CURICULUM VITAE
NAME : MANGARERAK MANURUNG
POSITION : MECHANICAL & E / I SUPERINTENDENT
PLACE & DATE OF BIRTH : MEDAN – PORSEA, OCTOBER 25, 1958
NATIONALITY : INDONESIAN
RELIGION : CHRISTIAN
MARRITAL STATUS : MARRIED
EDUCATION : TECHNICAL HIGH SCHOOL
HOME ADDRESS : BATU MERAH, RT.19 RW.06 NO.30 BATAM
HP NO. : 081*********
EXPERIENCE :
A.
- February 2013 – Now
I am worked at PT DHS (Dresindo Harapan Sukses) ang my position
E/I Supervisor for project Becthel.
05 Desember 2011 – 09 July 2012
I am worked at Mc CONNELL DOWEL and my position Piping Supervisor for
Koniambo Nickel Project – New Caledonia.
17 Desember 2010 – 16 April 2011
I am worked at PT. GEMA PERKASA and my position Field Supervisor for PT. TOYO
KANETSU INDONESIA
2007 – 2010
I am worked at MMHE SDN BHD and my position Mechanical Superintendent for PCA
Project and TANGGA BARAT CLUSTER PETRONAS Project . to make planning for
Install equipment and monitoring Sub Contractor. After finish install. Re leveling and
QC to make Inspection Test Record before hand over to Commissioning Team for start
up.
I am worked at ROTARY MEC ENGINEERING SDN BHD and my position E & I
Superintendent for GUMUSUT KAKAP Petronas Project. To make Planning from the
start fabricate support untill to start install on the site. Me monitoring sub.contractor
and estimating presentation .and paper work to report.
2006 – 2007
I am worked at ROMANIA FABRICATION SDN BHD my position Mechanical for E &
I Supervisor for TALISMAN Project Bunga Raya and Bunga Orkid, client give me
Certificate becouse project sucses untill to load out. Me monitoring all Sub Contractor
and to make planning from fabricate support and install support untill to leveling by
QC. All protection suppot ready, can to planning install equipment and re leveling also,
inspection by client with me. After complete ITR, ready for hand over to
Commissioning Team.
2004 – 2006
I am worked at SIME DARBY ENGINEERING SDN BHD my position E & I
Supervisor for YOHO Project ( SAIPEM ) BUNGA RAYA Project, AMENAM Project
( SAIBOS ) I make planning work and monitoring, estimating schedule . Paper work
report to Project Manager every week and meeting with Client consultation for
modification job.
All fabricate support electrical and instrument support untill to instalation on the site me
monitoring acording lay out drawing and check elevation also, before install cable tray,
After that me want to make planning for start pulling cable and install cable gland and
termination in MCC Room or Switgear Room also with equipment on the site.
2002 2004
I am worked at CLEVELAND BRIGDE ENGINEERING SDN BHD my position E & I
Supervisor for TNB PORT DICKSON Project and Hongkong Steam Power Plant. All
fabricate support and install to site me monitoring and planning also acording to follow
schedule. Electrical and Instrument support install by Sub Contractor the following to
drawing with elevation, before install cable tray. After that can to start pulling cable and
dressing cable. Install cable gland and termination in MCC Room and Switchgear
Room and J.Box also but complete after continouty test and meggering all cable before.
1999 – 2002
I am worked at ALSTOM PAREMBA my position E & I Comissioning
Supervisor for TNB MANJUNG Project Malaysia . Me to make inspection all
electrical and instrument job, if not acording to standaritation or specification, give
punch list to Sub Contractor and re inspection to accepted.All modification job also me
to check ready done or not so my team to check all glanding cable and termination
before start for test untill to start up all equipment and motor.
1997 – 1998
I am worked at PT. McDermott Indonesia to work for TOTAL YADANA PROJECT,
MOBIL OIL NSO ( North Sumatera Off Shore ) PROJECT and then UNOCAL
PAILIN LINING QUARTER, MSF SUPER STRUCTURE AND 10 PILES MODUL
DECK, my position was an Electrical Supervisor. Me to handling all my employe 60
person for install cable tray suppot, lighting support, j.box support also and after that
can start install cable tray install lighting and j.box. Install MCC Panel, Switchgear and
Controll Panel, after the complete me to planning for pulling cable. Start pulling cable
from Generator to Switchgear and from Switchgear to MCC of main line and after that
can start pulling to lighting and all equipment on the site. After dressing cable, ready
start for glanding cable and termination all, but before start glanding or termination,
already done test with meggering cable, all this my respon untill to complete before
commissioning team testing for start up.
1996 – 1997
I am worked at MECXIS PROJECT ENGINEERING SDN BHD Kuala Lumpur and my
position was an Electrical/Piping Supervisor and then joined to
PRECOMMISSIONING. All piping support and electrical support the fabricate with
instalation my responsibility and than to erection also. The planning and paper work all
my scope give information to my Project Manager and estimate schedule how to
complete this job before time schedule. All piping to flushing and hydrotesting I
monitoring and last for reinstatement and inspection with client to aproved sucses.
1996 – 1996
I am worked at PT. PETRONAS TRI TUNGGAL JAKARTA, then transferred BOUGES
OFF SHORE INDONESIA at Samarinda, East Kalimantan, my position was an
Electrical Supervisor. Me start work at Tg Uncang area Batamas Jala Nusantara –
Batam on the barge and load out to Tunu install pipe line from Tunu Sea untill to Badak
. All electrical job my responsibility and install automatic balancing system in the barge
and acomodation barge off shore, and maintenance lighting with generator on the
barge.
1990 – 1996
I am worked at PT. McDermott Indonesia, Batam Base. The Projects to be assigned :
ACT 06 ( CHINA ) HZ 26 1 8 PILES DECK
ENTERPRISE BAWEAN OIL COMPANY INDONESIA CPP/WPP
PILES DECK
ARII BL/BNA 4 PILES DECK ARII B2C / MOD BIC 8 PILES
DECK
TOTAL WP 1,2,3,4,5,6 4 PILES DECK TOTAL PP
8 PILES DECK and LIVING QUARTER DECK WOOD SIDE
( AUSTRALIA ) GWA JACKET and MSF MARATHON KRA
NATUNA INDONESIA 8 PILES DECK, KG 4
PILES DECK and LIVING QUARTER
TOTAL WP 7 & 8 “ 1960 “ 4 PILES DECK FOSTER
WHEELER “ 1936 “ 100 UNITS MODULE
( THAILAND )
CALTEX PACIFIC INDONESIA, 80 UNITS STEAM
GENERATOR
POGO A & B 4 PILES DECK .
I am to planning fabrication all electrical support and lighting support,and second time
to install support after finish blasting and painting. Me to monitoring on the site and
planning again to install cable tray and install lighting also. If ready can to pulling
cable, me give another team for pulling cable,start from generator to Switchgear and to
MCC also of main line cable,and after that can to planning again from MCC and
Lighting J.Box go to files, All cable dressing before starting install cable gland and
termination,but cable also all ready continouty with meggering test isolator. All electric
job is complete before the schedule,only scope off shore out standing.
1988 – 1990
I am worked at PT. RESOURCES JAYA TECHNIC MANAGEMENT INDONESIA,
Duri, Dumai in making a CALTEX OIL PLACE as a Commissioning. For start up
Steam Injection . All electrical and instrument job from the fabricate support with
installation on the site and pulling cable by construction team,but my team for re check
and continouty cable and termination before start up acording to my operation diagram
drawing. Be have 24 units steam injuction Caltex in area 4 DSF Duri Riau and this the
control from anniciator control room and MCC room also.
1987 – 1988
I am worked at PT. KERTA ANUGRAH PERKASA, PORSEA, transferred to
CEILCOTE PTE. LTD, and then transferred to CV. SAPTA KRIDA. I am working in
Kerta Anugrah Perkasa for install transformer and J.Box for electricalsystem and
lighting to all employe, pulling cable and termination in J.Box lighting and
transformer. I am working for CEILCOTE pte ltd Electrician Supervisor but me also
asisten mixer chemical.
1985 – 1986
I am worked at PT. KARPINDO ANDALAS, PLTU ( STEAM POWER PLANT ) Bukit
Asam – Palembang and then transferred to CGEE ALSTHOM. Me electrician special
in MCC Room and Control Room for glanding cable and termination,becouse me
already sucses before in Belawan Steam Power Plant same also ALSTHOM project.
1983 – 1984
I am worked at PT. MEGA ELTRA ELECTRIC AND INSTRUMENTATION, PLU
( STEAM POWER PLANT ) Sicanang – Belawan and then transferred to ALSTHOM
ATLANTIQE, in this company I GET a testimonial energoinvest. Me specialis for
Relay Room and Control Room after test by ALSTHOM. All install relay in panel and
terminal block me handling . Glanding and termination cable in MCC Room and
Control Room only my self and than modification job also client only give to me. After
complete job in Relay Room and Control Room, me follow my Engineering for
commissioning job to start up.
1975 – 1976
I am worked at BETHTEL LNG as Electrical Technician, me dressing cable before start
for glanding and termination in J.Box or Panel. Re check all wires or cable before on
power from Distribution Panel to Lighting J.Box.
B. COURSES THAT HAD BEEN CARRIED OUT :
SAFETY TRAINING OBSERVATION PROGRAM COURSE
MANAGEMENT SUPERVISOR SKILL COURSE
QUALITY WORKING GROUP COURSE
ELECTRICAL SAFETY & RIGGING SAFETY COURSE
I Hereby inform you that my statements are correct, and I would like to
come for an interview as soon as yaou want to.
Regards,
( MANGARERAK MANURUNG )
APLICANT