Yaroslav (Ben) Khait
Tarzana, CA 91356
*****.*****@*****.***
QUALIFICATION SUMMARY
* ***** ** ********** ** semiconductors industry
* ***** ** ********** *n HVAC and appliances industry
Industrial / Manufacturing Engineer in construction project
Senior Equipment technician in high volume manufacturing (Clean Room)
B.S. Industrial management (Minor: Information Systems) and Associate Engineer in Electronics.
Languages: English, Hebrew, Russian
PROFESSIONAL EXPERIENCE
West Coast Chief Repair, Inc 10/2006 to current
Office manager
Supervises staff that installs, repair and maintain heating and air conditioning systems in residences
•
and commercial buildings.
Office manager: managing customer service call center
•
Safety Manager: comply with safety regulations and ensure employees acquire necessary
•
certifications.
Buyer: Managing parts, HVAC equipment and supplies for the company
•
Obtaining Mechanical Permits (Building & Safety) and leading demolition and installation HVAC
•
projects
Hire new employees and train staff to test electrical circuits, wire components and electrical
•
equipment; inspect and test different HVAC systems.
Sales Manager : Responsible for all sales of appliances and HVAC, managing warehouse and
•
inventory
Intel Electronics 11/1997 to 10/2006
Industrial /Manufacturing Engineer in construction project
Responsible to ensure TI execution meets layout plans (Field=Layout) by participate in design
•
reviews, sign architecture pages, own tools datum point marking, perform field verification and
complete sign off process.
Accountable for Warehouse budget tracking.
•
Manage the Functional Area EDB (Equipment Data Base) content; align with Eng tool owner,
•
Construction tool owner, Functional area leader and Manufacturing Engineers. Tracking PR’s and
PO’s (Purchasing order) - working with materials buyers and Logistic team.
Involvement in LRP cycle and transition starting EMS till Lay Out release, dealing with schedule
•
leveling, duration reduction and move in / move out sequence and pass of demolition/install
equipment
Provide cost effective solution, lead escalation in EDB, design, schedule and any Lay Out conflicts.
•
Driving Lay out changes in functional area, execute Lay out change requests from the floor.
Responsible for Workstations, Global Items and Support equipment in Clean room area by planning
•
Layout, budgeting, ordering and instructing contractors to install equipment.
Leading the Mfg readiness process to ensure bays and chases are ready prior delivery to
•
Manufacturing.
Key interface between Tool Install and ME (Manufacturing Engineering department), integration with
•
manufacturing, engineering, ergo, materials, warehouse, functional area planners.
Contact with many various outside and inside vendors - for designs decision and price quotations
•
Equipment & Process Maintenance Team Leader
Managed team work in day/night 12-hour shifts, responsible for maintenance and improvement of
•
product quality; issuing procedures, action plans
for non-standard situations and diagnosis of process and equipment problems
Action: functioned in Clean Room environment according to ISO 9001 standards and
requirements; demonstrated team spirit, flexibility and solid interpersonal skills;
Determined areas for improvement and developed BKMs and standardization through
•
implementation of Standard Operating Procedures and Work Instructions; managed all aspects of
equipment corrective and preventative maintenance of several tool sets built on AMAT Endura 5500
mainframe.
Result: earned awards for increase in quality output, for initiation and creativity in finding root cause
resolutions
Leaded LEAN Manufacturing Project in TF area, implemented 5S Technique
•
Result: TF area was chosen as best and well-organized workplace complete with visual controls and
•
order.
Trained personal using SPC to identify UCL, LCL, targets and additional inspection requirements to
•
maintain high level of quality output and high yield; designed various procedures and on-job-training
related to robots and equipment calibration, electrical testing and troubleshooting, vacuum
technology, AC/DC generators, RF power supplies, mechanics and pneumatics troubleshooting
Result: improved cycle time performance and reduced execution time by 25%
(PM duration was reduced from 12 to 9 hours, which was cost effective as well)
EDUCATION AND TRAINING
B.S. Industrial management and Information System, Sapir Academic College, Israel 2004
Associate Engineer in Electronics, Singalovsky Technologic College, Israel 1997
Completed 2 years of B.S., Electrical Engineering, Shipbuilding University, Ukraine1994
Equipment training courses:
Endura HP/VHP PVD functional description & basic troubleshooting (Applied Materials, Austin, TX)
•
Endura HP/VHP PVD advanced corrective and preventive maintenance (Applied Materials, Austin, TX)
•
Endura Intel MDP SKILLS PRACTICE (Applied Materials, Austin, TX)
•
Endura CVD (Adhesion Technology)
•
Vacuum technology (Helix)
•
Robotics and RF Plasma Systems (Intel)
•
COMPUTER SKILLS
Proficient in MS Windows, Outlook, Power Point and Excel
Beginner in Visual Basic, C++, ACCESS, Java, SQL
Reference: Available upon request