J. Stephen Sharp
Murrieta, Ca. 92563
Cell 714-***-****
E-mail *******@*******.***
* ****** *********** ******** **** areas of expertise in Civil, Water /
Waste Water Piping, Mechanical, Food Processing, Facilities and
Environmental Engineering
Professional Experience
1 Inovx Solutions Inc., Irvine Ca
9/2008 to 9/2009
2 Quality Control Engineer / 3D Modeler
. Reviewed and corrected computer models of operating oil refineries.
. Created 3D models from laser scanned information (point clouds) of
existing plant equipment.
. Created linked logs that included information on equipment, pipe lines
and vessels. This process involved reading P&ID drawings and matching
the information to the equipment.
. All work was completed using Inovx proprietary software.
3 The Dennis Group LLC, Solona Beach Ca.
1/2008 to 8/2008
4 SENIOR DESIGN CONSULTANT / CONSTRUCTION MANAGER
. Designed and drafted plans for the Gallo Livingston Red Wine Fermenter
upgrades. These upgrades include pumps and piping for 57 fermentation
tanks ranging from 50,000 to 200,000 gallon tanks. This project is
valued at 3.5 million dollars.
. Construction Manager for the same project. This work involved managing
and directing Mechanical and Electrical contractors. Responsible for
work place inspections, change order approval, safety and receiving
and distribution of company supplied materials. As well as field
engineering. Project was completed under estimated time frame.
. Field verification (As Built) of a completed project for Gallo Winery,
Modesto, California.
. Designed and drafted plans for a pilot fermenter project for Gallo
Winery, Modesto, California.
. Product Piping layout design and connection details for a new tank
farm for Deageau Winery, Sanoma, Ca
Brown and Caldwell, Irvine Ca.
7/2007 to 10/2007
SENIOR DESIGN CONSULTANT (Civil)
. Designed and drafted plans and profiles for a replacement sewer main
feed system. The project involved relocating the sewer alignment to
accommodate environmentally sensitive areas along the Santa Ana River
and increase the size of the feed main.
. Drafted plans to reflect the needed easements required for permanent
use, as well as for temporary construction access. This was
accomplished by using County record maps, GIS maps and aerial
photographs as a basis for the alignment.
RBF Consulting, Temecula Ca.
10/2005 to 7/2007
DESIGNER (Water Resources)
. Designed and drafted plans for the conversion of a pumped sewer system
to a gravity system. This project was accomplished using Orange County
Sanitation District standards and formatting and is one of the
featured RBF projects.
. Designed, drafted and coordinated plans for the renovation of a sewer
lift station for the City of Coronado. The lift station was
particularly difficult because of the exposure to both ocean and
sewage atmospheres. The Project involved three offices and I
coordinated the distribution and assembly of the plans for
presentation to the client.
. Conducted various site visits, information gathering trips including
visits to job sites in San Bernardino, Vista, Lake Arrowhead and the
Murrieta area. Visits including site photos, equipment and facility
assessment and need for further investigation including pot holing and
utility searches.
. Designed and drafted plans for up grading existing water main
distribution piping for sites in Palm Desert and the Coachella valley.
. Designed water and sewer systems for new sub division developments.
Both on site and off site systems were addressed and designed with
standards from applicable agencies.
6 DMc Engineering, Irvine Ca.
2/2003 to 10/2005
ASSOCIATE ENGINEER (Civil)
. Designed and drafted civil grading and piping plans for a Federal Test
Sites water reclamation, monitoring and treatment facility using the
Agency Guide Lines and drafting standards for the Site.
. Designed and drafted Water, Sewer and General Standards for a local
Water District. These standards will be published and available on the
Districts Web Site.
. Created plans for the Replacement and Rehabilitation of valving for
City Water Distribution System.
. Drafted plans for the installation of a Chlorine Monitoring system and
enclosures for eleven reservoirs in the City Water Distribution
System.
7 Krieger & Stewart Inc., Riverside, Ca.
10 /2002 to 2/2003
8 SENIOR ENGINEERING DESIGN CONSULTANT (Civil / Water-Wastewater)
. Designed and created plans for the addition of a clarifier, pump
station and related equipment for a city treatment plant.
. Reviewed shop drawings and material lists for Water Agency approval.
. Drafted a profile of a large bore water distribution line.
9 Richard Brady and Associates, San Diego, Ca.
10/2001 to 10/2002
10 SENIOR ENGINEERING DESIGNER (Civil / Water-Wastewater)
. Design and draft plans for a Fluoride Feasibility Study for the County
of San Diego. This project involved the tapping of large diameter
water supply lines and the introduction, and monitoring of Fluoride
into the system. Plans included Photo images as well as standard
drafting.
. Design and draft plans for a new on shore fishing facility including
parking and maintenance access, sanitary facilities, irrigation supply
and potable water supply.
. Design and draft plans for rehabilitation of an existing municipal
potable water facility. Including the demolition of two reservoirs,
the replacement of the cover on a third 3 million gallon reservoir and
the demolition and reconstruction of a pumping and monitoring
facility. Incorporated photo images in the drawings to illustrate the
existing condition of the plant.
. Design and draft plans and profiles for piping relocation for a trunk
water supply line in San Diego, South County.
. Designed and drafted plans for the freeway crossing of large bore
water and sewer lines.
11 Dudek and Associates, Encinitas, Ca.
10/2000 to 10/2001
12 SENIOR ENGINEERING DESIGN CONSULTANT (Civil / Water-Wastewater)
. Design and draft plans for modification to an existing water supply
for an existing Military facility including pump stations and
distribution lines.
. Design and draft plans for a filtering facility for irrigation and
potable water supply. Plans included pumping stations, and detailed
pipe routing.
. Produced plans in conformance with existing Dudek & Assoc. standards.
Brown and Caldwell Consulting Engineers, Irvine Ca.
10/1999 to 9/2000
13 SENIOR ENGINEERING DESIGN CONSULTANT (Civil / Water-Wastewater)
. Created and implemented procedures for the electronic capture of
existing facilities and systems of an operating Waste Water Treatment
Plant.
. Prepared electronic files of systems and facilities for conversion to
a GIS format using record drawings of the existing plant.
. Preformed quality control functions for the assurance of accuracy and
completeness of information used in creating the GIS directories.
ASL Consulting Engineers, San Diego Ca. 1/ 1999 to 10/1999
14 SENIOR ENGINEERING DESIGN CONSULTANT (Civil / Water-Wastewater)
. Design and draft Civil, Mechanical and Piping plans for 16 million-
gallon Reservoir.
. Design and draft Civil and Piping plans for a Sewer Lift station.
. Designed and created a presentation concerning water usage and Water
District Areas.
. Performed Hydraulic modeling and flow analysis for existing 520
Regulatory Reservoir System
. Designed emergency sewer crossing replacement for failed sections.
Education
Portland Community College, Associates Degree, Civil Engineering Technology
Utah Technical College, (Sandy City Fire Dept.) Hazardous Materials,
Wildland Fire Suppression
Utah Technical College, (Kennecott Copper Corp.) Machinist Apprenticeship
Program
U.S. Air Force OJT program, Draftsman
Skills
AutoCAD through release 2007i, AutoCAD map, LDD, RealityLinx, Softdesk,
Eaglepoint, Quicksurf, Windows 95,98 and 2000, Windows NT, Word Perfect,
Windows Word, Arc View GIS, Manual Drafting. Field Engineer, Construction
Manager, Field Technician