Profile

Personal Summary: Self motivated, Make the best contribution to the group objectives,

Enthusiasm, group working, Situational and contingency thinking according to

the circumstances,

Technical Summary:

Provision of Instrument Data Sheets(flow-temperature-level-

pressure-Control valves),

Preparation FCS/DCS/ESD(IEC-61511&61508)/F&G

specification

Preparation of control system block diagram

• Preparation of Instrument Index

• Preparation of Package control system block diagram

• Provision of Instruments Technical Specifications

• Prepare the Calculations for different types of

instruments(flow elements-control valves sizing- thermo-well

stress analyzes )

• Provision of I/O lists for Control system and Emergency Shut

Down system (ESD)

• Provision of Material Requisitions for Instrument items and

then Technical Queries with Vendors, Prepare the TBA

(Technical Bid Analysis), Provision of Purchase Requisition and

after all, Vendors Documents review and checking and selection

Familiar with API Standards/ANSI/ISA/IEC/ISO/Hazardous

area classification(API500 and zone definition based on IEC-

60079)

Familiar With the General Principle of

Management/Computer skills/ WBS/ Centum3000

YOKOGAWA

Participating in the 2 HAZOP and SIL studies(IEC-

61511&61508)

FAT participating

Professional Certificate and membership

YOKOGAWA centum3000 DCS engineering degree

An introduction to MBA course from Fars management center

SIL study certificate

Calibration certificate

Member of Iranian society of instrument and control Engineers

Member of Organization for engineering order of building

Achieved electrical design and supervision permit from Iranian Ministry of urban and Housing

Attending various seminars and conferences related to electrical design of building held by

organization for engineering order of building.

Education

UNIVERSITY: Shiraz Electrical and Electronic Engineering University

Bachelor Of Science in Electrical & Electronics

Qualifications:

Date: 2002

Software Capability

CONVAL Sizing Program (flow element-control valve-safety valve)

Fisher for control valve sizing software

INSFLOW (flow element sizing)

METSO for control valve sizing software

Microsoft office

Plant Design

Relevant Employment History

1-Hampa Energy Engineering & Design Company (Shiraz – IRAN)

Date: Apr 2011 –Continue

Position/title: Lead Engineer (control & Instrumentation Dep.)

Project: Parsian C2 + Recovery & Fractionation Gas Refinery (Basic & Detail eng.)

Razi third Ammonia Storage Tank (EPCC)

Fasa LDPE (300.000 TPY Low Density Poly Ethylene) petrochemical

complex

Responsibilities: (Engineering+ Procurement)

• Attending coordination meeting with project manager and other

disciplines to satisfy owner.

• Supervised all operations required for control system and field device

engineering and selection.

• Implement or define all necessary material or manpower resources

• Answer questions and comments by owner (technical query)

• Review and approve vendor documents

• Check the calculated data (if needed) for instrument such as orifice

sizing, control valve sizing.

• Material requisition and approval

• Basic engineering/ detail engineering

• Procurement services

• Hazop and SIL study (C2 plant+ LDPE plant)(based on

IEC61511&IEC61508)

• Kick of meeting participation

• Instrument and system Package selection (Turbo compressor – Gas

turbine)

• FAT participation for refrigeration compressor (API-670 FOR MMS)

2-kavian Petrochemical complex (South Pars Gas Zone – IRAN) 2000000 tone/year Ethylene

(EPC)

Designer: NARGAN (IRAN)

Date: Jan2010-Apr 2011

Position/title: Lead Engineer (control & Instrumentation Dep.) (Detail phase)

Responsibilities: (Engineering & Procurement & commissioning)

Attending coordination meeting with project manager and

other disciplines to satisfy owner.

Supervised all operations required for equipment and field

device selection

Study and analyze of the instrument documents

Answer all questions likely to be asked by Contractor(technical query)

Review and approve Vendor documents

Calculate the data (for instrument such as orifice sizing

based on ISO5167, Control valve sizing based on ISA 75.01

and thermo-well wake frequency based on ASTM PTC-19.3.

Instrument analyses and selection the field device and final

elements(control valves)

Material requisition and approve

Loop diagram preparation checked

Checking the prepared Instrument Data Sheets,

Checking the prepared FCS/DCS/ESD/F&G specification

Control system FAT participating

3-GHADEER PETROCHEMICAL co. (MAHSHAHR Special Energy ZONE- IRAN) VCM-PVC Plant

Designer: MITSOI (Japan) (EPCC)

Date: MAR 2008- Jan 2010

Position/Title: Lead Engineer (Control & Instrumentation Dep.)

Responsibilities: (Engineering,commissioning & startup, operation)

DCS Centum3000 YOKOGAWA system start up(PVC

plant)

Implement and improve the system database project

file(DCS)

Upgrade the DCS system by adding cards and

programming for new field instrument

Design and analyze the new instrument field device

Start up of the site compressor(centrifugal and screws

and reciprocate type) with the help of Machinery

Specialist (Ingersoll Rand-Siemens)

prepare and calculate the instrument data sheets for bid

Material requisition and selection

Estimate the type of repairs to be carried out during

plant normal activity or shutdowns

Define the suitable procedure for repair of any defect

and supervise the repairs

Analysis of the plant operations and control system for

a more precise definition

Site Acceptance Test: consistency and functionality test

for the applications

Supervise on loop checking

Supervise on Functional test (system and field devices)

Spare parts preparation for erection and/or start-up

Review the device documents for operation

Maintenance manuals both during construction, start-up

& commissioning phases

4-ZAGROOS Petrochemical complex (South Pars Gas Zone – IRAN) 1650000ton/year Methanol

plant (EPC)

Designer: Joint venture of LURGII (ITALY) & PIDEC (IRAN)

Jan 2006- Mar 2008

Date:

Position/Title: Senior Engineer (Instrument And Control Dep.)

Responsibilities (Engineering,construction & commissioning)

prepared Instrument Data Sheets

prepared FCS/DCS/ESD/F&G specification

Prepared the Instruments Technical Specifications

Prepare the Calculations for different types of

instruments(orifice ISO5167-control valves ISA75.01-

venturi)

MTO preparing

5-FANAVARAN petrochemical complex (MAHSHAHR Special Energy Zone- IRAN) Methanol plant

Designer: Joint venture of Snamprogetti & SAZEH (IRAN)

Date: Jan2003 -Jan2006

Position/Title: Instrument & control engineer

Responsibilities (construction & commissioning)

Supervise on construction and install the instrument field device and system.

Supervise on the sub contractor role/ Supervise on Erection of the instrument

Prepare WBS, Mc book, MTO’s

Preparing the Balance of material

Check the sub contractor invoice/prepare the invoice

Prepared Instrument Data Sheets

check the actual and programmed progress

Languages

English fluent (IELTS ACADEMIC 6.5,General 6.5)

Personal interest and hobbies

Mountaineering (do it for about 17 years, Coach), Swimming, Astronomy