**** ******** ***** *****: 615-***-****
Nashville, TN 37205 E-Mail:
********@*******.***
Jeff Spodnik
•
Summary Penchant for both qualitative and quantitative analyzes with intense desire to establish cause and
effect relationships for maximizing efficiencies
• Technical proficiency with a wide variety of numerical and statistical software; aggressively
seeking to expand knowledge base for evolution of enhanced problem solving
• Creative and entrepreneurial spirit that aggressively seeks best solution based on quality and
interpretation of data
• Servant-style leadership that fosters collaborative effort with both internal & external customers
Career Advancement 2007–present Zeledyne/Carlex Corporation, LLC Nashville, TN
Senior Manufacturing Engineer, Windshield Fabrication
• Increased throughput by 20% through cycle rate, uptime, & yield
• Helped reduce bracket-to-box scrap on high cost products from 30% to 15%
• Worked with team to successfully launch new vinyl, paint, & value-add products
2001–2006 Visteon/ACH Corporation Nashville, TN
Operations Superintendent, Body Glass Fabrication
• Increased productivity by 40% to generate Best in Class manufacturing operation.
• Improved $30 million annual budget performance from –10% to +15%.
• Reduced department quality rejects from 785 to 9 parts per million.
• Lowered OSHA-recordable injuries by 75%.
1999–2000 Visteon Corporation Nashville, TN
Advanced Technologist, Research and Development
• Led technology exchange in Japan that opened $3 million market in Europe.
• Identified design flaw following launch worth $2.5M in annual warranty costs.
• Conducted competitor benchmarking for application of lean manufacturing.
1998–1999 Ford Motor Company Nashville, TN
Customer Liaison, Quality Control
• Received Global Quality Award saving $750K in annual warranty costs.
• Implemented automated SPC, skilled in FMEA, PPAP, & QS/ISO systems.
• Developed statistical skill set (DOE, hypothesis testing, etc.) for problem solving.
1994–1997 Ford Motor Company Nashville, TN
Industrial Engineer, Facilities Management
• Authored, cost-justified, installed, & launched facility projects to $2 million.
• Performed time studies and authored detailed budget proposals to $45 million.
1989–1993 Ford Motor Company Nashville, TN
Process Engineer, Cut/Grind/Bend/Temper
• Redesigned tempering furnace to reduce scrap & downtime by 15%.
• Developed new products with Concept-to-Customer manufacturing skill set.
•
Education M.B.A., Belmont University
• M.S., Material Science, Vanderbilt University
Expertise APQP, DFMEA, FMEA, PPAP, Fishbone, 8D, Control Plan, Gage R & R, ISO, QS, TS, DOE, SPC,
5S, JIT, Kaizen, 5 Why, Error Proofing, Poka Yoke, Time Study, Process Flow, Bottleneck, Lean, Six
Sigma, SOP, Batching, In-Line, DFM, TPM, Ergonomics, JSA