Post Job Free
Sign in

Engineer Manager

Location:
Los Angeles, CA
Posted:
October 06, 2013

Contact this candidate

Resume:

Yaroslav (Ben) Khait

***** ******* ** #**

Tarzana, CA 91356

323-***-****

*****.*****@*****.***

QUALIFICATION SUMMARY

* ***** ** ********** ** semiconductors industry

* ***** ** ********** *n HVAC and appliances industry

Industrial / Manufacturing Engineer in construction project

Senior Equipment technician in high volume manufacturing (Clean Room)

B.S. Industrial management (Minor: Information Systems) and Associate Engineer in Electronics.

Languages: English, Hebrew, Russian

PROFESSIONAL EXPERIENCE

West Coast Chief Repair, Inc 10/2006 to current

Office manager

Supervises staff that installs, repair and maintain heating and air conditioning systems in residences

and commercial buildings.

Office manager: managing customer service call center

Safety Manager: comply with safety regulations and ensure employees acquire necessary

certifications.

Buyer: Managing parts, HVAC equipment and supplies for the company

Obtaining Mechanical Permits (Building & Safety) and leading demolition and installation HVAC

projects

Hire new employees and train staff to test electrical circuits, wire components and electrical

equipment; inspect and test different HVAC systems.

Sales Manager : Responsible for all sales of appliances and HVAC, managing warehouse and

inventory

Intel Electronics 11/1997 to 10/2006

Industrial /Manufacturing Engineer in construction project

Responsible to ensure TI execution meets layout plans (Field=Layout) by participate in design

reviews, sign architecture pages, own tools datum point marking, perform field verification and

complete sign off process.

Accountable for Warehouse budget tracking.

Manage the Functional Area EDB (Equipment Data Base) content; align with Eng tool owner,

Construction tool owner, Functional area leader and Manufacturing Engineers. Tracking PR’s and

PO’s (Purchasing order) - working with materials buyers and Logistic team.

Involvement in LRP cycle and transition starting EMS till Lay Out release, dealing with schedule

leveling, duration reduction and move in / move out sequence and pass of demolition/install

equipment

Provide cost effective solution, lead escalation in EDB, design, schedule and any Lay Out conflicts.

Driving Lay out changes in functional area, execute Lay out change requests from the floor.

Responsible for Workstations, Global Items and Support equipment in Clean room area by planning

Layout, budgeting, ordering and instructing contractors to install equipment.

Leading the Mfg readiness process to ensure bays and chases are ready prior delivery to

Manufacturing.

Key interface between Tool Install and ME (Manufacturing Engineering department), integration with

manufacturing, engineering, ergo, materials, warehouse, functional area planners.

Contact with many various outside and inside vendors - for designs decision and price quotations

Equipment & Process Maintenance Team Leader

Managed team work in day/night 12-hour shifts, responsible for maintenance and improvement of

product quality; issuing procedures, action plans

for non-standard situations and diagnosis of process and equipment problems

Action: functioned in Clean Room environment according to ISO 9001 standards and

requirements; demonstrated team spirit, flexibility and solid interpersonal skills;

Determined areas for improvement and developed BKMs and standardization through

implementation of Standard Operating Procedures and Work Instructions; managed all aspects of

equipment corrective and preventative maintenance of several tool sets built on AMAT Endura 5500

mainframe.

Result: earned awards for increase in quality output, for initiation and creativity in finding root cause

resolutions

Leaded LEAN Manufacturing Project in TF area, implemented 5S Technique

Result: TF area was chosen as best and well-organized workplace complete with visual controls and

order.

Trained personal using SPC to identify UCL, LCL, targets and additional inspection requirements to

maintain high level of quality output and high yield; designed various procedures and on-job-training

related to robots and equipment calibration, electrical testing and troubleshooting, vacuum

technology, AC/DC generators, RF power supplies, mechanics and pneumatics troubleshooting

Result: improved cycle time performance and reduced execution time by 25%

(PM duration was reduced from 12 to 9 hours, which was cost effective as well)

EDUCATION AND TRAINING

B.S. Industrial management and Information System, Sapir Academic College, Israel 2004

Associate Engineer in Electronics, Singalovsky Technologic College, Israel 1997

Completed 2 years of B.S., Electrical Engineering, Shipbuilding University, Ukraine1994

Equipment training courses:

Endura HP/VHP PVD functional description & basic troubleshooting (Applied Materials, Austin, TX)

Endura HP/VHP PVD advanced corrective and preventive maintenance (Applied Materials, Austin, TX)

Endura Intel MDP SKILLS PRACTICE (Applied Materials, Austin, TX)

Endura CVD (Adhesion Technology)

Vacuum technology (Helix)

Robotics and RF Plasma Systems (Intel)

COMPUTER SKILLS

Proficient in MS Windows, Outlook, Power Point and Excel

Beginner in Visual Basic, C++, ACCESS, Java, SQL

Reference: Available upon request



Contact this candidate