Post Job Free
Sign in

Engineer Manager

Location:
Spartanburg, SC
Posted:
October 04, 2013

Contact this candidate

Resume:

To Whom it may concern,

I am presently not work, I have just finished working with a 2nd

shift position for Viracon in Owatonna, MN as a Loader/Seamer on the

production line for Tempering Line. My plan that started two years ago to

get into the drafting department has come but it has been passed over. I

have been in contract engineering most of my life. I know that most major

corporations generally hire from within and the only way to see their

intranet is to be working for them. I have been waiting for this

opportunity and the plan worked for the interview process but I did not

take in the HR problem. I was passed over for a man that had seniority but

he had no education in Drafting or ability to run Autocad. This is why I am

back to the contracting because of having a great background in drafting,

with over thirty years of experience and education.

John Daniel Ramp

51 Arbours West Lane, Moore, SC 29369

**********@*****.***

507-***-****

Professional References

Dave Welte 507-***-****

Greg Graham 239-***-****

Education

1999-2000 Bob Jones University, Greenville SC (Major Pastor Preparation)

1979-1980 International Correspondence School of Sharon, PA. (Majors:

Geometry & Trigonometry)

1977-1978 Air Force Technical School of Shanute, lll. (Training: Aircraft

Maintenance)

1974-1977 Mercer County Vocational School of Mercer, Pa (Design & Drafting)

1971-1977 Reynolds High School of Transfer, Pa. (Diploma for Vocational &

Academic)

Licenses/Standards Known held:

State of Florida: Manufacturer of Explosive (2006 to 2009)

Responsible person to the Federal Bureau of Investigations (FBI)

MSHA Certification

National Trainer for Royal Ambassador ( NAMB) North American Mission Board

Risk Management Certification

. ANSI Y14.5-1994 Drafting Standards

. ISO 9001, Quality Systems

Experience

2011 June to August 2013

Viracon/Dohery, Owatonna, MN (Temp)

Position held: Loader/Seamer

?Loading glass to table for production

? Seam the glass for tempering for production

2011 Jan to August 2011

Dave Welte/Inventor, Rochester, MN (Contract)

Position held: Autocad Drafter (Ver. 2004)

? Supply drawing of 3D for inventor's approval

? Turn 3D drawings into shop drawings for production

Sept 2010 to Jan Publix

(@ the Strand) in Naples, Florida (PT)

Sept 2010 to Jan

Ironworks of Naples, Florida (PT)

Position Held: Autoad Drafter (Ver.2009 & 2010)

? Supply drawing of 3D for customer approval

? Turn 3D drawings into shop drawings for production

April 2010 to August

U.S. Census Bureau, Fort Myers, Fl(FI)

Work preformed was responsible for the day-to-day management of twenty

Census Enumerators. Trained all of the Enumerators in the proper procedures

for time sheets and reporting of activities in accordance with standard

Census Operating Procedures. Planned and organized the work of the staff.

Managed the work of the staff and provided administrative assistance as

required. I was constantly praised for the outstanding work performed by

the team.

Feb 2010 to May 2010

Whole Foods Market, Naples, FL (PT)

May 2009 to April 2010

Florida Irrigation Supply, Naples, FL (PT)

Sept 2008 to Feb 2009 Western Blasting

Technologies, Marysville, Ca (Contract)

Position held: Manager/Estimator/Salesman

Work consisted of analyzing requirements from various requests for

proposals (RFPs) for California Transit Projects and a number of general

contractors. Gathered pertinent data from the solicitations and developed

well thought out solutions. I carefully fulfilled requirements to

communicate recommended solutions both orally in presentations to senior

management and in writing.

?Managed Drill & Blast Company

?GIS/GPS quarry and inventory of spoils (AutoCAD 2005/MS Office) (Trimble

GPS)

?Responsible for mapping the location of holes

?Followed proper procedures for each and every blast.

?Record information in AutoCAD 2005 and Excel files

Jan 2005 to Sept 2008

Youngquist Brothers Rock, Ft. Myers, Fl (FT)

Position held: Manager/Engineer / Mapper / Inventory/Production Coordinator

The day-to-day management of twenty miners at the quarry and under my

supervision carried out several duties for operations of a drilling and

blasting department. Each and every miner went through several days of

training to be qualified and certified miners in the proper procedures for

time sheets and reporting of activities in accordance with standard Mine

Safety Hazard Agency (MSHA) operating procedures. Planned and organized the

work of the staff. Managed the work of the staff and provided

administrative assistance as required. The team was consistently praised

for the outstanding work of the team. These well thought out plans insured

the owners the rules and regulations were being look at with high regards

of safety towards each miner and the community at larger. There also three

licenses required by the state of Florida to perform these duties of

blasting, Manufacturing of Explosives, a User and Blaster. With these we

were able to produce an emulsion at the plant I also managed for our

department. Following strict guidelines set by Department of Transportation

to haul this emulsion to the quarry in just one step of the blast

procedures.

?Managed Drill & Blast Department and Emulsion Plant

?GIS/GPS quarry and inventory of spoils (AutoCAD 2005/MS Office)(Trimble

GPS)

?Responsible for mapping the location of holes

?Followed proper procedures for each and every blast.

?Record information in AutoCAD 2005 and Excel files

Jan. 2003-2005 EP Equipment USA,

Duncan, SC (FT)

Position held: Facility Engineer / OEM / Warehouse: Shipping/Receiving

?Responsibilities included drawing up the parts used to remanufacture

plants overseas; mainly material handling equipment and parts.

?AutoCAD Lite 2004, Excel, QuickBooks, Microsoft Office, Adobe Acrobat

programs used to perform job responsibilities

Jan. 2000 to2003 Mascot Homes,

Inc., Gramling, SC, (Contract)

Position held: Cad Operator/Floor Production Coordinator: Production Floor

drawings (Microstation)

?Prepared all modification to orders that pertained to the various

departments.

?Over load of cabinet for all houses built so I assisted in build this

cabinets for assembly line

?Microstation V7and Power Draft used to perform job responsibilities.

Jan. 2001 to July Tindall Engineering, Spartanburg, SC.

(Contract)

Position held: Cad Operator: Special Project: Magnolia Parking Garage

(precast walls)

?Supply drawings for the flooring of parking garage called the Magnolia

Project which was double tees. Details were rebar, sections of D-tee and

layout of each floor to the garage.

?Liaison between project architect and draftsmen

?AutoCAD 2000 and Microsoft Office used to perform job responsibilities

Jan. 1994 to 2000 Glades Electric Cooperative, Inc. Moore Haven,

Fl. (FT)

?Converter Cad drawings to EPE Line lose

?Truck Maps for Linemen

?Facilities management

?Drawing lines for system maps and other mechanical drawings.

?Coordinate projects directly with the power supply manager.

?AutoCAD Rel. 14 was the base drawing package, Map 2.0 and ADE for

management of base maps, EPE for the SQL relative database on querying

information between billing and mapping services.

?Accomplishment: Completed the very first computer driven truck maps

consisting of 350 pages to every book and supplied 25 books to the field.

There are other fields as well as mechanical and network systems.

1993to 1994 Perry Corporation, Jupiter, FL. (FT)(Contract)

Autocad Drafter

1990 to 1993 Pulse Engineer, College Park, MD. (FT) Autocad

Drafter

1988 to 1990 IBM Manasas, VA. (FT)(Contract) Microcstation Cad

Drafter

1985 to 1988 BMY Combat Systems, York, PA. (FT)(Contract) Board

Drafting

1980 to 1985 Magnetics, Sandy Lake, PA. (FT) Board Drafting



Contact this candidate