DONNA S. BRACEY
____________________________________________________________________________
___________________________________
**** *. ****** *** ( Chicago, IL 60649 ( 773-***-**** (
abg6v6@r.postjobfree.com
OBJECTIVE To obtain a position that will allow me to showcase my project
management skills while highlighting my creativity,
reliability, and attention to detail.
EXPERIENCE
INDEPENDENT CONSULTANT
03/09 to present The Carter Ware Group, Director of Property Management
Chicago, IL
. Created new division for company including developing
internal work process procedures to effectively communicate
with project staff, developers, sub-contractors, and
government liaison
. Managing staff including lawn maintenance, facility
maintenance, property managers, and property inspectors.
. Co-managed, planned, and organized the preparation of
proposals for property management and owners rep services.
. Assembled team for winning contract bid.
. Performing project management services including: oversight
of all project team members, conduct weekly project update
status meetings, liaison to government contact.
. Managing project lifecycle of proposed rental properties
including purchase, construction, leasing, and management.
. Coordinating the demolition of 10 properties for the City of
Chicago, Department of Community Development including
residential, commercial, and industrial properties.
USG, CORPORATION
09/07 to 12/08 Project Manager
Chicago, IL
. Developed project equipment list and procurement plan from
approved capital authority for $240 million project.
Managed the development of the project schedule for both
design and construction.
. Managed the release of Engineering Control Documents of OEM
and in-house designed equipment from design group, ensuring
all design details are coordinated from various groups
including: mechanical, electrical, structural, thermal and
process controls. Managed document flow from design to
project controls, and strategic sourcing.
. Managed project information between design group, strategic
sourcing, project controls, scheduling, field, and outside
vendors.
. Developed LEED strategy for greenfield project to achieve
highest LEED certification with the greatest financial
return.
11/06 to 08/07 Project Development Manager
Chicago, IL
. Assumed leadership accountability for planning and
development of all elements of capital projects.
. Insured all project activities were effectively managed from
the initial scope preparation stage through the issuance of
a complete project file.
. Created and developed project team accountabilities and
worked closely with design, technical services, process
control, cost control, scheduling and estimate groups to
generate positive team based results.
. Provided a continuous interface between engineering,
manufacturing, and all staff support departments to develop
effective plans that incorporate goals of the manufacturing
group.
. Managed all initial project development by outside
contractors including epa, sitework, raw material providers,
transportation, local and federal government agencies,
wetlands, and construction management.
2/01 to 11/06 ROHM & HAAS COMPANY
Lansing, IL
Process/Project Engineer
. Developed capital proposals related to capacity, cost
reduction, asset utilization, and EHS improvement.
. Lead and managed assigned capital projects from conception
to startup by forming project teams, developed project
justification and goal deliberation, supervised installation
and construction, and developed initial operational
procedures and training for new equipment and process
startups.
. Responsible for project change management and the
distribution of proper documentation after project close
out.
. Applied risk management assessment (HAZOP's) for all process
improvements and capital projects.
. Managed all contractors both in-house and outside for
project work.
. Performed monthly cost projections and updates for capital
projects.
DONNA S. BRACEY Page 2
USG, CORPORATION
12/99 to 1/01 Field Engineer
Plaster City, CA / Rainier, OR
. Provided and managed accurate schedule of equipment
deliveries to allow construction scheduling and manning to
effectively plan field assignments for $110 million project.
Obtained this information through various resources:
Corporate Engineering, Purchasing, Expediting, and Outside
Vendors.
. Expedited all equipment in the field identified as critical
path to minimize negative impact on project schedule.
. Investigated, supervised, and verified field changes as
directed to ensure the necessity, accuracy, and magnitude of
work performed by outside contractors.
. Developed all mis-fabricated parts reports giving detailed
engineering and cost information to recoup dollars from
incorrectly manufactured equipment from outside vendors.
. Planned and supervised demobilization of construction
materials/equipment from project team and contractors.
5/98 to 12/99 Project / Process Engineer
Jacksonville, FL
. Developed capital proposals and managed to completion
projects in excess of $900,000; including purchasing all
materials, negotiating all contracts, and managing
construction.
. Managed all mechanical and electrical contracts for the
papermill.
. Performed monthly cost projections for both capital projects
as well as departmental costs.
. Conducted several monthly department safety meetings.
. Developed database to track variables across paper machine
for troubleshooting purposes and delay analysis.
. Conducted and supervised trials of chemical system usage and
addition points.
EDUCATION
1993-1998 HOWARD UNIVERSITY
Washington, DC
Bachelor of Science degree in Chemical Engineering, May 1998
. President: American Institute of Chemical Engineers
. Member: National Society of Black Engineers, Society of
Women Engineers
. Member: Alpha Kappa Alpha Sorority, Incorporated
SKILLS Microsoft Office, SAP, Oracle, Microsoft Project, Auto-CAD 2D
and 3D, Autodesk Viz, SketchUp, Knowledge of LEED Project
Development