Post Job Free

Resume

Sign in

Project Manager Power Plant

Location:
Indonesia
Posted:
October 05, 2013

Contact this candidate

Resume:

CURICULUM VITAE

NAME : MANGARERAK MANURUNG

POSITION : MECHANICAL & E / I SUPERINTENDENT

PLACE & DATE OF BIRTH : MEDAN – PORSEA, OCTOBER 25, 1958

NATIONALITY : INDONESIAN

RELIGION : CHRISTIAN

MARRITAL STATUS : MARRIED

EDUCATION : TECHNICAL HIGH SCHOOL

HOME ADDRESS : BATU MERAH, RT.19 RW.06 NO.30 BATAM

HP NO. : 081*********

EXPERIENCE :

A.

- February 2013 – Now

I am worked at PT DHS (Dresindo Harapan Sukses) ang my position

E/I Supervisor for project Becthel.

05 Desember 2011 – 09 July 2012

I am worked at Mc CONNELL DOWEL and my position Piping Supervisor for

Koniambo Nickel Project – New Caledonia.

17 Desember 2010 – 16 April 2011

I am worked at PT. GEMA PERKASA and my position Field Supervisor for PT. TOYO

KANETSU INDONESIA

2007 – 2010

I am worked at MMHE SDN BHD and my position Mechanical Superintendent for PCA

Project and TANGGA BARAT CLUSTER PETRONAS Project . to make planning for

Install equipment and monitoring Sub Contractor. After finish install. Re leveling and

QC to make Inspection Test Record before hand over to Commissioning Team for start

up.

I am worked at ROTARY MEC ENGINEERING SDN BHD and my position E & I

Superintendent for GUMUSUT KAKAP Petronas Project. To make Planning from the

start fabricate support untill to start install on the site. Me monitoring sub.contractor

and estimating presentation .and paper work to report.

2006 – 2007

I am worked at ROMANIA FABRICATION SDN BHD my position Mechanical for E &

I Supervisor for TALISMAN Project Bunga Raya and Bunga Orkid, client give me

Certificate becouse project sucses untill to load out. Me monitoring all Sub Contractor

and to make planning from fabricate support and install support untill to leveling by

QC. All protection suppot ready, can to planning install equipment and re leveling also,

inspection by client with me. After complete ITR, ready for hand over to

Commissioning Team.

2004 – 2006

I am worked at SIME DARBY ENGINEERING SDN BHD my position E & I

Supervisor for YOHO Project ( SAIPEM ) BUNGA RAYA Project, AMENAM Project

( SAIBOS ) I make planning work and monitoring, estimating schedule . Paper work

report to Project Manager every week and meeting with Client consultation for

modification job.

All fabricate support electrical and instrument support untill to instalation on the site me

monitoring acording lay out drawing and check elevation also, before install cable tray,

After that me want to make planning for start pulling cable and install cable gland and

termination in MCC Room or Switgear Room also with equipment on the site.

2002 2004

I am worked at CLEVELAND BRIGDE ENGINEERING SDN BHD my position E & I

Supervisor for TNB PORT DICKSON Project and Hongkong Steam Power Plant. All

fabricate support and install to site me monitoring and planning also acording to follow

schedule. Electrical and Instrument support install by Sub Contractor the following to

drawing with elevation, before install cable tray. After that can to start pulling cable and

dressing cable. Install cable gland and termination in MCC Room and Switchgear

Room and J.Box also but complete after continouty test and meggering all cable before.

1999 – 2002

I am worked at ALSTOM PAREMBA my position E & I Comissioning

Supervisor for TNB MANJUNG Project Malaysia . Me to make inspection all

electrical and instrument job, if not acording to standaritation or specification, give

punch list to Sub Contractor and re inspection to accepted.All modification job also me

to check ready done or not so my team to check all glanding cable and termination

before start for test untill to start up all equipment and motor.

1997 – 1998

I am worked at PT. McDermott Indonesia to work for TOTAL YADANA PROJECT,

MOBIL OIL NSO ( North Sumatera Off Shore ) PROJECT and then UNOCAL

PAILIN LINING QUARTER, MSF SUPER STRUCTURE AND 10 PILES MODUL

DECK, my position was an Electrical Supervisor. Me to handling all my employe 60

person for install cable tray suppot, lighting support, j.box support also and after that

can start install cable tray install lighting and j.box. Install MCC Panel, Switchgear and

Controll Panel, after the complete me to planning for pulling cable. Start pulling cable

from Generator to Switchgear and from Switchgear to MCC of main line and after that

can start pulling to lighting and all equipment on the site. After dressing cable, ready

start for glanding cable and termination all, but before start glanding or termination,

already done test with meggering cable, all this my respon untill to complete before

commissioning team testing for start up.

1996 – 1997

I am worked at MECXIS PROJECT ENGINEERING SDN BHD Kuala Lumpur and my

position was an Electrical/Piping Supervisor and then joined to

PRECOMMISSIONING. All piping support and electrical support the fabricate with

instalation my responsibility and than to erection also. The planning and paper work all

my scope give information to my Project Manager and estimate schedule how to

complete this job before time schedule. All piping to flushing and hydrotesting I

monitoring and last for reinstatement and inspection with client to aproved sucses.

1996 – 1996

I am worked at PT. PETRONAS TRI TUNGGAL JAKARTA, then transferred BOUGES

OFF SHORE INDONESIA at Samarinda, East Kalimantan, my position was an

Electrical Supervisor. Me start work at Tg Uncang area Batamas Jala Nusantara –

Batam on the barge and load out to Tunu install pipe line from Tunu Sea untill to Badak

. All electrical job my responsibility and install automatic balancing system in the barge

and acomodation barge off shore, and maintenance lighting with generator on the

barge.

1990 – 1996

I am worked at PT. McDermott Indonesia, Batam Base. The Projects to be assigned :

ACT 06 ( CHINA ) HZ 26 1 8 PILES DECK

ENTERPRISE BAWEAN OIL COMPANY INDONESIA CPP/WPP

PILES DECK

ARII BL/BNA 4 PILES DECK ARII B2C / MOD BIC 8 PILES

DECK

TOTAL WP 1,2,3,4,5,6 4 PILES DECK TOTAL PP

8 PILES DECK and LIVING QUARTER DECK WOOD SIDE

( AUSTRALIA ) GWA JACKET and MSF MARATHON KRA

NATUNA INDONESIA 8 PILES DECK, KG 4

PILES DECK and LIVING QUARTER

TOTAL WP 7 & 8 “ 1960 “ 4 PILES DECK FOSTER

WHEELER “ 1936 “ 100 UNITS MODULE

( THAILAND )

CALTEX PACIFIC INDONESIA, 80 UNITS STEAM

GENERATOR

POGO A & B 4 PILES DECK .

I am to planning fabrication all electrical support and lighting support,and second time

to install support after finish blasting and painting. Me to monitoring on the site and

planning again to install cable tray and install lighting also. If ready can to pulling

cable, me give another team for pulling cable,start from generator to Switchgear and to

MCC also of main line cable,and after that can to planning again from MCC and

Lighting J.Box go to files, All cable dressing before starting install cable gland and

termination,but cable also all ready continouty with meggering test isolator. All electric

job is complete before the schedule,only scope off shore out standing.

1988 – 1990

I am worked at PT. RESOURCES JAYA TECHNIC MANAGEMENT INDONESIA,

Duri, Dumai in making a CALTEX OIL PLACE as a Commissioning. For start up

Steam Injection . All electrical and instrument job from the fabricate support with

installation on the site and pulling cable by construction team,but my team for re check

and continouty cable and termination before start up acording to my operation diagram

drawing. Be have 24 units steam injuction Caltex in area 4 DSF Duri Riau and this the

control from anniciator control room and MCC room also.

1987 – 1988

I am worked at PT. KERTA ANUGRAH PERKASA, PORSEA, transferred to

CEILCOTE PTE. LTD, and then transferred to CV. SAPTA KRIDA. I am working in

Kerta Anugrah Perkasa for install transformer and J.Box for electricalsystem and

lighting to all employe, pulling cable and termination in J.Box lighting and

transformer. I am working for CEILCOTE pte ltd Electrician Supervisor but me also

asisten mixer chemical.

1985 – 1986

I am worked at PT. KARPINDO ANDALAS, PLTU ( STEAM POWER PLANT ) Bukit

Asam – Palembang and then transferred to CGEE ALSTHOM. Me electrician special

in MCC Room and Control Room for glanding cable and termination,becouse me

already sucses before in Belawan Steam Power Plant same also ALSTHOM project.

1983 – 1984

I am worked at PT. MEGA ELTRA ELECTRIC AND INSTRUMENTATION, PLU

( STEAM POWER PLANT ) Sicanang – Belawan and then transferred to ALSTHOM

ATLANTIQE, in this company I GET a testimonial energoinvest. Me specialis for

Relay Room and Control Room after test by ALSTHOM. All install relay in panel and

terminal block me handling . Glanding and termination cable in MCC Room and

Control Room only my self and than modification job also client only give to me. After

complete job in Relay Room and Control Room, me follow my Engineering for

commissioning job to start up.

1975 – 1976

I am worked at BETHTEL LNG as Electrical Technician, me dressing cable before start

for glanding and termination in J.Box or Panel. Re check all wires or cable before on

power from Distribution Panel to Lighting J.Box.

B. COURSES THAT HAD BEEN CARRIED OUT :

SAFETY TRAINING OBSERVATION PROGRAM COURSE

MANAGEMENT SUPERVISOR SKILL COURSE

QUALITY WORKING GROUP COURSE

ELECTRICAL SAFETY & RIGGING SAFETY COURSE

I Hereby inform you that my statements are correct, and I would like to

come for an interview as soon as yaou want to.

Regards,

( MANGARERAK MANURUNG )

APLICANT



Contact this candidate