To navigate between the fields below, press F** George Diachkoff
Richland WA 99354
***************@********.***
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS
Degree, Certificate, etc., School Major (or Subject) Date
Pontificia
B.S. Universidade Mechanical 12.19.1976
Catolica - Porto Engineering
Alegre
Brazil
OTHER SIGNIFICANT INFORMATION
LANGUAGE Fluent in Russian and Portuguese, semi-fluent in Spanish and
French
WORK HISTORY
COMPANY, DIVISION OR POSITION HELD, SUMMARY OF
DATES DEPARTMENT, RESPONSIBILITIES AND
FROM TO LOCATION AND SUPERIOR SIGNIFICANT ACCOMPLISHMENTS
Oct - 2008 Jan - 2011 Bechtel RPP/WTP ( Nuclear Waste Vitrification
Richland - Wa Project )
James McGrath Richland - Wa
Pre Treatment Facility
Transfered to PTF and assigned to
complete chilled water system piping
layout tasks, issuing in the process
many changes to P&IDs like DCNs and
PDCNs.
Coordinated with mechanical systems when
discrepancies occurred with upstream
documents.
Aug - 2007 Sep - 2008 Bechtel RPP/WTP ( Nuclear Waste Vitrification
Richland - Wa Project )
Scott Sheldon Richland - Wa
High Level Waste Facility
With a solid knowledge and understanding
of Plant Design, conducted studies,
finalized layouts, prepared isometrics
for checking and issuing them for
construction.
Jan - 2006 Jul - 2007 Bechtel RPP/WTP ( Nuclear Waste Vitrification
Richland - Wa Project )
James McGrath Richland - Wa
Low Active Level Waste Facility
Re-assigned to LBL to assist in final
design. During this time completed 7000
LF of High and Low Pressure steam
systems, as well as the condensate
return system.
Responsible for 3000 LF of LVP system.
Participated in design reviews and
layout activities .
Dec - 2001 Dec - 2005 Bechtel RPP/WTP ( Nuclear Waste Vitrification
Richland - Wa Project )
Robert Badeau Richland - Wa
Pre-Treatment Facility
Responsible, using the PlantSpace 3D
software, for creating the piping model
of the Treated LAW Concentrate Storage
Process and Treated LAW Evaporation
Process.
Served as a lead designer for PA-13 of
the Pre-Treatment building. In that
capacity was responsible for completing
piping layout in the black cell areas,
on schedule to support iso production
team.
Also assigned to rework team to solve
routing problems in other areas.
Jul - 2000 Sep - 2001 GEZ Architects Bayer Corporation - Berkeley Ca
and Engineers Responsible for generating piping
San Francisco - layouts for chilled
Ca water, steam and cooling towers water
Orlando Asuncion systems
NORCAL - San Francisco - Ca
For this recycling facility designed and
produced drawings
For dust collection, domestic water and
sanitary systems.
Sandia National Laboratories - Livermore
- Ca
Designed and produced layout drawings
for the following
Systems: cooling towers, cold water and
industrial waste.
UCSF Campus Expansion - San Francisco -
Ca
Generation of layout drawings and
coordination with city of San Francisco
of all utilities systems.
Sep - 1999 May - 2000 Bechtel Antamina Copper Project - Ancash - Peru
San Francisco - Responsible for producing detailed plate
Ca work drawings for the main crusher
Nick Nazarian access/maintenance tunnel.
Feb - 1995 Aug - 1999 Quasar Sandia National Laboratories - Livermore
Corporation - Ca
Designed and produced layout drawings
Belmont - Ca for the following
Orlando Asuncion Systems: cooling towers, cold water and
industrial waste.
UCSF Campus Expansion - San Francisco -
Ca
Generation of layout drawings and
coordination with city of San Francisco
of all utilities systems.
Oct - 1979 Jan - 1995 Bechtel Genentech
San Francisco South San Francisco - Ca
Utilizing AutoPlant 3D software,
generated intelligent piping layout for
high pressure steam and various gas
systems for the state of art Pilot Plant
Facility as well as designing the waste
process collection and treatment
systems. Intensive coordination with
all disciplines.
Amgen
Thousand Oaks - Ca
Produced as-built drawings for steam,
nitrogen and compressed air.
Las Vegas International Airport
Las Vegas - Nv
Learned Auto Cad drafting software to
generate drawings for fire protection
system for the 3,000 ft long traffic
tunnels and emergency evacuation
passage.
Nabisco Bakery
Greenfield - Nc
For this 600,000 sq ft facility,
designed storm drainage and waste
collection.
Kennecot -Elko Nv
Newmont Gold Project - Elko Nv
Chino Copper Project - Chino Nv
Cerro Matoso Nickel Project - Colombia
For these mining projects produced
equipment layout, general arrangements
and detailed drawings of conveyors' and
plate work.
Eastern Provinces Internat'l Airport -
Saudi Arabia
Designed and produced piping drawings
for several airport maintenance and
support facilities, such as kitchens,
airport hangers, gas stations,
administrative and recreational
buildings, propane storage facility and
the Royal Family Terminal.
For landscape irrigation work provided
coordination between the contractor and
other disciplines, as well as produced
both site and detailed piping drawings.
Riyadh International Airport - Saudi
Arabia
Produced piping drawings for the
infrastructure facilities for the
workers' camps
1977 1978 Tecnomont Aracruz S.A.
Sao Paulo Espirito Santo - Brazil
Brazil As junior engineer was responsible for
supervising the construction of two
water pumping stations and several water
flow controlling structures for the
paper pulp plant.