Post Job Free
Sign in

Manager Maintenance

Location:
Lemont, PA, 16851
Posted:
August 07, 2011

Contact this candidate

Resume:

Frikkie Lombaard

ADRESS:

*** *** ***** *******

Lever Road

Midrand

1687

E-Mail: ********@****.**.**

POSITION APPLY: Operations manager.

PERSONAL DETAILS

Surname : Lombaard

Names : Frederick Johannes (Frikkie)

ID Number : 631**********

Date of Birth : 13 November 1963

Residing In : Midrand

Telephone Numbers : Cell: 082-***-****

Nationality : South African

Gender : Male

Marital Status : Divorced

Dependants : One

Health : Good

Languages : English and Afrikaans

Criminal Offence : None

Availability : 1 Month (Negotiable)

Salary Expectation : R32 000-00 + Benefits

SECONDARY EDUCATION

Highest Education : Matric (Technical)

Tertiary Qualification : National Diploma N6 Electrical

& Mechanical

SUBJECTS PASSED : Mathematics, Electrotechnics,

Industrial Electronics, Digital

Electronics,

Mechanotechnics, Robotic Process Control

And Power Machines (N5)

TERTIARY EDUCATION

INSTITUTION: GERMISTON COLLEGE

1984-1989

CERTIFICATE IN PRODUCTION MANAGEMENT

INSTITUTION: PRODUCTION MANAGEMENT INSTITUTE (PMI)

2004-CURRENT

PRODUCTION

MANAGEMENT DIPLOMA

SUBJECTS: Production Management

Logistical Process

Control

Applied Mathematics

QUALITY CONTROL

Human Resource

Management

Information Technology

Financial Management

OTHER COURCES

COMPLETED : INTERNAL AUDITORS COURSE BVQI (2004)

ISO 9001

INSTITUTION BVQI

EMPLOYMENT HISTORY:

Company: Transnet

Qualified and an Electromechanical Technician

Dates: 1984 - 1988

Position: Electromechanician

Duties: Maintenance on electrical systems control

installations

Panel wiring

Electrical motors

Mechanical switchgear

Generators

Dc invertors

Battery banks

Compressors

Reporting To: Systems Superintendent (Herman Hogal)

Company: Salcast Iron Foundry

Dates: 1988 - 1992

Position: Electrical Charge hand (Hands On)

Duties: Electrical maintenance and breakdown repairs

on

Foundry machines, such as

Disa and George Fisher metal casting

machines.

Overhead cranes

Sand mills

Compressors 7 bar

Conveyors and motors.

Responsible For: Three electricians and two apprentices reporting to

charge

Hand

Reporting To: Electrical Foreman. Willie Barnard

Reason For Leaving: Retrenched

Company: Consol Plastics Ltd

Dates: 1992 -1995

Position: Electrical Foreman (Hands On)

Reporting To: A Clark, Engineering Manager (011-***-****)

Duties: Maintenance and breakdown repairs on the

following P.E.T

Production Machines:

Sidel Blow Moulding Machines

Krupp Corpoplast Blow Moulding Machines

Husky Injection Moulding Machines.

Trine Labeling Machines

Hubco Case and Bottle Packing

Machines

Atlas Copco 7 bar compressors

Hamworthy 40 bar air compressors,

GWK air cooled chillers

Bultimore cooling towers

Chemical dosing and control of water

reticulation system.

Responsible For: Five Electricians and Three Apprentices

Basic budget control.

Reason for Leaving: Retrenched

Company: Packaging Plant and Consumables (Importers and

Agents) for the following machines.

Dates: November 1995 - August 1999

Reporting To: Wilfred Kambeck (Owner) MD

Sidel Blow Moulding machines

Husky PET Injection Moulding Machines

Herma Self Adhesive Labeling Machines.

Imaje Inkjet Printing Machines

Azo Material Loading Systems.

Topwave PET Bottle LAB Test Equipment.

Position: Service Technician

Duties: Installation and commissioning of the above

mentioned

Machines.

Breakdown repairs on the above mentioned

machines.

Sales and assistance with purchase and supply of

spare

Parts of the machines.

Purchase and control of spares for the

above mentioned

machines.

Set and control of service contract for some of the

Above mentioned machines.

Reason For Leaving: Head Hunted.

Company: Xactics-Pet

Dates: August 1999 - 15th August 2003

Reporting To: Andy Atkinson Manufacturing Manager (082-

377-4939)

Position: Maintenance Manager (Hands on)

Duties: Implement Pragma maintenance system.

Recruit train and control

maintenance technicians, to

Perform maintenance on all the packaging

equipment.

Purchase and control all local and

international spare

parts for the plant equipment including

consumables.

Assist with breakdowns on all the packaging equipment.

Responsible For: Five maintenance technicians' and services

technicians.

Position Changed: Transferred to Xactics Transvaal as Production

Manager

to a High Density

Plastic manufacturing plant.

Dates: August 2003 - August 2004

Reporting To: Barend Meintjies General Manager (082-

555-3062)

Duties: Leading a Team of Four Production Supervisors,

170 Machine Operators and Packers

combined

Maintenance Workshop (Maintenance

Foreman, Four

Electricians and Four Fitters)

Regrind Department with Supervisor and

Eight Material

Handlers.

Manage and control of labour on a daily

basis including

Human Resource Functions.

Control and manage daily production

efficiencies.

Control and manage re cycle material and masterbatch

additives.

Assist with monthly stock take.

Assist with the purchasing of spare parts.

Control of the Monthly Expenditure budget for Labour

Raw material and Spare Parts.

Position Changed: Transferred back to Xactics Wadeville, as

Maintenance and

Production Manager -Pet

Dates: Aug 2004 to Aug 2006

Reporting To: Wiltie Bekker Manufacturing Manager

(011-***-****)

(082-***-****)

Duties: Re-implement Pragma Maintenance system and

control

maintenance through Production managers

and their

Production and Maintenance Technicians.

Assist and control plant Services

equipment with one

Technician.

Assist and control the re-cycle material department,

Stock control.

Assist with breakdowns on Plant Equipment where

needed.

Production Manager, Nissei PET Production Plant.

Lead and control of production efficiencies, spare

part

purchases and stock holding.

Perform day to day Human Resource Functions.

Position Changed: Maintenance Manager and Husky Injection Moulding

Machine Production

Manager.

Duties: Same as previous position with the exception of

Husky

Injection Production Manager.

Position Changed: Maintenance Manager and assist with new project,

Planning purchase and installation of

services

machines, control of International

Technicians and

Commissioning of Injection Moulding Plant.

Recruit and appoint Production Technicians, as

well as

implementation of a labour broker

for the Packers,

Cleaners and Forklift Drivers.

Once the Installation was completed,

resumed as the

Production Manager to lead and control

the Plant,

implementing all the production related

systems.

Implementation of the ISO 9001 Quality

system for

the New Plant.

Relieving as manufacturing manager when incumbent

resigned to be replaced.

Reason For Leaving: Transfer to Xactics Robbertville new compression

molding

Plant.

Date: Aug 2006 to May 2008

Reporting To: Henk de Klerk CEO

Position: Manufacturing manager

Duties: Complete plant installation of compression

molding and printing department.

Implement Pragma maintenance system and material

maintenance management system.

Control Production Maintenance,

warehouse.

Assist and control plant Services

equipment with

Technical department.

Reason For Leaving: Mondi bought out and advancement in the

technical and project

field.

Company: RTC Control systems

Dates: May 2008- 14 December 2009

Reporting To: Leon Barkhuizen MD (Owner) (011-***-****)

Joe Alexander General Manager

Position: Project Manager

Duties: Assist with planning and quote on Customers

electrical and process requirements.

Planning and control of electrical and process installation. Assist

electricians and assistance electricians with

installation work, technical information, crises

management, time control, petty cash control.

Feedback, report to project administrators and budget

control of the project. Depending on the area and

project, working on Site and living out.

Customer relationship plays a major part of the daily responsibility,

ensuring Staff adheres to Health and Safety

requirements.

Assist with new prospective Customer requirements. Quote on new work

requirements.

Responsible For: Depending on the size and labor intensity of the

project.

Typically, a site foreman with two to three electricians and 4 to six

electrical assistants. The project coordinator work

in from the office and communicate via Telephone and E-

mail.

Reason for leaving: Financial difficulties in the Technical project

sector.

No new outsource of projects from our clients, due to the recession.

Company: MCG SAMRAND

Dates: February 2010 to date

Reporting To: Tjaart van der Walt ( Managing Director)

Position: Production foreman

Duties: Assist with daily feedback and planning of the

production manufacturing facility, with the planning

and sales department.

Production through put of the injection and compression molding

department, meeting the planned production targets.

Personnel time keeping, lead and control production department.

Waste control, measurement and implementation of daily feedback with

the lean six sigma black belt support, assist

maintenance and production department to resolve

technical issues to cap production waste.

Lead quality controllers to inspect and assist team leaders to

minimize waste and maximize production through put.

Control personnel behavior and with the assistance of the HR

department implement people skills development

programs.

Responsible For: Injection and compression molding department.



Contact this candidate