey. Kronos timecard systems, ITP timecard system, Datacap
timecard system.
Specialized Training & Certifications
ESD, ISO9000,ISO9001, IPC 610-C, Hazmat, Safety Committee, Solder
Modifications 1-3,SMT Seimens and Fuji, Inspection through final to 100%
under scope, In-circuit test, Functional Test, Box Build, Configure to
order, Burn-in.
Education
Michigan (Ross Business School) Expert Lean Training
Celestica, Fort Collins CO, Corporate Management courses
Salem College, Salem NJ, Business and Psychology
Apics Northern Colorado/Iscea, Certified Supply Chain Analyst certificate
2010-2011 Aurora Community college (current 4.0 average)
Non-Profit work
Children's Carnival Facilitator for Children's Hospital Aurora and Ronald
McDonald House Aurora
Board of Directors Eastern Plains Women's Resource Center
Mentor for Smart Leaders Directors - Smart Leaders Coaching & Mentoring
Program