Dennis Gee
Irving, TX *****
Home Phone: 972-***-****
Mobile Phone: 972-***-****
OBJECTIVE: Seeking a position in an environment that challenges my skills and knowledge as a
Superintendent of Construction.
OVERVIEW:
20+years of experience in the construction industry as a commercial superintendent.
•
Projects have included churches, shopping centers, city projects and banks.
•
Experience in ground up multi-story wood frame,tilt wall,metal bldgs, brick&stick and
•
remodel and tenant finish out.
Strong, troubleshooting abilities; identify problems and quickly implement effective
•
solutions.
Ability to schedule and coordinate activities of all subcontractors/vendors.
•
Knowledgeable in all construction and safety procedures dictated by OSHA.
•
Experience in hiring and supervising job site employees and subcontractors.
•
EXPERIENCE:
DFW Construction Ft. Worth,TX 02-2009- 12-2010
Superintendent of Construction
Denton Square Office Bldg., Denton,TX
20,000 sq. ft. Remodel of an existing bldg into individual office suites by adding a second floor
inside existing roof line & adding a gym in the same foot print. $ 1 million
International Brotherhood of Electrical Workers, Grand Prairie, TX.
19,000 sq. ft & 3200 sq. ft. bldgs of brick & steel frame for office & meeting hall with a detached
bldg for a credit union. $ 5 million
Jones Partners Construction Rockwall,TX 08-2007- 02-2009
Superintendent of Construction
Allen Medical Center, Allen TX
10,000 sq. ft. tilt wall Medical office building with individual doctor offices, finish out & an x-ray, cat scan &
MRI suite. $ 1.5 million
Comerica Bank-Ausin,TX
4500 sq. ft. Steel frame & brick ground up banking facility. $ 890,000
Tompkins Nance Group Richardson, TX 09-2006 – 05-2007
Superintendent of Construction
Project: Dr. Capua DDS Carrollton, TX
3,100 sq. ft. Ground up slab, brick and stick office facility with Nitrous, Oxygen and Vacuum piping.
Supplied names of qualified subs and took pricing from same.$ 800,000
Project: Don Herring Mitsubishi, Irving, TX
10,800 sq. ft. Remodel of existing bldg. Provided temporary supervision until full time superintendent
could be hired. Supplied names of qualified subs, reworked elevations at front canopy to clarify prints,
met with engineer to modify drawings so major rework would not be needed and generated RFI’s to
architect to address issues for ADA compliance. Worked with new superintendent to help him over see
job..
2
Royal Seal Construction Flower Mound, TX 07-2004 – 09-2005
Superintendent of Construction
Project: Idle-Aire- Pilot Truck Stop Newnan, GA
Supervised the installation of pre-fabricate truss systems, with pre-installed AC, telephone, coax and data.
Brought in new telephone and electrical services. Set pre-fab service building, new concrete bollards and
re-striped.
Project: Office Depot T. I. – Rhonert Park, CA
Supervised installation of drywall, floor coverings, paint, electrical, security, gates and store front. Worked
as liaison between city and shell contractor to obtain C.O. Received and inspected owner furnished
material. Kept watch on owner furnished subs to coordinate their work and contractor subs.
Project: Office Depot T.I. – Georgetown, TX
Project: Bed, Bath & Beyond T.I. – Plano, TX
Project: Office Depot- Distribution Center- T. I. – Columbus, Ohio
Project: Guess Store- T. I. – San Antonio, TX
Project: Office Depot T.I. – San Antonio, TX
Sage & Bray Construction, Inc. Carrollton, TX 10-2002 – 8-2003
Superintendent of Construction
Project: Granite Construction Company
Supervised the construction of a two story tilt wall building with a “Butler” internal frame, finish out of
offices and two story all glass entry.
J C Commercial Lewisville, TX 2-2002 – 9-2002
Superintendent of Construction
Project: City of Plano-Parks Maintenance Facility
Supervised the construction of a 7,900 sq. ft metal building and 12 acres of parking.
Tegrus Construction Cedar Hill, TX 1998 –2001
Superintendent of Construction
Project: North Texas Islamic Association: Mosque
Supervised the construction of Phase II and Phase III additions to the main worship area. Two-story tilt
wall, brick and structural steel frame.
Project: Craig’s Collision Center
Supervised the construction of a 25,000 sq. ft. brick & metal building.
Project: Johnny Lewis Towing
Supervised the construction of 5,000 sq. ft. tilt wall &metal building. Job included 2 acres of parking.
Project: Ten-Hagen Excavating
Supervised the construction of a 9,000 sq. ft metal building.
Project: Presbyterian Church: Stew Pot
Supervised the construction of a $800,000 remodel
G&G Contractors Irving, TX 1987 –1998
Owner
Ran all phases of the business, from bidding to actual work. Project included commercial and residential
remodeling and repair in the entire North Texas Region. Also built 3,500 sq. ft. custom home and 2,000
sq. ft. horse barn in Howe, TX, Medical & Surgical Clinic (repair), Ludwig Properties (commercial building
repair)
Dennis Gee 3
References:
Gerry Benson PM 818-***-****
Alan Samples PM 682-***-****
A C Macafee Owner - IBEW 214-***-****
Brad Freas Architect-IBEW 817-***-**** 800-***-****
Stan Brausel PM 469-***-****
James Brosset Sub 817-***-****
Chris Campos Sub 214-***-****
Salary Range $1100.00- $1300.00 weekly