Steven McCurley
**************@*****.***
504-***-**** Cell
OBJECTIVE:
Seeking to be employed with a company of good character.
Willing to work in areas of previous
experience or to learn new types of skills and circumstance.
SKILLS:
Highly trained in all areas of Central Office Installations. Able to manage crews and
multiple projects, with excellent quality and within budgeted hours. Extensively trained
in TP76300, AT&T, Verizon & Qwest installation standards.
Proficient in 568 A/B wiring standards. Interfacing with
the customer and local personnel, implementation walks and
adjustments, EIA/TIA standards, fiber and copper cable
testing with a variety of testers used, and knowledge of QA
standards and procedures. Detail-minded, excellent
communication skills, a team player that is committed to
quality, and highly organized with a positive attitude.
Able to delegate tasks and finish complex
projects, working in high-pressure environments is not a problem.
EDUCATION:
Calico Rock High School
May 1982/Diploma
Ozarka Technical College
September 1983
Basic Computer Course/Certificate
Nortel and Bell
Standards Training
April 1997/Certificate at 98.2%
Asbestos Awareness Training
August 1997/Certificate
WORK HISTORY
ADC/TE Connectivity/BlueStream Professional Services
Faribault, MN
Field Service Technician Level 4 02/10-03/13
Job duties, to manage and supervise company employees and contractors to complete
jobs within budgeted time. Installation of all types of Central Office equipment, power
cuts, testing of equipment installed, scoping and testing of fibers, troubleshooting,
BNC’s, wire wrapping, cabling, ironwork, fire stopping. Extreme knowledge of
TP76300, AT&T, and Qwest installation Standards. Job walkthroughs with team. Great
communications with customer, engineers, quality inspectors, and project managers.
From start to finish all paperwork involved with quality installations.
T-Staff
Marietta, Georgia
07/08-2/10
Central Office Technician Level 4
Installation of all types of Central office equipment, Cisco, Redback, Alcatel, Lucent,
Fujitsu, etc…. Knowledge and understanding of installation practices of Bellsouth,
AT&T, SWB. Work duties included, cabling, labeling, wire wrapping, iron work sewing
cables, Power Cuts, testing of equipment, fiber testing, quality inspections, and close out
paperwork.
ITAC
Birmingham, Alabama
Central Office Technician III 01/06 to 07/08
Installation of CBX-500 ATM switches, Tellabs, Titan 5500,
Redback SE800, DDM Plus, DDM 2000, DMX, Dslam, DS1, DS3,
installation of voice and data cable and coax cable,
uninstall existing cables, p-touch labeling, test
certifying. Inventory job material.
Keep a material used and needed log.
Fire Stopping conduit and walls.
Wire wrapping, lacing cables, iron work, mops, JIMS, misc
paperwork, QA inspections, and power
installation in a BDFB. Reading blueprints and marking redlines.
20/20 Diversified Services Inc
Pensacola, Florida -Cable Technician 09/05 to 11/05
Installation of cat 5e voice and data cable and coax cable,
uninstall existing cables, hang j-hooks, installation of
raceway, p-touch labeling and Brady labeling, certifying
cables by testing new cables and some MNCI existing cables
with a Fluke Tester. Inventory job material before
commencing to work. Keep a material used and needed log per
job. Cable footage used and scrap log.
Fire Stopping conduit and walls.
Punch down on a 66 and 110 blocks and Hubble Premise jacks
in IDF closets and customer locations. Reading blueprints and marking redlines.
Texas Instruments Dallas, Texas
April 2005 to September 2005
Supervisor – Gigi Valtuena
MAC’s (Move Add Change) requests and Star’s trouble
tickets. Install new service and maintain existing voice
and data lines. Activation of data cables.
Test and certify data cables. Activation of digital and
analog phone lines. Install new and maintain all phone
equipment Meridian 2008,2616,2616D, Cisco IP phones and
polycom speaker phones. 5000 plus work stations for Texas
Instruments. Disconnect move and reconnect all computer
peripherals. Punch down block 66/110. Siemens patch panels.
Siemens and Hubbel wall jacks. 568B, RJ 45, 11, cross
connects, wire wrapping. Testing equipment used Fluke DSP-4000 and
Fluke Net Tool.
The Total Connection LLC Point, Texas
August 1, 2003 to April 2005 Project Supervisor
Project Manager
Job Description: Various paperwork tasks, interfacing with
customers and contractors, site surveys, travel, deposits,
equipment transportation, installation of data, voice and
audio cabling and equipment, reading blue prints, and
redlines, daily, weekly of by job progress reports and
functions. Commercial installation for retailers: POS
cables, registers, sigcaps and printers,
also termination of fiber and certifying cable testing.
Volt Telecom Tucson, Arizona
October 4, 2002 to May 2, 2003 Project Manager and Quality Assurance
Senior Supervisor is Ron Davis
Project Manager and Quality Auditor
Job Description: Familiarity with ISO 9000 and related
commercial standards for installation of ISP and OSP for
Telecommunication networks. Quality assurance of ISP
cabling infrastructure, T568 A/B Wiring Standards,
Connecting of fiber ST and SC connections and interfacing
with customer and local personnel.
Testing with the Agilent 350 wire scoop for legacy cables,
Cat 5e and fiber OSP, Installation of LIU Panels, IDF
Cabinets, Single Mode and Multi Mode with daily reports and
hour tracking for up to 200 workers for the Arizona School Project.
Superior Technical Resources, Inc. Dallas, Texas
Supervisor: Maxine Vincent
May 8, 2000 to April 2, 2002
Supervisor / L4 Lead Installer
Job Description: Knowledge of SBC and BICSI installation
standards, ISO 9000, T568 A/B Wiring, EIA/TIA standards
also. School/Colleges cabling and tear-outs.
Central Office Wreck Outs, BDFB Installation, DMS Card
Installation, BTS Installation, Ericsson Equipment
Installation, Series 6 Model 640 Voice Mail System,
Motorola 208 A/B Modems, Adtran ACT 1900 and 2300 Channel
Banks, Access Carrier Mini Dacs, Alcatel Litespan 2000, AFC
UMC 1000, Alcatel- 1630, 1631, 1603, ADSL 1000, Siecor Line
Splitter Bays, Adtran 3192,Telecom Solutions “BITS” Clock
DCD 523 and DCD 400, Fujitsu FLM 150, 600 and 2400, ADC
DSX-1 and DSX-3 panels, RJ 45 connectors and testing, 66
and 110 punch down panels, Dantel Alarms, running jumpers,
Cisco Routers, 1924 and 2514, A/I switches, OSP panels, FOT
panels, Hendry and Telect fuse panels, running, terminating
and testing fiber, coax, cat 3,5,6 and 7 and many different
kinds of cables, Lacing cables, color codes for all
cabling, Iron work, labeling, marking and drilling of
floors, lacing, wire wrapping, BNC connectors, ADC - QCP
panels, Spec and print reading, marking and correcting as needed, power cuts.
In charge of several Litespan projects and able to create
documentation needed such as, MOP, IA, test records, etc.
Worked in close contact with engineers and SWB COM techs,
knowledge of most testing procedures with associated equipment.
T.A.G. Delmar, New York
Supervisor: Charlie Hoffman
August 1999 to May 2000
Supervisor / L3 Lead Installer
Job Description: Knowledge of SBC and BICSI standards, ISO
9000 and EIA/TIA standards. Cisco Router Systems, GRS
16/80, WS 6509, 7507,7513,2511,2924,5300,5800, NEC RC-48DX,
NEC Spectral Systems, ADM Systems, TTS Test Bays, Nortel
Breaker Interface Panels, Raychem Miniplex, Alcatel DACS,
1630,1631, RJ 45 connections and testing, Running cat 5 and
6 and testing, Patch panels 66 and 110 test and turn-up,
ADC and Lucent DSX-1 and DSX-3 Panels, Cosmic frame and
MDF, ADC and Lucent X-connect panels, Knowledge of most
testing procedures for associated equipment.
BDFB experience, power and grounding, Amphenol connectors,
BNC connectors, crimping, lugging, lacing, iron work,
labeling, marking and drilling floors layouts,
fire stopping, running fiber and testing fiber through
T-Bird for db loss, D-MACS alarm systems.
Knowledge of AT&T and Ameritech installation requirements.
Butler Telecom Irving, Texas
Supervisor: James Gooch
April 1997 to August 1999
Installation Supervisor
Job Description: I can create all documentation required
for SWBT standards (MOP, I/A, C/A, MDR, JIMS, TEST
RECORDS,IN PROCESS AUDITS.) Able to read TEO, SPEC
DRAWINGS AND FLOOR LAYOUTS. Knowledge of equipment: AT&T
Lucent 5ESS 2000 Switches, Tellabs Titan 5500, Wescom Dual
Line Plus ADC and Lucent DSX –1 and DSX – 3 panels, Cosmic
frame, MDF, Rel-Tec Disc’s bays, FLM 150,600,2400 and Trib
shelves, Telecom Solutions “BITS” Clock DCD 523 and DCD
400, Adtran 3192, ADC and Lucent Com panels, Nortel DMS-100
and 250, ADC X-connect panels, Dantel Alarms, Hendry and
Telect fuse panels, power, grounding, crimping, lugging,
lacing, iron work, wire wrapping, ADC-QCP panels,
fire stopping, BNC connectors, BDFB, labeling. Knowledge of
most testing procedures and use of T-Bird with associated
equipment. Have seen over 15 to 20 projects at a single
time in the Dallas/Ft. Worth area, and also in charge of
scheduling 40 plus installers for said projects.
Site surveys done regularly. Working in SWB CO’s and GTE also.
Steven McCurley
Truck and tools.
Salary and references upon request only.