Magda J. Alsina
Metairie, LA 70002-4339
Cell: 504-***-**** abg5ev@r.postjobfree.com
SUMMARY
Detail-driven engineer with over fifteen years of experience with proven
project management skills from planning to implementation stage. Strong
experience defining projects scope, budget, resources and timeline.
Demonstrated ability to motivate staff to maximum productivity and control
cost through effective uses of resources. Recognized for strong adherence
to safety, efficiency and organization. Successful in coordinating efforts
internal and external teams to reach target goals. Core skill areas
include:
Project Lifecycle Management Process Improvement
Standard Operating Procedures Contract / Price Negotiation
Development
Electronic Testing and Troubleshooting Budgeting and Expense Control
Equipment Installation and Maintenance Quality Controls
Organization Development Personnel Oversight
Cross-functional Collaboration Safety Compliance
OSHA, NEC & - NFPA Regulations Fluently Spanish and English
PROFESSIONAL EXPERIENCE
ROHM AND HAAS - Newark, DE 2005 - 2008
Reliability Engineer
Reviews engineering specifications and drawings, proposing design
modifications to improve reliability within cost and other performance
requirements.
. Worked with a team to execute preventive maintenance tasks such as
breaker checks and installation of UPS's and similar components to
address electrical reliability.
. Delivered $1M automated project to convert manually operated splice
system into more reliable, faster and safer system, eliminating
unnecessary risky procedures.
. Played key role on Safety Council Team creating and rolling out
electrical safety assessment process. Processes in compliance with NEC
and OSHA regulations resulting in successful process development and roll
out.
. Supported long-term optimization and problem solving by initiating and
supporting area improvement projects.
. Utilized CDP Process when developing and executing projects.
. Prepared all plant engineering project documentation including Project
Estimate, Cost Control and Timing.
PROCTER & GAMBLE, Dover, DE 2000 - 2005
Electrical Controls Engineer
Oversaw commissioning and start-up of new packaging equipment installations
using Allen Bradley PLC, panel view operator interface and SAP.
. Reduced head count by implemented vision system to replace employees and
reliably track quality defects resulting in reduced shipping errors and a
cost saving.
. Supervised packaging area expansion project by creating six automated
accumulation lanes using Allen Bradley PLC to reduce downtime and
increase throughput.
1. Successfully reduced work related injuries as a member of the Safety
committee by implementing job aids, safety audits and safety procedures
for new equipment.
2. Inspected and approved contractors' and instrumentation technicians
work.
3. Developed testing of PLC/PC based control systems in support of capital
projects.
4. Worked closely with process engineers, IT, maintenance groups and area
management in defining functional specifications for process changes.
Magda J. Alsina Page Two
PUERTO RICO HIGHWAY AUTHORITY, San Juan, PR 1989 - 1999
Utilities 1995 - 1999
Managed coordination of utilities construction projects for major
infrastructure projects.
5. Led $20M reversible express lanes construction on main highway to reduce
traffic flow in limited working area and ensure safety.
6. Assigned and implemented $10M lighting system project.
7. Managed surveillance system fiber optic installation as part of new
highway safety command project.
8. Served as an inspector engineer for Federal Emergency Management
Administration during the disaster recovery work for hurricane Hortense
in PR.
9. Assessed and estimated $500M infrastructure damage caused by hurricane
and execution recovery work.
10. Directed strategic plans, administrative budgets and process
improvements.
Project Engineer 1992 - 1995
Responsible for management of major infrastructure projects.
11. Managed $1 million new highway and toll plaza construction project to
reduce time and ensure safety when traveling the new highway.
12. Prepared and administered budget and time forecasting.
13. Managed personnel and subcontractors, reviewing and approving payments.
14. Created and implemented strategic plans.
15. Developed improved processes to meet short and long term objectives.
16. Prepared correspondence, findings of fact, cost estimates, change
orders, pre and post negotiation memoranda.
17. Prepared payroll and productivity reports, reviews OSHA logs for injury
analysis, implements best practice improvements.
18. Interviewed and selected employees, prepared schedules, performed
personnel performance evaluations and make recommendations for
promotions.
Design Engineer 1989 - 1992
Responsible for electrical utilities design of new highway construction and
upgrades. Managed design drawings and specifications, equipment selection,
contractors bids analysis and approval and as built drawings preparation.
19. Estimated project execution cost and materials needed for specific
projects, prepared bid packages.
20. Worked on highway development and utilities design creating bypass
resulting significantly improved transit flow through downtown.
21. Developed new lighting system design main highway from San Juan to
Ponce, PR, resulting in reduced fatalities due to poor illumination.
22. Created Electrical Group new hire general and technical information
folder system to faster assimilate new hires.
EDUCATION
BS, Electrical Engineering, Polytechnic University of Puerto Rico
TRAINING / CERTIFICATIONS
Apollo Root Cause Analysis
PLC, Allen Bradley
National Electrical Code